Это видео недоступно.
Сожалеем об этом.

5 Floor Steel Structure Prefab Office Building

Поделиться
HTML-код
  • Опубликовано: 6 июл 2020
  • The prefab office building is 3578.38 sqm in 5 floors, 42.9m long, 15.6m wide and 18.18m high. It is our company's new office building.
    Main feature for the steel structure office building system is prefabricated. Main construction, floor, decoration, envelope and utilities are all prefabricated in factory and fast installation on site.
    If you want to build a steel structure office building, pls feel free to contact us
    Ann
    M.P./ WhatsApp/Wechat: +86-15194307960
    E-mail: info@steelstructurescn.com
    Website: www.steelstruc...
    Pre-engineered Steel Building Solution Provider - Reger Steel Structure Company
    More than 20 years of experience, Reger has been focused on providing one-stop solutions including consulting, designing, manufacturing, and installation of pre-engineered steel buildings.
    √ Factory covers area of 150,000 sqm
    √ Supply ability 1500T/Month
    √ R&D teams contain 60+ senior engineers
    √ Exported to more than 100 Countries
    Main Market: Ethiopia, Algeria, Mauritius, Nigeria and Uruguay.
    Our main product including:
    ◆ Industrial workshop plant, factory building, and warehouse
    ◆ Commercial office building, exhibition room
    ◆ Agricultural poultry house
    More videos about our company and projects pls visit: / @chinasteelstructurewa...
    More steel structure projects we did pls visit:
    www.steelstruc...

Комментарии • 36

  • @karim4a7med
    @karim4a7med 2 месяца назад +4

    How many days it takes to get completed

  • @stephenhedman2161
    @stephenhedman2161 24 дня назад

    Pure genius. Stephen Hedman from B.C Canada.

  • @sureshpunekar7773
    @sureshpunekar7773 2 года назад +3

    Lovely steel buildings ❤️❤️

  • @lokesh303101
    @lokesh303101 Год назад +1

    This is much better.

  • @sandejzack
    @sandejzack Год назад

    I am shook!!!

  • @hevpjf
    @hevpjf 3 года назад

    WONDERFULL and sound isolation?

  • @unionssm
    @unionssm 2 года назад

    Nice!

  • @muhammadkashif2707
    @muhammadkashif2707 3 года назад +3

    Hello sir, I couldn't umderstand the walls material and drainage system, can you give me some info about that

  • @yousifhadeed9286
    @yousifhadeed9286 11 месяцев назад

    wow

  • @warriorking9509
    @warriorking9509 3 года назад +3

    what about wiring and water drainage system?

  • @jnsjashimuddin5579
    @jnsjashimuddin5579 Год назад

    Nice

  • @AdoniasV
    @AdoniasV 3 года назад +1

    Wow incredible!!! Your company sell only materials or includes installation?

    • @chinasteelstructurewarehou159
      @chinasteelstructurewarehou159  3 года назад +3

      Adonias Vasquez, thanks, we sell and also install, actually we supply one-stop service: including designing, manufacturing, and installation. If you want to know more about us, pls visit: www.steelstructurescn.com

  • @SatishKumar-op9uh
    @SatishKumar-op9uh 4 года назад +1

    Wonderful construction video

  • @qasimalibadi1302
    @qasimalibadi1302 3 года назад +1

    Good job, but how long it takes from design till the key door

  • @budgetpilgrim
    @budgetpilgrim 3 года назад

    Do you also provide materials and labor workers in other countries outside China?

  • @limraconstruction522
    @limraconstruction522 2 года назад

    Is types ki building kis rat's me ready ho jati h

  • @user-rs3zf3js9d
    @user-rs3zf3js9d 5 месяцев назад

    How to get one of this?

  • @idontwanttotellyoumyname.2244
    @idontwanttotellyoumyname.2244 3 года назад

    Can you share me details about construction cost?

  • @starrosetechnologies7232
    @starrosetechnologies7232 2 года назад

    I would like to talk to someone about building this structure for me, as shown.

  • @CryptoWHALE1701
    @CryptoWHALE1701 Год назад

    What’s the cost of this project?

  • @geekybasilempire6874
    @geekybasilempire6874 3 года назад

    mashallah this much fast

  • @Kaara8900
    @Kaara8900 3 года назад +1

    how long did it take to complete

    • @chinasteelstructurewarehou159
      @chinasteelstructurewarehou159  3 года назад +2

      kaara Gerge, Hello, main steel frame construction completed within 5 days.More detailed information about the office building pls visit: www.steelstructurescn.com/New-Prefab-Office-Building-of-Reger-Steel-Structure-Company-id3054672.html

    • @herbertant4096
      @herbertant4096 3 года назад

      @@chinasteelstructurewarehou159 is it safe? Kinda confusing

    • @hevpjf
      @hevpjf 3 года назад +1

      @@chinasteelstructurewarehou159 HOW MUCH DOES IT COST ?

  • @Nived8523
    @Nived8523 8 месяцев назад

    Cost

  • @aakrititimalsena433
    @aakrititimalsena433 3 года назад

    Price pls

  • @JuryReyes-hq5qm
    @JuryReyes-hq5qm 9 дней назад

    ,yhB.,