Rate Analysis of RCC Work. Estimation and Costing of RCC Slab/Work

Поделиться
HTML-код
  • Опубликовано: 1 дек 2024

Комментарии • 194

  • @saifcivil5921
    @saifcivil5921 3 года назад +3

    Bhoot badhiya sir
    Sab dout calear ker diye Aap is video me

  • @navitdutt7909
    @navitdutt7909 3 года назад +2

    No other video on You Tube hv complete information.Thanks for this video

  • @ibrahimansari9966
    @ibrahimansari9966 2 года назад +4

    It's amazing video for every civil engineer

  • @manabdas7876
    @manabdas7876 10 месяцев назад +1

    You sir here saving lives of students

  • @ashrafulalam7042
    @ashrafulalam7042 2 года назад +6

    Hi sir
    I’m watching ur lecture from Maldives. Working as a supervisor and myself non civil background! I think you are the who can teach us out of many others!! Very nice explanation!!!!
    Keep continue and remember my request topics what I did earlier pls.
    Thanks & stay safe

    • @eraamir7774
      @eraamir7774 2 года назад

      Supervisor ke saalery kya hai uder

    • @lokeshmb6467
      @lokeshmb6467 4 месяца назад

      Hiii bro
      Is there any vacancies in Maldives I'm also willing to work there please bro can you send me your mobile number please

  • @alekhyab2119
    @alekhyab2119 3 года назад +3

    It was very nice I gat clarity about rate analysis totally thank you sir

  • @Tohidkhan4465
    @Tohidkhan4465 Год назад +2

    Nice explation sir Ji plz next video ☺️ of Rate Analysis

    • @CivilConstruction
      @CivilConstruction  Год назад +1

      I had already 4-5 videos on Rate Analysis on my channel. U can check my playlist. I hope u will found more such videos.👍🏻

  • @AmitKumar-tg5zj
    @AmitKumar-tg5zj 3 года назад +3

    You are great Sir
    Superb Teaching Method Sir🙏

  • @harshadvishwakarma3241
    @harshadvishwakarma3241 2 года назад +2

    Very well and understanding video👍👍👌👌👌👌

    • @CivilConstruction
      @CivilConstruction  2 года назад

      Thanks for appreciation ...keep supporting this channel. 👍🏻

  • @balvindersingh3975
    @balvindersingh3975 2 месяца назад

    Good work my friend
    Its very simple explanation ever

  • @parthasarathidas7420
    @parthasarathidas7420 3 года назад +1

    thank you so much sir .........
    bohot assan tarike se aapne samjhaya ......
    hohot help hua .....thank you

    • @CivilConstruction
      @CivilConstruction  3 года назад +1

      Thanks for appreciation 🙏🏻..keep sharing videos with ur frnds.👍🏻

  • @roshnibarnala5494
    @roshnibarnala5494 3 года назад +2

    I always hv pblm in diz....thanks fr video....I'm giving my oll exams due to detailed video...

  • @sameerkaiwartya3962
    @sameerkaiwartya3962 9 месяцев назад +1

    Thankyou very much , excellent approach ❤

  • @shitalkothule5765
    @shitalkothule5765 Год назад +1

    Thank u so much sir ..detailed helpful video

  • @AnkitGupta-fo4oo
    @AnkitGupta-fo4oo 2 года назад +1

    great one

  • @sanjaykale2002
    @sanjaykale2002 3 года назад +11

    Thank u very much. I am Proud of u sir for making such detailed video for rate analysis. but there are 100 to 150 items exist in building work (from excavation to finishing (hand over project) . pl. guide me how to make rate analysis work for all above items in building work.(to finalise work)

    • @CivilConstruction
      @CivilConstruction  3 года назад +5

      Exactly in a building we may have 100+ items. We have to do rate analysis in the same way. But in video i can't include all the items, i am only giving idea of doing rate analysis of any particular work.

    • @asifmaqsood4660
      @asifmaqsood4660 2 года назад

      bhai pata chala ????????

