Track Surfacing

Поделиться
HTML-код
  • Опубликовано: 28 сен 2024
  • Single pour polyurethane track being put down and the process. At Aaron and Marie Jones Community Field in Blue River, Oregon a quarter of a mile away from McKenzie High School. The process from mixing the materials to painting the stripes. Put down by Atlas Track and Tennis.

Комментарии • 10

  • @JxmyHighroller
    @JxmyHighroller 14 лет назад +2

    sweet video, never knew thats how they did it

    • @savionicbond
      @savionicbond 5 лет назад

      How the flip did i find you here jxmy?

  • @Shaun1gza
    @Shaun1gza 9 лет назад +1

    How much does it cost to install a track surface?

    • @serenamichelle7740
      @serenamichelle7740 6 лет назад

      It depends on the system you plan to build. More details, welcome your any consulting. Email: serena5201@hotmail.com whatsapp :0086 18664805201

  • @jorgerodriguez-cn5wi
    @jorgerodriguez-cn5wi 5 лет назад

    what is the company called !

  • @Rochelle0615
    @Rochelle0615 10 лет назад +1

    Nice track! Great Install Atlas.

  • @pierrehere762
    @pierrehere762 3 года назад

    Did you use squeegees to put the self leveling liquid down??? We use rakes that have measured teeth to ensure we get proper yield, so a squeegee seems peculiar to me is all.

  • @thomasholmes8063
    @thomasholmes8063 6 лет назад

    As long as the weather cooperates. Fantastic job they completed. Worth every dollar.

  • @Shaun1gza
    @Shaun1gza 9 лет назад

    This is an awesome video, I have never seen an installation of a track surface before. Thanks for uploading.

  • @Israeleaguilar
    @Israeleaguilar 11 лет назад

    great video!!