Grounding System Design and Installation -7 Steps

Поделиться
HTML-код
  • Опубликовано: 25 ноя 2018
  • Operations in the video are applied in the following order:
    1- Measurement of spesific resistance of the ground by Wenner Method (00:12)
    1 mt. distance between rods (00:15)
    2 mt. distance between rods (01:44)
    3 mt. distance between rods (02:20)
    4 mt. distance between rods (02:45)
    2- Driving earth rods to the ground (03:56)
    copper rods driven as wished depth (04:42)
    jointing can be made to reach necessary depth (04:45)
    earth rod quantity completed to reach necessary resistivity (04:55)
    the path between grounding point driven (05:35)
    used materials (05:40)
    3- Installing grounding cables and connecting them with the rods (05:53)
    conductor and earth rod are connected by a special joint clamp (06:04)
    4- Exothermic welding joints to be made in necessary connections (06:38)
    5- Using TDM (Ground Enhancement Material) (07:31)
    6- Installing Earth Pits (08:31)
    7- Driving Earth Rods and Measuring Ground Resistivity (08:49)
    Amper Elektrik İnşaat ve Sanayi A.Ş. is one of Turkey's modern, well-established and innovative organizations with a wide range of products, especially lightning protection and earthing systems, which has achieved many successes in Turkey and abroad for more than 60 years, and has undertaken the supply of many domestic and foreign projects. Started in 1962, the company still exists today with the consciousness of the first day and maintains its place in the sector.
    Don't forget to subscribe to our RUclips channel!
    www.amper.com.tr
    www.ampermarket.com.tr
    #grounding #groundingtechniques #groundingsystem #groundingdesign #groundingsysteminstallation #groundingsystemandequipment #groundingsystemelectrical
  • НаукаНаука

Комментарии • 24

  • @PedroAntonio-tq6nb
    @PedroAntonio-tq6nb 3 года назад +3

    Amazing video

  • @KidsWorld-Globe
    @KidsWorld-Globe Год назад +1

    What a great video
    Thanks sir

  • @mpirokajosephmgcokoca2355
    @mpirokajosephmgcokoca2355 5 месяцев назад

    Detailed video 👍

  • @yassersalim2540
    @yassersalim2540 3 года назад +1

    The end of the video, you messuer 1.2 ohm using 4 G?

  • @maanomar3859
    @maanomar3859 6 месяцев назад +1

    👍

  • @michaelphillips-nxs
    @michaelphillips-nxs 2 года назад +4

    is this a music class

  • @a.ibrahim1865
    @a.ibrahim1865 2 года назад +2

    This my video how to take this and put in your chanle 🤔
    I make this video in Egypt since 8 years ago with AMPER brand. When i worked in my old company.
    But any way very nice video with Ibrahim mohsen. ARAM COMPANY

    • @mohamedmaaish9182
      @mohamedmaaish9182 Год назад +1

      Do you have detailed written explanation for this method?

  • @reflectionofperfection4848
    @reflectionofperfection4848 3 года назад +2

    what is the distance in 3 point test?

  • @wiwinji
    @wiwinji 8 месяцев назад +1

    What kind of cement ?

    • @paul914
      @paul914 8 месяцев назад +1

      ground enhancement material

  • @MrWaffleOfficial
    @MrWaffleOfficial 3 года назад +5

    ever heard of a hammer drill

  • @saidivvela5829
    @saidivvela5829 4 года назад +1

    After driving the earth rod, you gain measured the resistance of 32ohm , what is that?

    • @mohamedelnahas9158
      @mohamedelnahas9158 2 года назад +2

      He wanted to say it is not good and wait to see how we will fix it

  • @Themachinewon
    @Themachinewon Год назад +2

    You guys looked like Pro's right up to the point of running the ground wire on top of that plastic pipe, Epic FAILURE heading your way... It's been four years, wonder if it's leaking or the people in the building cant figure out why the get a buzz from their water !

    • @IAmThe_RA
      @IAmThe_RA Год назад +1

      Where is the plastic pipe?

    • @Themachinewon
      @Themachinewon Год назад +1

      @@IAmThe_RA To be exact 7:18, looks as both ground wires are crossing tubes… what type ?

    • @IAmThe_RA
      @IAmThe_RA Год назад +1

      @@Themachinewon Does not really matter. Any metal pipe should be grounded which means water is also grounded (well water is already grounded if it is pumped up directly from underground).

  • @faheemboy
    @faheemboy 3 года назад +3

    This copper wire is very expensive

  • @menemeldinali7425
    @menemeldinali7425 3 года назад +3

    why you used GEM all along the path? you don't need it ,wrong wrong wrong, the purpose of the conductor just to conduct between rods, not between the conductor and earth,

    • @kimac0110
      @kimac0110 3 года назад +1

      Así es, tienes toda la razón, La instalación no responde al objetivo real de una puesta a tierra. Falla el concepto de lo que es un sistema de puesta a tierra.

    • @oloyeadeniran8894
      @oloyeadeniran8894 2 года назад +1

      I believe their reason was because the conductor is running horizontally making it also a good path to the ground thereby making the reisitance lower as expected

    • @ciscodesignercciesameer4564
      @ciscodesignercciesameer4564 8 месяцев назад +1

      that's how I fell,you are 100% right

  • @BELINC7
    @BELINC7 Год назад +1

    too technical , need an instructor not music