Hi sir I’m watching ur lecture from Maldives. Working as a supervisor and myself non civil background! I think you are the who can teach us out of many others!! Very nice explanation!!!! Keep continue and remember my request topics what I did earlier pls. Thanks & stay safe
Thank u very much. I am Proud of u sir for making such detailed video for rate analysis. but there are 100 to 150 items exist in building work (from excavation to finishing (hand over project) . pl. guide me how to make rate analysis work for all above items in building work.(to finalise work)
Exactly in a building we may have 100+ items. We have to do rate analysis in the same way. But in video i can't include all the items, i am only giving idea of doing rate analysis of any particular work.
Sir Good Video but please Add 1) Equipment Charges (Lifts + Mixture machine) 2) Vibrator Charges 3) Transport Charges for Material Like Agge etc... 4) Admixture For Concrete 5) Tax 7.5%
Good video. Pls share the same for Footings , columns, plinth beam, slab. Steel quantity in slab with beam. Mortar required with beam for 10x10 mts slab.
Thankyou so much. I had already uploaded many videos related to Estimation and Rate Analysis. Yes i do have only one video on BOQ, i will try to keep uploading more videos on above topics.
Do visit my channel ..i have 6-7 videos on BBS of Slab, Beam, Column and Many more. Here is the link of video on Bar Bending Schedule of Beam. ruclips.net/video/G6u0x4Y3e4A/видео.html
It's good that you worked really hard but sir, want to suggest you that whoever's is watching this video must be a technical person or this thing after being taught will be implemented by engineers and they are efficient in arithmetic I guess, so video must b abbreviated to save the times.... just try tomak the videos short and gisted....
I understand your point Udayan Ji, Technical persons get the concept easily but think about the student who coming here to understand the whole concept. And if I try keep my videos short then I have to clear many doubt’s through comments. So just to avoid all those things, videos are little long .
Sir last last semester me questions aaya tha- rate analysis for slab nd ratio tha 1:1.5:3 nd likha tha take the fair market rate so sir kya us question ko same issi method se kr skte plzz reply krna sirr
No other video on You Tube hv complete information.Thanks for this video
Thanks for appreciation and keep supporting
Bhoot badhiya sir
Sab dout calear ker diye Aap is video me
It's amazing video for every civil engineer
You sir here saving lives of students
It was very nice I gat clarity about rate analysis totally thank you sir
👍🏻👍🏻👍🏻
Hi sir
I’m watching ur lecture from Maldives. Working as a supervisor and myself non civil background! I think you are the who can teach us out of many others!! Very nice explanation!!!!
Keep continue and remember my request topics what I did earlier pls.
Thanks & stay safe
Supervisor ke saalery kya hai uder
Hiii bro
Is there any vacancies in Maldives I'm also willing to work there please bro can you send me your mobile number please
You are great Sir
Superb Teaching Method Sir🙏
Keep supporting
I always hv pblm in diz....thanks fr video....I'm giving my oll exams due to detailed video...
Thanks.👍🏻
Very well and understanding video👍👍👌👌👌👌
Thanks for appreciation ...keep supporting this channel. 👍🏻
great one
Nice explation sir Ji plz next video ☺️ of Rate Analysis
I had already 4-5 videos on Rate Analysis on my channel. U can check my playlist. I hope u will found more such videos.👍🏻
Fantastic Video
Good work my friend
Its very simple explanation ever
Thankyou very much , excellent approach ❤
Means a lot
Thank you so much for your teaching!
Keep supporting Brother
Love you sir ❤️🙏🙏🙏🙏🙏🙏🙏😘😘😘 your are my champ 🏆
thank you so much sir .........
bohot assan tarike se aapne samjhaya ......
hohot help hua .....thank you
Thanks for appreciation 🙏🏻..keep sharing videos with ur frnds.👍🏻
Thank u so much sir ..detailed helpful video
Keep supporting and sharing my videos👍🏻
Excellent teaching sir.....