  • @rohitborkarRB
    @rohitborkarRB 2 года назад +1

    Fantastic Video

  • @jaychihla10
    @jaychihla10 3 года назад +3

    Thank you so much for your teaching!

  • @satheeshkumar6609
    @satheeshkumar6609 3 года назад +1

    Thank you for the video and keep up the good work

  • @-COmPrakashYadav
    @-COmPrakashYadav 3 года назад +1

    Best video sir...👍👍🙏🙏

  • @yashok9950
    @yashok9950 3 года назад +1

    Excellent teaching sir.....

  • @PritiKumari-yo3zt
    @PritiKumari-yo3zt 3 года назад +1

    Thnku so much for making this viedo ..

    • @CivilConstruction
      @CivilConstruction  3 года назад

      Always welcome ...keep supporting and sharing my videos

  • @sahilsidd2457
    @sahilsidd2457 Год назад +1

  • @SumitYadav-id4tl
    @SumitYadav-id4tl 7 месяцев назад +1

    Excellent sir 😊😊😊

  • @sayyedzahir5338
    @sayyedzahir5338 2 года назад +3

    Sir Good Video
    but
    please Add
    1) Equipment Charges (Lifts + Mixture machine)
    2) Vibrator Charges
    3) Transport Charges for Material Like Agge etc...
    4) Admixture For Concrete
    5) Tax 7.5%

  • @a.j5521
    @a.j5521 3 года назад +2

    Thank you so much for making this video on request 🙂

    • @CivilConstruction
      @CivilConstruction  3 года назад +1

      Always welcome ...keep supporting and sharing videos with ur friends. 👍🏻

  • @Nakshatra_02
    @Nakshatra_02 3 года назад +3

    Thank you so much 😊👍✌️

  • @rohangupta399
    @rohangupta399 3 года назад +1

    Thankyou so much sir . It was valuable .

    • @CivilConstruction
      @CivilConstruction  3 года назад +1

      Thanks for appreciation ...keep supporting this channel 👍🏻

  • @IjazAhmad-sn6iv
    @IjazAhmad-sn6iv Год назад

    MashAllah❤ 🎉great sir

  • @pravinshewale2267
    @pravinshewale2267 3 года назад +1

    Thank you for this vedio making

    • @CivilConstruction
      @CivilConstruction  3 года назад

      Keep supporting and sharing videos with ur friends.👍🏻

  • @PrakashKumarLalDas
    @PrakashKumarLalDas 3 года назад +3

    Nice way to teaching 🙏🙏keep continuing please

  • @munishsharma9655
    @munishsharma9655 2 года назад +1

    Thanks!! 👍👌

  • @mr.unboxer794
    @mr.unboxer794 3 года назад +1

    This is amazing

  • @pargati..1133
    @pargati..1133 2 года назад +1

    Thank you very much 🙏

  • @taranjeetsingh3295
    @taranjeetsingh3295 3 года назад +1

    Sir ek video banaye jisme slab k sath internal and surrounding beams b cover ho

  • @civilengineerkhokan2521
    @civilengineerkhokan2521 2 года назад

    Nice

  • @techkanglie1724
    @techkanglie1724 3 года назад +1

    Well teacher

    • @CivilConstruction
      @CivilConstruction  3 года назад

      Keep supporting this channel and do share videos with your friends.

  • @abhipan
    @abhipan 3 года назад

    Heartly thank u sir 👍🙏🙏

  • @silentknight6962
    @silentknight6962 3 года назад +1

    Our pride ...❤️❤️❤️❤️

  • @vikeshtalda1069
    @vikeshtalda1069 3 года назад +5

    Sir can you make a video on, how to use SOR, it will be a great help ☺️

  • @sriram_nani
    @sriram_nani 3 года назад

    Superb....😍

  • @sibendranathkhataniar1815
    @sibendranathkhataniar1815 2 года назад +1

    Very fine. Sir, i want more labour reqd per cu.m

  • @srinivasappala9163
    @srinivasappala9163 2 года назад +1

    Good video. Pls share the same for Footings , columns, plinth beam, slab. Steel quantity in slab with beam. Mortar required with beam for 10x10 mts slab.

