Kabul municipality has to pay for special attention to this road as it should be an example for its work and creativity for people of Kabul to mention and remember Taliban with a good name : There should be space for parking lots for cars as lots of cars just park on the road causing traffic congestion So despite two one way roads going and coming there should be also parking lots marked for car parks when a car pulls off 2- there should be big pavements on both sides of the roads with enough benches on it as people can sit and enjoy 3- there should be street lights which it lights in real with a solar generator on the hill so people can see the scenery’s 4- The bit of the road which is build by the water reservoir should be walled off( concrete wall) for extending the pavements and protecting the road from water rise it will look beautiful and very civil 5- the road marking should include red marking for places where no CAR STOP or Parking allowed at any time I think 7 meter is not enough as you need pavements wide enough for people to walk otherwise you will not avoid congestion and it will be back to square zero Also the Qargha Dom needs to be build around it with stones and walls as for better look and avoiding further damage by water
به امید روزها بهتر برای تمام انسانها بخصوص ملت افغان یک سوال چرا فقط یک ماشین خاکبرداری هست باید ازاون ماشیها بزرگ باشه تابتونه زودتر خاک برادری تمام بش
خیربیبنت زحمت کشان افغانستان کبیر🎉🎉🎉🎉🎉
از دید من اگر اجازه تعلیم را بربانوان بدهند باورمندم که با نوشتن بیشتر آشنایی خوب حاصل می کنند.
نمونه خوبش شما هستید ...
اللّه مهربان خیر و برکت در دنیا و آخرت نصیب تان کند ❤❤❤❤❤❤
الحمدلله
څومره خوندور کار! ❤
خداراشكر
Kabul municipality has to pay for special attention to this road as it should be an example for its work and creativity for people of Kabul to mention and remember Taliban with a good name :
There should be space for parking lots for cars as lots of cars just park on the road causing traffic congestion So despite two one way roads going and coming there should be also parking lots marked for car parks when a car pulls off
2- there should be big pavements on both sides of the roads with enough benches on it as people can sit and enjoy
3- there should be street lights which it lights in real with a solar generator on the hill so people can see the scenery’s
4- The bit of the road which is build by the water reservoir should be walled off( concrete wall) for extending the pavements and protecting the road from water rise it will look beautiful and very civil
5- the road marking should include red marking for places where no CAR STOP or Parking allowed at any time
I think 7 meter is not enough as you need pavements wide enough for people to walk otherwise you will not avoid congestion and it will be back to square zero
Also the Qargha Dom needs to be build around it with stones and walls as for better look and avoiding further damage by water
Paghman main roads should all be developed professionally. It’s always traffic in spring and summer. People from all over Afghanistan visit Paghman
زنده و پاینده باد امارت اسلامی قهرمانان ازادی و ابادی
برایی فامیلی هم باید دربینی هفته یګ دوروز
ایجازه داده شود
خیلی گزارش عال
خی تا زمان این پروژه های تمام نشده طالبا است.
به امید روزها بهتر برای تمام انسانها بخصوص ملت افغان یک سوال چرا فقط یک ماشین خاکبرداری هست باید ازاون ماشیها بزرگ باشه تابتونه زودتر خاک برادری تمام بش
Building roads ✅
Opening girl schools ❌
ایا همین سرک پهلو هم جور می شود یا نخیر؟
ياده نه، دغه پروژه۔
لاربندي
لطفن عرض سرک را مطابق سرک جدید زمان جمهوریت بسازید