Thank you for the video and keep up the good work
Best video sir...👍👍🙏🙏
Keep supporting
Thank u very much. I am Proud of u sir for making such detailed video for rate analysis. but there are 100 to 150 items exist in building work (from excavation to finishing (hand over project) . pl. guide me how to make rate analysis work for all above items in building work.(to finalise work)
Exactly in a building we may have 100+ items. We have to do rate analysis in the same way. But in video i can't include all the items, i am only giving idea of doing rate analysis of any particular work.
bhai pata chala ????????
Thank you so much 😊👍✌️
Keep supporting our channel
Thnku so much for making this viedo ..
Always welcome ...keep supporting and sharing my videos
Thankyou so much sir . It was valuable .
Thanks for appreciation ...keep supporting this channel 👍🏻
MashAllah❤ 🎉great sir
Thank you for this vedio making
Keep supporting and sharing videos with ur friends.👍🏻
Thank you so much for making this video on request 🙂
Always welcome ...keep supporting and sharing videos with ur friends. 👍🏻
Excellent sir 😊😊😊
🙏🏻👍🏻
Where is machinery expanse@@CivilConstruction
This is amazing
Nice way to teaching 🙏🙏keep continuing please
Thanks for appreciation Bro
Thanks!! 👍👌
Sir Good Video
but
please Add
1) Equipment Charges (Lifts + Mixture machine)
2) Vibrator Charges
3) Transport Charges for Material Like Agge etc...
4) Admixture For Concrete
5) Tax 7.5%
Thank you very much 🙏
Keep supporting us.
Well teacher
Keep supporting this channel and do share videos with your friends.
Heartly thank u sir 👍🙏🙏
Our pride ...❤️❤️❤️❤️
Thank you so much
🥰🥰🥰🥰🥰
❤
Superb....😍
Thanks for appreciation
Nice
Very fine. Sir, i want more labour reqd per cu.m
Sir ek video banaye jisme slab k sath internal and surrounding beams b cover ho
Thank you so mich
Please make more videos ☺️☺️
Sure right now busy with other projects ..i will keep uploading videos
If you will make i am surly pass otherwise Don't know how to pass this sem ❤️❤️
Good video. Pls share the same for Footings , columns, plinth beam, slab. Steel quantity in slab with beam. Mortar required with beam for 10x10 mts slab.
👍🏻👍🏻👍🏻
Hi sir
I did subscribe & become ur fan of topics and I requested to make a series of boq, estimate, labour cost in a individual playlist pls..
thanks
Thankyou so much. I had already uploaded many videos related to Estimation and Rate Analysis. Yes i do have only one video on BOQ, i will try to keep uploading more videos on above topics.
Can you please share a link for labour schedule hand book for easy of understanding and calculating for other works too
how do you get rates for all (material and labours)
U can refer PWD schedule of rates of your state or CPWD or if u r a student then it would be given to you in the numerical
Sir , ek question binding wire to leli lekin stirrups b to lena hoga .?
Sir please tell me, how do i know the no. of mason , labour,etc required for different works,,, please make a video on that
Okay
Sir can you make a video on, how to use SOR, it will be a great help ☺️
Soon i will make a video on this topic
@@CivilConstruction thank u sir ❤️❤️
Please make a vedio of rate analysis with reference of DAR of foundation excavation upto plinth level
Sir please do video on Bar bending schedule in detailed
Do visit my channel ..i have 6-7 videos on BBS of Slab, Beam, Column and Many more. Here is the link of video on Bar Bending Schedule of Beam. ruclips.net/video/G6u0x4Y3e4A/видео.html
Thank you sir
Sir if there’s beam also then how to calculate??
1 bag cement volume is 0.035 . Divide with volume of cement u will get numbers of bags .
👍
Hi sir
Could you make video based of labour productivity in construction but don’t include female pls?
