Geoga bridge construction

Поделиться
HTML-код
  • Опубликовано: 2 ноя 2021
  • Located in an exposed offshore area subject to high-speed winds and to potential typhoons, the cable-stayed bridge had to be equipped with the most robust cable anti-vibration system and durable stay cables.
    Freyssinet stay cable system was selected for its cable anti-vibration solution and most sustainable technology to contribute to ensuring durability of a structure subject to harsh weather conditions.
  • НаукаНаука

Комментарии •