T.D. Williamson - SmartLay™ Pipeline Flood Prevention System

Поделиться
HTML-код
  • Опубликовано: 22 авг 2017
  • By preventing flooding as a result of wet buckle during offshore pipe lay operations, the SmartLay™ system mitigates risk to the pipe lay vessel and crew, protects as-laid pipeline, and helps pipeline owners and operators eliminate costs associated with standby dewatering spreads. SmartLay technology can be used in either shallow or deep waters.
  • НаукаНаука

Комментарии •