Hello I have been in your channel for long. It has been a long and interesting journey. I am a year three student sitting for knec exams next week. I wanted you to show us how to take off piping works and kitchen cabinet. I would be delighted if you help me
Ma'am I think the height for the height of the brick should be less than 850 mm We said 900 to the gl + 200 footing=1100 From the 1100mm we Ddt 200 footing Ddt 150mm topsoil and Ddt 25 mm reduce level to get 725. So if we say 725 add 175 height of reinstating we get the 900mm
@@paneah442 It is still not right in my mind as the ground level is not the same height as the blinding level. We know 200mm footing + 900mm wall + 200mm above ground projection where concrete bed top is, is 1300mm. Then surely you deduct the slab build up that finishes at the same level, i.e. 100mm concrete bed, 25mm blinding layer, and 250mm hardcore bed, giving you 375mm to deduct. This equals 925mm from underside of footing to formation level, OR (975-200) 725mm from top of footing to formation level. Look at the drawing behind her and work through it. I cannot see the area under the formation level to top of slab being 850mm.
Hello I was requesting if you can send me your email there is a question of substructure works you did earlier about girth is confusing so I wanted to share it with you
Thanks so much for your time remain blessed have understand your explanation it was very clear.
Very nice madam for those studies
Wow!!! So amazing congratulations for good teaching 🙏🙏
It's my pleasure
Thanks you have helped me out
Happy to help
Thanks alot am in Uganda and I want an example of taking off for Cavity walls
Waoo. IAM now able to sit for ma exam
Hello I want to thank you for your support you have been giving me here please I need a video of schedule of work for reinforcement bars
Schedule of work for reinforcement bars?
Good 👍
Thanks for this. Video I have. Got some thing is this the only thing required for taking off substructure
No. She has a part 1 video.
Good job 👏🏾
Umeniokolea sem aky the lextures are really nice 🎉well explained
Am glad I helped.Asante sana
Good explanation
Good how sbout Taking off of column ?
thank you very much
Glad it helped
Thank you lady
Good
I will happy so if I join your class
Kindly rech out to me via my email naomi.kangangi@gmail.com.Will be happy to give you tutorials
Informative
Thanks you! Kindly share our videos with your classmates.Thanks alot for watching
@@easyqs
*sure*
And also expecting from your side
for my channel.
Hello I have been in your channel for long. It has been a long and interesting journey. I am a year three student sitting for knec exams next week. I wanted you to show us how to take off piping works and kitchen cabinet. I would be delighted if you help me
Ma'am I think the height for the height of the brick should be less than 850 mm
We said 900 to the gl + 200 footing=1100
From the 1100mm we Ddt 200 footing Ddt 150mm topsoil and Ddt 25 mm reduce level to get 725.
So if we say 725 add 175 height of reinstating we get the 900mm
we were lookin for the height to formation level not ground
@@paneah442 It is still not right in my mind as the ground level is not the same height as the blinding level.
We know 200mm footing + 900mm wall + 200mm above ground projection where concrete bed top is, is 1300mm.
Then surely you deduct the slab build up that finishes at the same level, i.e. 100mm concrete bed, 25mm blinding layer, and 250mm hardcore bed, giving you 375mm to deduct.
This equals 925mm from underside of footing to formation level, OR (975-200) 725mm from top of footing to formation level.
Look at the drawing behind her and work through it. I cannot see the area under the formation level to top of slab being 850mm.
Please sister, l do not understand you at the concrete part. My question is, does concrete measure in square meters or cubic meters?
It depends on the method of measurement you are using
Thanks
.... 👍👍
Welcome so much
This is great
I have a question
Spot on
Thanks so much
Thank you
You're welcome
I would like to join your live class
For now we only have membership only classes live.. planning to have subscriber classes in future
💯
Hello I was requesting if you can send me your email there is a question of substructure works you did earlier about girth is confusing so I wanted to share it with you
naomi.kangangi@gmail.com