Размер видео: 1280 X 720853 X 480640 X 360
Показать панель управления
Автовоспроизведение
Автоповтор
I was sacked from class today and your video has really been a help
you're literally saving my life rn thank u so much
0(1200) + 7.667(900) = 6,900.30 , 13.6(1200) + 0(900) = 16,320.00 , 1.892(1200) = 2,270.40 3.252(900) = 2,926.80 2270.40+2926.80 = 5,853.60
Thank you for catching that, Michael. I'll see what I can add to correct it!
2270.40+2926.80 = 5,197.2
Thank you. Really appreciate this video
Thank you!You are very good!!!Have a good day!
thanks for this!!! this really help a lot to understand linear programming.
Great lessons, I so much love it.Kindly advise of the name of the graphing software, I need it urgently
Don’t know if this is still helpful but I believe it’s called desmos
Which one should have proritybof having the x when graphing and which one should have y..???
14:00 I try not to input the X >= 0 and Y >=0 to the Desmos, and the graphical result looks fine.
I don't know how to input those L(x) >= 2, S(y) >= 3 in Excel QM, but I try this instead - 2x+y >= 24; x+ 3y >=24. The result was, a $240 Maximum Profit with 0 large and 12 small outputs.
However, if turn L = 24 the result was a 220 maximum profit with 2 large and 6 small outputs - which is the same as your answer.
try lindo. it is easy to plug in the linear programming and find the solution
thanks , really helpful
In which application she is working in?
I was sacked from class today and your video has really been a help
you're literally saving my life rn thank u so much
0(1200) + 7.667(900) = 6,900.30 , 13.6(1200) + 0(900) = 16,320.00 , 1.892(1200) = 2,270.40 3.252(900) = 2,926.80 2270.40+2926.80 = 5,853.60
Thank you for catching that, Michael. I'll see what I can add to correct it!
2270.40+2926.80 = 5,197.2
Thank you. Really appreciate this video
Thank you!
You are very good!!!
Have a good day!
thanks for this!!! this really help a lot to understand linear programming.
Great lessons, I so much love it.
Kindly advise of the name of the graphing software, I need it urgently
Don’t know if this is still helpful but I believe it’s called desmos
Which one should have proritybof having the x when graphing and which one should have y..???
14:00 I try not to input the X >= 0 and Y >=0 to the Desmos, and the graphical result looks fine.
I don't know how to input those L(x) >= 2, S(y) >= 3 in Excel QM, but I try this instead - 2x+y >= 24; x+ 3y >=24. The result was, a $240 Maximum Profit with 0 large and 12 small outputs.
However, if turn L = 24 the result was a 220 maximum profit with 2 large and 6 small outputs - which is the same as your answer.
try lindo. it is easy to plug in the linear programming and find the solution
thanks , really helpful
In which application she is working in?