interax Automatic Swing Door Operator Installation
HTML-код
- Опубликовано: 17 окт 2024
- 0:12 - 0:30 All the parts and installation guide are taken out of the KA-200 box.
0:38 - 0:46 The pattern is separated from the installation guide with help of a knife.
0:48 - 0:56 The pattern is temporarily attached on the door..
0:56 - 1:00 … mechanism and sliding arm holes are drilled.
1:01 - 1:08 The claw of wall profile need to have the upright position.
1:13 - 1:19 A cable hole is drilled through wall profile.
1:20 - 1:45 The mechanism is hanged to wall profile and fixed with screws.
1:46 - 1:59 Sliding arm / lever arm is fixed.
2:00 - 2:12 The sliding arm profile installation is started.
2:13 - 2:26 First connection part is installed.
2:29 - 2:31 The stopper is placed.
2:32 - 2:37 Second connection part is installed.
2:38 - 3:00 The sliding arm installation to the door is completed.
3:01 - 3:07 Sensor installations are done.
3:07 - 3:11 Energy connection finished.
3:12 - 3:26 Program switch fixed.
3:27 - 3:45 For testing phase, setup button switched to ON position and the system is powered.
3:46 - 5:04 Testing phase (75 sec)
5:05 - 5:20 Setup button switched to OFF position and the system is now activated.
5:21 - 5:26 The cover plate of the mechanism is installed.
5:30 - 5:50 KA-200 is now ready to use.
Excellent