  • @biggbossupdates7
    @biggbossupdates7 3 года назад +3

    Sir please do video on Bar bending schedule in detailed

    • @CivilConstruction
      @CivilConstruction  3 года назад +1

      Do visit my channel ..i have 6-7 videos on BBS of Slab, Beam, Column and Many more. Here is the link of video on Bar Bending Schedule of Beam. ruclips.net/video/G6u0x4Y3e4A/видео.html

    • @biggbossupdates7
      @biggbossupdates7 3 года назад

      Thank you sir

  • @yellowflash1825
    @yellowflash1825 2 года назад +1

    Sir please tell me, how do i know the no. of mason , labour,etc required for different works,,, please make a video on that

  • @bedbyaspokhrel
    @bedbyaspokhrel 3 года назад +1

    Please make more videos ☺️☺️

    • @CivilConstruction
      @CivilConstruction  3 года назад

      Sure right now busy with other projects ..i will keep uploading videos

    • @bedbyaspokhrel
      @bedbyaspokhrel 3 года назад +1

      If you will make i am surly pass otherwise Don't know how to pass this sem ❤️❤️

  • @mudassirjamal8854
    @mudassirjamal8854 3 года назад +1

    Please make a vedio of rate analysis with reference of DAR of foundation excavation upto plinth level

  • @rajathsrvt
    @rajathsrvt 2 месяца назад

    Can you please share a link for labour schedule hand book for easy of understanding and calculating for other works too

  • @uvira6747
    @uvira6747 2 года назад +2

    how do you get rates for all (material and labours)

    • @CivilConstruction
      @CivilConstruction  2 года назад +1

      U can refer PWD schedule of rates of your state or CPWD or if u r a student then it would be given to you in the numerical

  • @saifcivil5921
    @saifcivil5921 3 года назад

    Thank you so mich

  • @TusharJanbandhu
    @TusharJanbandhu 2 года назад +1

    sir estimating and costing ke lectures or upload karo n 5th sem civil poly 🙏

  • @PranayHawaldar
    @PranayHawaldar 2 года назад +1

    👍

  • @ashrafulalam7042
    @ashrafulalam7042 2 года назад +1

    Hi sir
    Could you make video based of labour productivity in construction but don’t include female pls?
    Thanks

  • @mudassirjamal8854
    @mudassirjamal8854 3 года назад +1

    Pls solve a problem of excavation with the help of DRS AND DAR and the Diffrecmce between IS CODE AND DAR

  • @ashrafulalam7042
    @ashrafulalam7042 2 года назад +1

    Hi sir
    I did subscribe & become ur fan of topics and I requested to make a series of boq, estimate, labour cost in a individual playlist pls..
    thanks

    • @CivilConstruction
      @CivilConstruction  2 года назад +1

      Thankyou so much. I had already uploaded many videos related to Estimation and Rate Analysis. Yes i do have only one video on BOQ, i will try to keep uploading more videos on above topics.

  • @akhilesh117
    @akhilesh117 3 года назад +2

    Sir , ek question binding wire to leli lekin stirrups b to lena hoga .?

  • @saiteja9987
    @saiteja9987 3 года назад +1

    how to take rates sir.will they mention in question paper in exam.or approximately we have to take.

  • @udayansingh6470
    @udayansingh6470 Год назад +1

    It's good that you worked really hard but sir, want to suggest you that whoever's is watching this video must be a technical person or this thing after being taught will be implemented by engineers and they are efficient in arithmetic I guess, so video must b abbreviated to save the times.... just try tomak the videos short and gisted....

    • @CivilConstruction
      @CivilConstruction  Год назад

      I understand your point Udayan Ji, Technical persons get the concept easily but think about the student who coming here to understand the whole concept. And if I try keep my videos short then I have to clear many doubt’s through comments. So just to avoid all those things, videos are little long .

