Размер видео: 1280 X 720853 X 480640 X 360
Показать панель управления
Автовоспроизведение
Автоповтор
Vadodara mein main bhi kaam kar raha hu bullet train station ka 🥰 Its very awesome to taking our railway infrastructure and transformation to another level 🥰
Thanks
Track kb bichega Bhai , itna slow kaam kyu kr rhe ho
@@Jayant_Singh_PrasharBhai Thora aaram se yaar inki kya glti h agar delays ho rhe h toh,ye toh kaam pe jate ho honge n.
Doing great work
drone ko aur pass le ke jao taki aur acche se dekh paye
Wow, didnt know there was so much greenery in Gujarat!
Badhiya video. If possible final track laying & electrification jo kaam shuru hua hai Surat mein uska update dena bhai. Thanks 🙏
सुंदर विडियो 🎉🎉🎉
So good❤
WO SHINKANSEN E5 HI AA RAHI HE NA
Shayad nahi
ALL FUTURE RAIL SHOULD BE HIGH SPEED IF WE WANT TO BE SUPER POWER UP TO 2047
Surat depot ka update do waha electrification ka kam start ho gya ha
Tereko kaise pata
સરસ
🎉🎉🎉
❤❤❤❤
Bharuch mein main kam kar raha hun bullet train station
Okay
Jaldi bna Bhai station, bohut slow kaam chl rha hai
Mumbai station ka update dena chahiye aapko
Abhi जल्दी आएगी
Maharashtra side mei 80% banna baako hai. Gujarat side mei nearly 60% kaam ho chuka hai.
Ooo tab to Mumbai me kam hi kya hua hoga
@@ShubhamKumar-y5m3v tunneling bhi suru nahi hui Mumbai mei. Bass ground works complete hua hai. Par tunnelling jaldi ho jaane ka ummed hai
Vadodara mein main bhi kaam kar raha hu bullet train station ka 🥰 Its very awesome to taking our railway infrastructure and transformation to another level 🥰
Thanks
Track kb bichega Bhai , itna slow kaam kyu kr rhe ho
@@Jayant_Singh_PrasharBhai Thora aaram se yaar inki kya glti h agar delays ho rhe h toh,ye toh kaam pe jate ho honge n.
Doing great work
Thanks
drone ko aur pass le ke jao taki aur acche se dekh paye
Wow, didnt know there was so much greenery in Gujarat!
Badhiya video. If possible final track laying & electrification jo kaam shuru hua hai Surat mein uska update dena bhai. Thanks 🙏
सुंदर विडियो 🎉🎉🎉
Thanks
So good❤
Thanks
WO SHINKANSEN E5 HI AA RAHI HE NA
Shayad nahi
ALL FUTURE RAIL SHOULD BE HIGH SPEED IF WE WANT TO BE SUPER POWER UP TO 2047
Surat depot ka update do waha electrification ka kam start ho gya ha
Tereko kaise pata
સરસ
Thanks
🎉🎉🎉
❤❤❤❤
Bharuch mein main kam kar raha hun bullet train station
Okay
Jaldi bna Bhai station, bohut slow kaam chl rha hai
Mumbai station ka update dena chahiye aapko
Abhi जल्दी आएगी
Maharashtra side mei 80% banna baako hai. Gujarat side mei nearly 60% kaam ho chuka hai.
Ooo tab to Mumbai me kam hi kya hua hoga
@@ShubhamKumar-y5m3v tunneling bhi suru nahi hui Mumbai mei. Bass ground works complete hua hai. Par tunnelling jaldi ho jaane ka ummed hai