Thanks
Sr Lebour ki QNTY jo apni li h vo kis is code se li h
Please similarly keep for brick work and column
Pls solve a problem of excavation with the help of DRS AND DAR and the Diffrecmce between IS CODE AND DAR
12mm thikness ka cement concrete flooring hota hai sir
How to remember labours quantity for all types of rate analysis
Sir jo apki playlist m estimation ke videos h isme full estimation h kya step by step
Please reply
Yeah watch this video
ruclips.net/video/pdT8v69SglY/видео.html
PLEASE MAKE VIDIO ON POROCITY MEASUREMENT OF RCC
Machinery cost aur uska std out put hoga sir apke pass??
Please make a rate analysis vedio of foundation excavation plinth level
Sir quantity of labour for plastering
If thickness of slab is not given then what to do
how to take rates sir.will they mention in question paper in exam.or approximately we have to take.
They will mention Rates in question paper.
sir estimating and costing ke lectures or upload karo n 5th sem civil poly 🙏
Sur.👍🏻
box culvert shuttering calculation nikalana batue sir
Sir Kon sac cod use kia apne
Pls share waterproofing anyalsis
I will make a separate video on this topic 👍🏻
It's good that you worked really hard but sir, want to suggest you that whoever's is watching this video must be a technical person or this thing after being taught will be implemented by engineers and they are efficient in arithmetic I guess, so video must b abbreviated to save the times.... just try tomak the videos short and gisted....
I understand your point Udayan Ji, Technical persons get the concept easily but think about the student who coming here to understand the whole concept. And if I try keep my videos short then I have to clear many doubt’s through comments. So just to avoid all those things, videos are little long .
Sir, how we can collect latest labor rate ..?
Shuttering ki quantity nikal li uske bad plates bhi mangani PDEGI vo sq.meter k mutabik kese buy kre
Sir how do we decide, the labours and works ? For a rcc work or any other work ?
For labour its mentioned in schedule how much labour required to do a specific quantity of work
@@CivilConstruction Which Schedule, pls share link for refrence.
Pl.give the rates of building construction work.also give the thumb rule of steel requirement in R.c.c work
Sir Rate Analysis mein labours ke factors Kahan se liye
If there any kind of machinery charges is included or not ? Kindly reply 👏🏼
Sir last last semester me questions aaya tha- rate analysis for slab nd ratio tha 1:1.5:3 nd likha tha take the fair market rate so sir kya us question ko same issi method se kr skte plzz reply krna sirr
Yeah but you can get your city rates from your state PWD schedule of rate. And rest the method is same.
Sir do u know syllabus of 12th for gce ...if u have vedios on that pls share link
Bhai jan gol tank ka brick work or plaster kasy nikalty ha
Hi sir labour schedule ke link share kare plz
Plz tell me from where we can obtain the quantity of labor ??
What is the "schedule document" you have used to determine number of labors for RCC work? Can you please share the link or reference? Thank you!
Estimate of Rb slab sir
Sir in this video you are not add cost of lift machine & bar bending machine,bar cutting machine.
Sir what about bulking of sand?
Yeah ...due to all these factors we take dry volume more as compared to Wet Volume
Shutter rate of beam how calculate
Where can we get labour schedule for each work?
Sir ground floor,1st floor,2nd floor sab ka rate alag alag hoga to Kaise niklae
Haan usme material cost same rahega but labour cost change hoga
@@CivilConstruction ohi to chahiye ki labour cost analysis kaise kare baaki floor kaa . Bataiye
Dusrey floors ka bhi same way main karna hai but labour used will be higher that will be given in labour schedule of PWD and CPWD
Hi sir,
Rate is not given in problem. How to take Rate for material and Laboure.
In exam it would be given if u r a student and if u r working then u have to follow CPWD or ur states PWD schedule of rates for that
Sir no. of labour kaise find karen
Machines and equipments?
sir schedule of labor kaha se lena hai
Sir bishti value can not find
Govt cost entha slab square yard
Hello, why haven't you added wastage in any of the videos for rate analysis??
what is the meaning of beldar in english