  • @dangerous536
    @dangerous536 2 года назад +1

    Sir jo apki playlist m estimation ke videos h isme full estimation h kya step by step
    Please reply

    • @CivilConstruction
      @CivilConstruction  2 года назад

      Yeah watch this video
      ruclips.net/video/pdT8v69SglY/видео.html

  • @mudassirjamal8854
    @mudassirjamal8854 3 года назад

    Please make a rate analysis vedio of foundation excavation plinth level

  • @l.00.l75
    @l.00.l75 Месяц назад

    Machinery cost aur uska std out put hoga sir apke pass??

  • @henishsanghani8989
    @henishsanghani8989 Год назад

    1 bag cement volume is 0.035 . Divide with volume of cement u will get numbers of bags .

  • @suhassane4903
    @suhassane4903 2 года назад

    PLEASE MAKE VIDIO ON POROCITY MEASUREMENT OF RCC

  • @ramakantsingh7737
    @ramakantsingh7737 9 месяцев назад

    box culvert shuttering calculation nikalana batue sir

  • @maneeharajper9582
    @maneeharajper9582 3 года назад +1

    Sir if there’s beam also then how to calculate??

  • @sibendranathkhataniar1815
    @sibendranathkhataniar1815 2 года назад

    Pl.give the rates of building construction work.also give the thumb rule of steel requirement in R.c.c work

  • @vikeshtalda1069
    @vikeshtalda1069 3 года назад +2

    Sir how do we decide, the labours and works ? For a rcc work or any other work ?

    • @CivilConstruction
      @CivilConstruction  3 года назад

      For labour its mentioned in schedule how much labour required to do a specific quantity of work

    • @AshishDixit0785
      @AshishDixit0785 2 года назад

      @@CivilConstruction Which Schedule, pls share link for refrence.

  • @sunnydogra7214
    @sunnydogra7214 22 дня назад

    Sir Rate Analysis mein labours ke factors Kahan se liye

  • @vikaskharvar4939
    @vikaskharvar4939 3 года назад +1

    12mm thikness ka cement concrete flooring hota hai sir

  • @akhilgeorge1804
    @akhilgeorge1804 3 года назад +1

    If there any kind of machinery charges is included or not ? Kindly reply 👏🏼

  • @aaryantyagi108
    @aaryantyagi108 Год назад +1

    Sir last last semester me questions aaya tha- rate analysis for slab nd ratio tha 1:1.5:3 nd likha tha take the fair market rate so sir kya us question ko same issi method se kr skte plzz reply krna sirr

    • @CivilConstruction
      @CivilConstruction  Год назад

      Yeah but you can get your city rates from your state PWD schedule of rate. And rest the method is same.

  • @Waseemyounus15
    @Waseemyounus15 3 года назад

    Please similarly keep for brick work and column

  • @chetangombi.4148
    @chetangombi.4148 2 года назад

    How to remember labours quantity for all types of rate analysis

  • @praveenaithal8081
    @praveenaithal8081 Год назад +1

    Pls share waterproofing anyalsis

  • @jignesh2657
    @jignesh2657 Год назад

    Shuttering ki quantity nikal li uske bad plates bhi mangani PDEGI vo sq.meter k mutabik kese buy kre

  • @BharatChordiya-e8p
    @BharatChordiya-e8p Год назад

    What is the "schedule document" you have used to determine number of labors for RCC work? Can you please share the link or reference? Thank you!

  • @ajaynamdev9615
    @ajaynamdev9615 Год назад

    Sr Lebour ki QNTY jo apni li h vo kis is code se li h

  • @mohammadabdulrahman7077
    @mohammadabdulrahman7077 2 года назад +1

    Hi sir labour schedule ke link share kare plz

  • @er.harshalsanap8035
    @er.harshalsanap8035 2 года назад

    Sir in this video you are not add cost of lift machine & bar bending machine,bar cutting machine.

  • @minalrane2308
    @minalrane2308 Год назад

    Sir do u know syllabus of 12th for gce ...if u have vedios on that pls share link

  • @AllinOne-jc4vo
    @AllinOne-jc4vo 11 месяцев назад

    Sir, how we can collect latest labor rate ..?

