Great video, love to see behind the scenes of the fairs, you'll always see great trucks, driving skills, and engineering ...not to mention the sound of those engines. A great British tradition.
I have always wondered, how does each driver know where to set the ride down. It must be planned in advance, but you never see any of them looking at diagrams to work out where they need to set-up so as not to overlap another ride, and after all the big rides are set up, then a various amount of jubilee rides, stalls, and hot dog stands need to be moved into place???
The grounds are always set out in advance and a centre mark is put in place for each attraction somethimes if there is a new tenant the hole attraction maybe marked out for them
Great video, love to see behind the scenes of the fairs, you'll always see great trucks, driving skills, and engineering ...not to mention the sound of those engines.
A great British tradition.
I was lucky to work for Robinsons but bloody hell its hard graft.. 7 day wks and when open its 14 - 15 hour days
fantastic video, best build up i have seen for a long time.
A great video. I never knew how hard it was to set up a fair like this until now.
The ERF pulling two was great. These showmans drivers could teach professional HGV drivers a thing or two
I know it's old but wow! Ex carnie here in states ,been 35 years since I traveled.
I really love it
Nice to see a whole group of Danter's machines being built! :D
Great video Rob hopefully doing the same here very soon mate
Great Video
Question out of interest. When does Cheltenham go on again this year, or had it already happened?
que bonito juegos mecanicos megusta bre todos los juegos
😎👍💪🇻🇪
Nice looking carnival, to bad their isn't more video.
cool.
is that ex turners trucks by any chance????
Must be in England . Their carnival rides are alot different than the U.S. .
And better
I have always wondered, how does each driver know where to set the ride down. It must be planned in advance, but you never see any of them looking at diagrams to work out where they need to set-up so as not to overlap another ride, and after all the big rides are set up, then a various amount of jubilee rides, stalls, and hot dog stands need to be moved into place???
The grounds are always set out in advance and a centre mark is put in place for each attraction somethimes if there is a new tenant the hole attraction maybe marked out for them
Must measure the ground out an put marking down which can be block or paint marking
1:40 talk about over length :') Scrap that every load here was basically over length oh how I love showmen :D
if i was reversing this 13:00 id be all over the place LoL
Where is this fair ?
I'm sorry but you are going to have to move all of the rides about 10 feet to the left….
9.43! crack is illegal. lol
what country is this because I know this is not America?
America is a continent...not a country.
Its the same thing bro
And not a driving license between them.
well the loads came in on sunday at about 2.30 3.00 and the build up was on monday :-)