Deployment of NY Style High-Rise Pack

Поделиться
HTML-код
  • Опубликовано: 30 авг 2021
  • A demonstration of deploying the New York style high-rise packs to make an interior attack on the 3rd floor utilizing Hilton Garden Inn Hotel.
  • КиноКино

Комментарии • 6

  • @aportman58
    @aportman58 Год назад

    Not sure where you guys are from but your high-rise pack demonstration and explanation was done very well! Thanks for posting! Be safe and have a Merry Christmas!

  • @williamayala1973
    @williamayala1973 Год назад

    Great video!

  • @MauricioTorti
    @MauricioTorti Месяц назад

    3:50 Hi Bro!

  • @SamboC177
    @SamboC177 11 месяцев назад

    I notice that you do not employ a shut off valve in the line. As a rule our brigade always fit a shut off valve in the line in case you need to add more lengths after the line is charged.

    • @travisthomas7987
      @travisthomas7987 10 месяцев назад +1

      Unscrew that nozzle tip and you could throw as much 1.75" on that ball valve as you want

    • @BenSingley
      @BenSingley 3 месяца назад

      I saw the standpipe valve, a gate valve right after the standpipe valve (before the pressure gauge) and then a break-apart tip on the nozzle, so there are three ways they could stop the flow of water to extend the line.