Nice explanation sir mai bhi Bangalore me Sandeep sir ke classes se bahut kuch sikha hu yeah video best hai leken sir beam kyu rmt..aur sqm yeah aisa kyu
Bhai agar only slab ki baat karenge to hum slab area consider karte hai jiske wajah se 1 Vertical Ms Props kitna area cover karega wo nikalte hai. That's why props spacing is multiplied.
🟢 𝐅𝐨𝐫 𝐨𝐟𝐟𝐥𝐢𝐧𝐞 𝐓𝐫𝐚𝐢𝐧𝐢𝐧𝐠/ 𝐨𝐧𝐥𝐢𝐧𝐞 𝐥𝐢𝐯𝐞 𝐬𝐞𝐬𝐬𝐢𝐨𝐧 𝐨𝐫 𝐚𝐧𝐲 𝐚𝐬𝐬𝐢𝐬𝐭𝐚𝐧𝐜𝐞 𝐲𝐨𝐮 𝐦𝐚𝐲 𝒄𝒂𝒍𝒍 𝒐𝒓 𝑾𝒉𝒂𝒕𝒔𝑨𝒑𝒑 𝒂𝒕 +𝟵𝟭𝟵𝟳𝟭𝟭𝟭𝟱𝟱𝟱𝟴𝟱
🔴𝐅𝐨𝐫 𝗥𝗲𝗰𝗼𝗿𝗱𝗲𝗱 𝐬𝐞𝐬𝐬𝐢𝐨𝐧
𝐃𝐨𝐰𝐧𝐥𝐨𝐚𝐝 𝐑𝐞𝐢𝐧𝐟𝐨𝐫𝐜𝐞: 𝐂𝐢𝐯𝐢𝐥 𝐄𝐧𝐠𝐢𝐧𝐞𝐞𝐫𝐬 𝐥𝐞𝐚𝐫𝐧𝐢𝐧𝐠 𝐚𝐩𝐩.
👉𝐀𝐧𝐝𝐫𝐨𝐢𝐝 𝐚𝐩𝐩 𝐥𝐢𝐧𝐤: bit.ly/425ebrk
👉𝐖𝐞𝐛/𝐏𝐂/𝐋𝐚𝐩𝐭𝐨𝐩 𝐋𝐢𝐧𝐤: web.reinforceqst.com/
👉𝐌𝐲 𝐢𝐧𝐬𝐭𝐢𝐭𝐮𝐭𝐞 𝐚𝐩𝐩 𝐟𝐨𝐫 𝐈𝐎𝐒 𝐥𝐢𝐧𝐤: apple.co/3HFwBqo
Org code : avywj
📧 Email : reinforceqst@gmail.com
🌐 Website : www.reinforceqst.com
Best channel for civil engineering students. Thanks u sir for explaining in such details
Annealed wire also called in technical word
Outstanding explain sir ❤❤❤❤❤❤
Nice explanation sir mai bhi Bangalore me Sandeep sir ke classes se bahut kuch sikha hu yeah video best hai leken sir
beam kyu rmt..aur sqm yeah aisa kyu
Nice explanation
Thank you sir
Bahut badiya super 🙏
Slab ke formwork me Pura pura Area le liya...kya Column jo bech me aa jate h usko deduction karte h.... please answer me...
Sir what about column size ,we have to deduct na?
Sirji please make videos on different pile tests like O-Cell test,PIT test, PDA test etc. It will be very informative
Is PCC shuttering quantity to be consider in billing as per IS 1200?
Sir beam bottom me extra 15% add q kre wo to slab flat ara me hi include h
Thanks
Good
binding wire ka technical tearm "Tie wire".
Sir please make video on MIVAN shuttering
Apparently, as per your analogy, you seem to have considered the consumption quantity of nails as 400 grams per ply board? Please review 🙏
Sir ager beam ka size different ho tu tbi bhi 30% hi liya jayega kya sir
Nahi Bhai asey estimation karogey to accurately nhi hoga😢😢
Sir slab concrete me kitne % beam liya jata h sir
Sir Slab props ke liye .9x.9 ku kiye h
Props ka c/c distance .9m hota h na
But ye to Area ho gya .9x.9
Please explain me sir.
Bhai agar only slab ki baat karenge to hum slab area consider karte hai jiske wajah se 1 Vertical Ms Props kitna area cover karega wo nikalte hai. That's why props spacing is multiplied.
Sir Quantity of batten value should be 20.88 Cub m
Technical name for Binding Wire is "Tie Wire or Annealed Wire".
Where is slab flat area for fly board? 226m2
Slab ke liye Ms props spacing 0.9×0.75 m hoga kyu ki Ms plate ki size 0.75×0.6 hai ....aapne 0.9 × 0.9 bataya hai
Spacing btw the props should be 0.9m under slab, so the area that prop will cover will be 0.9*0.9
sir nails ke liye thumb gule galt lag raha hai aap ne 40 % bataya hai
Sir, aap slab ka ply calculate nahi kiya
Slab area devide by one ply size is the ply quantity
Ji sir ji
Galat nikla plate nos..
Specifications of MS Channel
Thank you sir
Good