Thank you, Tom! Really helpful video. Could you please consider making a video about a specific example of a look-ahead schedule which would be detailed out, shown exactly how to name the files and also how the two schedules affect each other? If the short term schedule turns out to be different than what the master schedule is showing, then should you update the master schedule immediately? Or do master schedule updates happen at different times? When you update the master schedule, then that could also affect the short term schedule, it's like a loop, both affect each other. Should the client also be informed about it immediately?
Hello Dear Tom, I tried to paste in a new blank, but something was wrong. After pasting, I noticed that the information copied from the main schedule did not reflect correctly in the new blank. tasks moved back to the project start date. I could not fix this issue. do you have any suggestions?
I think because you lost the previous link for the first activity, im assuming you are a a pasting to a new file. For a short term schedule you could change the start date to the start date of your short term schedule or in this case you could also place a start constraint on the first activity(even though I don’t like constraints). Hope that helps
Excellent tutorial, leaders many times want more detail
Yes and the schedules should realign. Thanks for watching Max!
Thanks Prof for his filtering example. Wonderful!
Thanks Jacob!
Great vids Tom! Thanks thanks
Thanks for the kind words!
Thank you, Tom! Really helpful video.
Could you please consider making a video about a specific example of a look-ahead schedule which would be detailed out, shown exactly how to name the files and also how the two schedules affect each other? If the short term schedule turns out to be different than what the master schedule is showing, then should you update the master schedule immediately? Or do master schedule updates happen at different times? When you update the master schedule, then that could also affect the short term schedule, it's like a loop, both affect each other. Should the client also be informed about it immediately?
Professor, you are talking about a 4 weeks look ahead schedule but I see you back tracking for the previous 4 weeks. Can you explain that?
Thank you so much.
Thanks for watching Amit!
Very nice Tutorials. Many Thanks. I have a question regarding the downloads; are they the same files on each video or different for each posted video.
Often different but mostly based on the same project
Hello Dear Tom, I tried to paste in a new blank, but something was wrong. After pasting, I noticed that the information copied from the main schedule did not reflect correctly in the new blank. tasks moved back to the project start date. I could not fix this issue. do you have any suggestions?
I think because you lost the previous link for the first activity, im assuming you are a a pasting to a new file. For a short term schedule you could change the start date to the start date of your short term schedule or in this case you could also place a start constraint on the first activity(even though I don’t like constraints). Hope that helps
Many Thank. I will try@@TomStephensontraining
I change the start date manually in the new blank project. its work but It would be nice if it changed automatically @@TomStephensontraining .
How to create Planned Progress Complete or Baseline Percent Complete Vs Actual Progress Complete Curve Report in MS Project
I’ll add it to my list for future videos, thanks
How to add actual start and completion dates in a schedule