Really cool set up man... Especially the speed limit detection block for the runaway safety track switch. Nice detail to realism of prototypical operational practices and safety protocols and procedures of that line. Very nice
Very nice. I'm not very familiar with how SOU designed their signal system on Saluda grade. Neat idea about the run away track timing! Is that how the prototype did it? Also, will you eventually interlock the switch inside each OS to the lined route? Lastly, did the passing sidings on Saluda all have point derails at each end?
Excellent work getting the details right. 👍
Really cool set up man...
Especially the speed limit detection block for the runaway safety track switch. Nice detail to realism of prototypical operational practices and safety protocols and procedures of that line. Very nice
Very interesting !!!! The lights are great. A lot of difficult decisions. Thanks for the update !!
Thanks!
Very interesting! The resemblance to the actual grade is awesome.
Tom Clark
Thank you sir!
Outstanding work!
Thanks!
This is amazing. Your work is fantastic. I am truly impressed with the signals.
Thank You Sir
Those sd45 high hoods sound great.
Very impressive
Very nice. I'm not very familiar with how SOU designed their signal system on Saluda grade. Neat idea about the run away track timing! Is that how the prototype did it?
Also, will you eventually interlock the switch inside each OS to the lined route?
Lastly, did the passing sidings on Saluda all have point derails at each end?
Yes that’s how the prototype was. I’ll have to get back to you on the interlocking. And yes the passing sidings had the details on both ends