Top work lads. The marigolds are a wicked idea. It can take weeks for the glue combined with the dust too get off of your skin. Lucky I’ve not of yet had any reactions.
Great video. I’ve got a 4sq metre area I plan to do soon. It’ll be sat on recently set concrete pad. Is there any sort of primer I need or will the correctly mixed resin set on it fine? Also, any idea what will happen to this stuff if I drill it? It’s basically going to be a patio which I want to install a pergola on!? Thanks
I cast the risers in big strips cut them to length and trim to size to fit the individual steps ,your way looks good but you are using a lot more trims and the only issue I can see with the back the backing board is water getting behind and possibly freezing which could cause problems .
Shouldn't the aggregate be washed before mixing with resin ? 2 extensions plugged into each other, not fully unwound is asking for a fire to start. Try mitering the corners on the metal perimeter trims as yours looks unprofessional.
You can tell you guys do a really good job with how fussy yous are with the prep and cleaning at the end. Keep it up lads
Appreciate that mate it’s all about the prep work! 🙌👍
Very clean and tidy. Excellent job.
Top video boys! Lovely work. Started doing resin driveways 3 months ago, and I've really got Into it 👍
Thanks mate 👍 it’s really enjoyable once you get into the swing of it!
Great idea with the risers.
Thanks Josh 👍
Top work lads. The marigolds are a wicked idea. It can take weeks for the glue combined with the dust too get off of your skin. Lucky I’ve not of yet had any reactions.
Great video. I’ve got a 4sq metre area I plan to do soon. It’ll be sat on recently set concrete pad. Is there any sort of primer I need or will the correctly mixed resin set on it fine? Also, any idea what will happen to this stuff if I drill it? It’s basically going to be a patio which I want to install a pergola on!? Thanks
Great video!!
What ratio of Aggregate to resin do you usually do?
Would this work for the fascia of a home? I would like that.
I cast the risers in big strips cut them to length and trim to size to fit the individual steps ,your way looks good but you are using a lot more trims and the only issue I can see with the back the backing board is water getting behind and possibly freezing which could cause problems .
Where I can buy this rasin bound
Cool 👍
Top job boys toom your time and did a lovley job
How much you charge per ft2* ?
Is this not resin bonded rather than resin bound?
Shouldn't the aggregate be washed before mixing with resin ? 2 extensions plugged into each other, not fully unwound is asking for a fire to start. Try mitering the corners on the metal perimeter trims as yours looks unprofessional.