Another great informative video well done sir ,nice area with a hill view which area is it if you don't mind sharing the location and are there any lands available there thanks
The cost mainly depends on the distance from main power point to the property, which determines the number of poles and cables needed. Its also more expensive to run 3 phase supply as compared to single phase supply. Call / Whatsapp +233 552499123 for further information
Informative 👌
Much appreciated Sir
Another great informative video well done sir ,nice area with a hill view which area is it if you don't mind sharing the location and are there any lands available there thanks
Which phase is this, is it one phase or three phase.
We carried out both three phase and single phase installation.
Three Phase = 4 cables
Single Phase = 2 cables
@@weltonpropertyadvisory4994Thank you for the prompt reply, am at this stage in my building and recently went for a quote from the ECG.
What was the cost of extending electricity to the building.
The cost mainly depends on the distance from main power point to the property, which determines the number of poles and cables needed. Its also more expensive to run 3 phase supply as compared to single phase supply. Call / Whatsapp +233 552499123 for further information