interax Automatic Swing Door Operator Installation

Поделиться
HTML-код
  • Опубликовано: 17 окт 2024
  • 0:12 - 0:30 All the parts and installation guide are taken out of the KA-200 box.
    0:38 - 0:46 The pattern is separated from the installation guide with help of a knife.
    0:48 - 0:56 The pattern is temporarily attached on the door..
    0:56 - 1:00 … mechanism and sliding arm holes are drilled.
    1:01 - 1:08 The claw of wall profile need to have the upright position.
    1:13 - 1:19 A cable hole is drilled through wall profile.
    1:20 - 1:45 The mechanism is hanged to wall profile and fixed with screws.
    1:46 - 1:59 Sliding arm / lever arm is fixed.
    2:00 - 2:12 The sliding arm profile installation is started.
    2:13 - 2:26 First connection part is installed.
    2:29 - 2:31 The stopper is placed.
    2:32 - 2:37 Second connection part is installed.
    2:38 - 3:00 The sliding arm installation to the door is completed.
    3:01 - 3:07 Sensor installations are done.
    3:07 - 3:11 Energy connection finished.
    3:12 - 3:26 Program switch fixed.
    3:27 - 3:45 For testing phase, setup button switched to ON position and the system is powered.
    3:46 - 5:04 Testing phase (75 sec)
    5:05 - 5:20 Setup button switched to OFF position and the system is now activated.
    5:21 - 5:26 The cover plate of the mechanism is installed.
    5:30 - 5:50 KA-200 is now ready to use.

Комментарии • 1