  • @nathenwallis5664
    @nathenwallis5664 7 лет назад +7

    as someone who builds these every day (I'm a floor truss production supervisor at a Truss plant ), it's really cool to actually see them being installed

    • @fiendeng
      @fiendeng 6 лет назад

      How do you sheath the ends? Where all the joist are stacked and 16",24" o/c ??

    • @julianmdanner
      @julianmdanner 5 лет назад

      Nathen Wallis... I have question for you... if I am building my own truss I have a span of 36 feet but there is a wall at 20 feet so that it is broken into virtually two spans 16 and 20 is it ok to build my truss the full 36 ft 16 in h width with 16 on center spacing?

  • @leestewart72
    @leestewart72 7 лет назад +4

    4:23
    Guy in yellow: You ready Red?
    Red: Yeah....nowhere to be seen. =D

    •  4 года назад

      Durp a durpa durp.

  • @erdene-ochirmijid4040
    @erdene-ochirmijid4040 2 года назад +1

    What is the length and height of this beam?

  • @gerryhartung736
    @gerryhartung736 3 года назад +1

    For custom home builders, you should have, a.reach forklift, or b. Rope, or . Forth man. Doesn't say much for company. I used to work as lead on three man crew, and we had a skytrak forklift and three framers besides myself, and I always carried rope.

  • @understructurerepair7132
    @understructurerepair7132 6 лет назад

    is there an absolute standard distance between floor trusses or are there all kinds of variables. I have to know the size of the band joists so as to put a 2" foam board on it for insulation.

  • @yfz350twin
    @yfz350twin 6 лет назад +2

    One of those trusses is missing a plate at the vertical web. LOL.

  • @appledapper
    @appledapper 3 года назад

    Must be a framed building in top. Only reason i can think of having a bc bearing floor truss on a cmu wall. That and the ribbon notches

  • @dbc1987dbc
    @dbc1987dbc 7 лет назад

    Looks Good!

  • @AdamWride
    @AdamWride 7 лет назад +1

    How long are those spans?

  • @zefrum3
    @zefrum3 2 года назад

    Interesting: a truss plate is missing in one of the verticals in the webbing @3:50

    • @addisonescapedevice
      @addisonescapedevice 2 года назад

      They do it to run HVAC ducting through it, they'll plan them out so they all are in a line

    • @zefrum3
      @zefrum3 2 года назад

      @@addisonescapedevice truss plates must be installed with a hydraulic press. I seriously doubt a plate is approved for field installation. This looks like a QC issue from the truss manufacturer.

  • @Andy-jr4ih
    @Andy-jr4ih 5 лет назад +1

    It’s no safety use the ladder on the last step

  • @gratefuldude941
    @gratefuldude941 6 лет назад

    Sounds like Ed Orgeron running the crew.

  • @ericortiz4140
    @ericortiz4140 6 лет назад +11

    This guys are too slow they need jose and pedro out there

    • @guillermocanizales1081
      @guillermocanizales1081 5 лет назад

      For real lol

    • @MyFortressConstruction
      @MyFortressConstruction 2 года назад +1

      @@guillermocanizales1081 Jose and Pedro started their own company and do 5 houses a day with their 6 cousins, nephews and brothers.

    • @migman2207
      @migman2207 Год назад

      @@MyFortressConstruction . hahaha that's so true. I had my house drywalled in a day and roofed in two days. John Smith told me he needs 2 months to do it

  • @ZubiDubi-g3c
    @ZubiDubi-g3c 8 месяцев назад

    From starting every web should be start from bottom chord instead top chord

  • @saintdiego89
    @saintdiego89 4 года назад

    Don’t throw drills in the dirt.... way to take care of the tools..

  • @billcoley8520
    @billcoley8520 5 лет назад +1

    I see a lot of hurt backs with this crew. Why not hire a crane?