You are so right Inverters are the only way to go Bryan. Seems a different way of constructing the steps not surprised it appeared you found his explanation confusing. With the heat there one would think the roof would need plenty of venting. Getting ever closer mate. Bushyboy Oz.
I'm a US licensed electrical engineer and electrical inspector who now lives here in Khon Kaen. I'd be happy to come by and check your system if you'd like.
For example, you can use a "ufer" ground instead of ground rods for the earthing. I used this for my house. Result is lower resistance to earth. And, if you have subpanels downstream from the Main, be sure the neutral bar is NOT connected to the ground bar as that will cause current to flow in the ground wires. A simple check is to use a clamp-on Amp meter on any earthing connections. If it's not zero, there's a problem with the wiring.
Hi there Looking good , keen to see the type of battery used , are they like a car style battery for starting an engine or like an EV style, will see it fitted soon , Suk san wan songkran Regards Davy 🏴🇹🇭
The place is looking great. The electrical is confusing to me. You should have used a vibrator in that wall. There are some air bubbles. It looks like cottage cheese! 5555 (I think I'm funny)
Yep nothing gets passed me. I have to keep on top of everything here. But I've just seen one of there jobs and un supervision I don't recommend them if no proper management
You are so right Inverters are the only way to go Bryan. Seems a different way of constructing the steps not surprised it appeared you found his explanation confusing. With the heat there one would think the roof would need plenty of venting. Getting ever closer mate. Bushyboy Oz.
Cheers Ewen mate. The steps turned out brilliant I just made sure there was plenty of re enforcement in but we'll pleased with the outcome
Just remembering Kev-In-Thailand 4th anniversary - Sadly missed my old Enfield Neighbour
Not for the faint-hearted.
Congratulations Brian , another super job.
@ChupraCumbra yes he can. You can own bricks and motor but only lease the land upto 90 years. More than enough time I think
Cheers Ian mate much appreciate
I'm a US licensed electrical engineer and electrical inspector who now lives here in Khon Kaen. I'd be happy to come by and check your system if you'd like.
For example, you can use a "ufer" ground instead of ground rods for the earthing. I used this for my house. Result is lower resistance to earth.
And, if you have subpanels downstream from the Main, be sure the neutral bar is NOT connected to the ground bar as that will cause current to flow in the ground wires. A simple check is to use a clamp-on Amp meter on any earthing connections. If it's not zero, there's a problem with the wiring.
Hi there
Looking good , keen to see the type of battery used , are they like a car style battery for starting an engine or like an EV style, will see it fitted soon ,
Suk san wan songkran
Regards Davy 🏴🇹🇭
Will do a full speck video on the solar system soon we are using a 10kw lipo4 battery . Happy songkran buddy
The place is looking great. The electrical is confusing to me.
You should have used a vibrator in that wall. There are some air bubbles. It looks like cottage cheese! 5555 (I think I'm funny)
555 good one. Thanks Keith it's all come together now. Close to the finish line now
With all the things you rectify, you wonder what the other places they've done look like 😂, you're a patient bloke , suppose you have to be lol
Yep nothing gets passed me. I have to keep on top of everything here. But I've just seen one of there jobs and un supervision I don't recommend them if no proper management