Tablet & Staff works at the Embsay and Bolton Abbey railway

Поделиться
HTML-код
  • Опубликовано: 18 янв 2025

Комментарии • 7

  • @wideyxyz2271
    @wideyxyz2271 Год назад +2

    Fascinating stuff. Never get tired of seeing these operations.

  • @southyorkshireman
    @southyorkshireman Год назад +1

    Is there any chance of a video showing how a tablet is taken out and replaced on a no.6 machine? Also would be interesting to understand what turning the separate commutator actually does in the process.

  • @Jonno180556ADI
    @Jonno180556ADI Год назад +1

    Surely when the other signalman replaced the tablet he should have sent 3-5 which should have been acknowledged which would have returned the marker on the machine to “in”

    • @irseminorrailwayssection9491
      @irseminorrailwayssection9491  Год назад +1

      It was only done during a private visit, the other signaller ( human at the other end) was actually one of the team so apologies if things not quite aufait but yo7 know what us s & t are like 😅

    • @Jonno180556ADI
      @Jonno180556ADI Год назад +1

      @@irseminorrailwayssection9491 😂😂 It’s just that I use those a lot and noticed he had to ask for another single plunge to get the flag to be right. I know if you don’t get it right and get the flags at both ends correct it can make getting a tablet out for the next train fun!!😂😂