Carlisle SynTec Fully Adhered EPDM System (Design A)

Поделиться
HTML-код
  • Опубликовано: 3 окт 2024
  • Instructional video for an adhered EPDM system. (Design A)

Комментарии • 9

  • @TURTLEORIGINAL
    @TURTLEORIGINAL 3 года назад +5

    "Allow the membrane for 30 minutes before bonding. Good one, lol.

  • @RoofingFacts
    @RoofingFacts 2 года назад +4

    I'm shocked no one wanted to point out the plates were put in the wrong spot in over half the scenes, both per Carlisle specification and ANSI/SPRI.
    Plates are never supposed to be within 3" of edges of the insulation (or rather, when they are that close they don't provide the proper uplift resistance and another plate must be added in those area)
    They even mention the fastener should be at least 6" back then not 4 scenes later show plates along the edge.

    • @lucasmaluco2135
      @lucasmaluco2135 Год назад

      well i do install in bouth sides of the joints if not they lift,thats basic

  • @justtruth8310
    @justtruth8310 6 лет назад

    can I install the underlayment on top of existing asphalt shingles or must they be removed first?

    • @hproofing779
      @hproofing779 5 лет назад

      Mancanitley fixed

    • @xephael3485
      @xephael3485 2 года назад

      you can do whatever you want to... your mom gave you a permission slip apparently.

  • @illflavason715
    @illflavason715 5 лет назад

    No vapor barrier

    • @shamwow7996
      @shamwow7996 2 года назад +2

      Don't need it... The EPDM is waterproof lol