DAB ESYBOX VFD Constant Pressure Pump System

Поделиться
HTML-код
  • Опубликовано: 8 фев 2025
  • ХоббиХобби

Комментарии • 10

  • @aaronsmith8414
    @aaronsmith8414 4 месяца назад

    How do you change the pressure vessel onsite? There doesn't seem to be any info in the manual

  • @daimiperez3336
    @daimiperez3336 2 месяца назад

    Shutter Valve for DAB ESYBOX (230V) from your website but it does not allow me to do it, it gives me an error.How can I buy it?Thanks

    • @rainwaterequipmentllc7835
      @rainwaterequipmentllc7835  2 месяца назад

      We aren't experiencing any issues. If you can't order from this page...rainwaterequipment.com/shutter-valve-for-dab-esybox-230v/
      call 877-331-7008 to order. Thanks.

  • @tractor629
    @tractor629 9 месяцев назад

    What’s your experience using this pump on a shallow well?
    The manual sais it can pull water from 26’ deep..
    I’m my situation I’d be about 20’ deep from pump to water surface..

    • @rainwaterequipmentllc7835
      @rainwaterequipmentllc7835  9 месяцев назад +1

      I don’t know of any of our clients who have done that with this pump, but they have used smaller versions of the ESYLINE pumps to lift water. While it does have the ability to lift a maximum of 26 feet, I don’t ever like to test the limits of a pump’s lifting capability. It’s my understanding that it will significantly reduce the flow rate if it must lift the water before pushing it.

  • @bresslersplumbing
    @bresslersplumbing 2 года назад

    How much electricity will the 110 volt dab unit use. Client claims herr electric bill went up several hundred dollars. She lives alone so I don't feel it is the pump.

    • @rainwaterequipmentllc7835
      @rainwaterequipmentllc7835  2 года назад

      Since this pump is dual voltage 115/230V...
      9.6 Amps at 115V
      4.8 Amps at 220V
      They are very energy efficient due to the soft start feature and the fact that the motor speeds up/down based on use.

  • @SumaDarmana
    @SumaDarmana Год назад

    How to set presure automatic smart1,5 dab

    • @rainwaterequipmentllc7835
      @rainwaterequipmentllc7835  Год назад

      Hold down the “mode” and “set” buttons simultaneously for about 3 seconds. When PSI begins to flash, use the up or down arrows to select the desired pressure, and press “set” button. That’s it.