The road stretch from Ramachandra hospital to Kumanchavadi needs widening. State highway is yet to start. No storm water drains are available on both sides. Even for slight drizzle the road gets water logged and is damaged
Fantastic. Good Camera and filming. No Jerk while filming and driving thro such risky muddy roads with several pot holes. I don't know which vehicle is driven while filming. Great and Awesome.
Nice coverage. You need to slow down on important junctions especially porur fly over you can cover both sides to cover current status. If possible try taking drone shots if feasible.
Yaepadi 2025 dec kulla porur to ponamalle complete aagum. Inum 50% work kuda mudila 😮😮 but Cmrl announced that 1st line will be porur to ponamalle will b ready by 2025 Nov. But seeing this . I think it will be completed only by 2026 dec
இப்ப CMRL சிங்கார சென்னை free prepaid card கொடுத்திட்டு இருகாங்க. இதுல 20 ரூபாயிலேர்ந்து 2000ரூபாய் வரை recharge செஞ்சிக்க முடியும். நீங்க கவுண்டர்ல போய் டிக்கெட் வாங்க வேண்டிய அவசியம் இல்ல. உள்ள போகும்போது wifi symbolல கார்டடை tap பண்ணிட்டு போக வேண்டியது தான். OUT ஆகும்போது, அதே மாதிரி wifi symbolல கார்டடை tap பண்ணும்போது, அது நீங்க travel செஞ்சதுக்கான amout இந்த card லேர்ந்து எடுத்துட்டு, கார்ட்ல balance amount எவ்வளவு இருக்குனு display ல காமிக்கும். Thanks.🙏😃
For More Videos Please Visit My channel City Breeze : ruclips.net/channel/UCy1x7zhtfBokf6r70qMMVdQ
The road stretch from Ramachandra hospital to Kumanchavadi needs widening. State highway is yet to start. No storm water drains are available on both sides. Even for slight drizzle the road gets water logged and is damaged
Fantastic. Good Camera and filming. No Jerk while filming and driving thro such risky muddy roads with several pot holes. I don't know which vehicle is driven while filming. Great and Awesome.
Thank you so much.🙏
Nice coverage. You need to slow down on important junctions especially porur fly over you can cover both sides to cover current status. If possible try taking drone shots if feasible.
Thanks for the tips!. 😃🙏
Yaepadi 2025 dec kulla porur to ponamalle complete aagum. Inum 50% work kuda mudila 😮😮 but Cmrl announced that 1st line will be porur to ponamalle will b ready by 2025 Nov. But seeing this . I think it will be completed only by 2026 dec
let's see 😃
Will panimalar college get a metro station in the future?
No idea. Will let you know lf any news about it
Awesome coverage and informative bro
Thank you. 🙏😃
Nice
Thanks. 😃🙏
ஐயா பின்னணி இசை கேட்பதற்கு தலைவலி அதிகமாக உள்ளது தயவுசெய்து மாற்றுங்கள்
மன்னிக்கவும். மாற்றிக்கொள்கிறேன். நன்றி 🙏
I am not sure how they're going to plan for parking ! Not only in this stretches, most of the stretches !
Good Point. Let's See. Thank You. 🙏😃
Multilevel parking is coming sir...@Chennaicity_zen
More than parking,feeder services to residential localities would be a better option. Would reduce traffic and emissions.
Bro porur to kodambakkam progress video edunga
ruclips.net/video/_Ul-3bBs9oM/видео.html
please check the link, Thanks.
Bro I saw this video. But I want a video of shaft construction in kodambakkam
Ok. will do it. Thanks.👍
Bro ticketing service la irukuma ila cmrl app la thaan book pandra maari irukuma bro
இப்ப CMRL சிங்கார சென்னை free prepaid card கொடுத்திட்டு இருகாங்க. இதுல 20 ரூபாயிலேர்ந்து 2000ரூபாய் வரை recharge செஞ்சிக்க முடியும். நீங்க கவுண்டர்ல போய் டிக்கெட் வாங்க வேண்டிய அவசியம் இல்ல. உள்ள போகும்போது wifi symbolல கார்டடை tap பண்ணிட்டு போக வேண்டியது தான். OUT ஆகும்போது, அதே மாதிரி wifi symbolல கார்டடை tap பண்ணும்போது, அது நீங்க travel செஞ்சதுக்கான amout இந்த card லேர்ந்து எடுத்துட்டு, கார்ட்ல balance amount எவ்வளவு இருக்குனு display ல காமிக்கும். Thanks.🙏😃
Return to native place and do farming
ok. i will do it. Thank you.
Dirty metro lines destroy our city