  • @namanbinjhwar7696
    @namanbinjhwar7696 Год назад

    1मिस्त्री 1 मेन मजदूर 1 ओमेन मजदूर तीनो मिलकर
    एक दिन मे कितना ढलाई का काम करते है।
    बताने कि कृपा करे

  • @ajendrasingh7803
    @ajendrasingh7803 Год назад

    Sir quantity of labour for plastering

  • @abhisheknegi5026
    @abhisheknegi5026 Год назад

    If available plz send it in pdf format

  • @emmanuelraju6234
    @emmanuelraju6234 3 года назад +1

    Sir what about bulking of sand?

    • @CivilConstruction
      @CivilConstruction  3 года назад

      Yeah ...due to all these factors we take dry volume more as compared to Wet Volume

  • @zurichzurich1735
    @zurichzurich1735 2 года назад

    Plz tell me from where we can obtain the quantity of labor ??

  • @AliRaza-bh1xe
    @AliRaza-bh1xe 2 года назад

    Bhai jan gol tank ka brick work or plaster kasy nikalty ha

  • @medhatupsakhare213
    @medhatupsakhare213 2 года назад

    Hello, why haven't you added wastage in any of the videos for rate analysis??

  • @nehalmansuri6009
    @nehalmansuri6009 2 года назад +1

    Sir ground floor,1st floor,2nd floor sab ka rate alag alag hoga to Kaise niklae

    • @CivilConstruction
      @CivilConstruction  2 года назад

      Haan usme material cost same rahega but labour cost change hoga

    • @nehalmansuri6009
      @nehalmansuri6009 2 года назад +1

      @@CivilConstruction ohi to chahiye ki labour cost analysis kaise kare baaki floor kaa . Bataiye

    • @CivilConstruction
      @CivilConstruction  2 года назад

      Dusrey floors ka bhi same way main karna hai but labour used will be higher that will be given in labour schedule of PWD and CPWD

  • @solecer539
    @solecer539 3 года назад

    Sir Kon sac cod use kia apne

  • @nenavathramesh4749
    @nenavathramesh4749 Год назад

    Hi sir,
    Rate is not given in problem. How to take Rate for material and Laboure.

    • @CivilConstruction
      @CivilConstruction  Год назад

      In exam it would be given if u r a student and if u r working then u have to follow CPWD or ur states PWD schedule of rates for that

  • @sobbevideo992
    @sobbevideo992 2 года назад

    Where can we get labour schedule for each work?

  • @rainbow9649
    @rainbow9649 2 года назад

    Good evening sir
    How much of labour required to remove cement sand plaster from 100 sq.ft wall
    Manually and by using mechanical chisel
    Plz reply sir its urgent

  • @sachinplateform7385
    @sachinplateform7385 3 года назад +1

    I am civil engineering freshere

  • @Realcartoon1
    @Realcartoon1 3 года назад +2

    Sir hamare exam ane wwale hai kuch din me jldi se Quantity surveying me paas hone layak syllabus krra de plz

    • @CivilConstruction
      @CivilConstruction  3 года назад +1

      I have many videos related to this on my channel ..check out all my videos on my You Tube Channel and thereafter u need any video ..do ask me the topic ..i will make a video on that

  • @rajeshtaneja1689
    @rajeshtaneja1689 3 года назад

    sir schedule of labor kaha se lena hai

  • @jignesh2657
    @jignesh2657 Год назад

    Slab ka steel kg mai nikal liya lekin slab mai ek hi mm k bar ho ye to ho nhi skta to total hmara Wight aaya uske mutabik ALG ALG mm k bar kese kharide slab k liye

  • @kashifkhan-yy9um
    @kashifkhan-yy9um 2 года назад

    Estimate of Rb slab sir

  • @gamingchannel-cx6sr
    @gamingchannel-cx6sr 6 месяцев назад

    Sir no. of labour kaise find karen

  • @lifegoeson81122
    @lifegoeson81122 2 года назад +1

    Labour schedule kaha se dekhe

    • @CivilConstruction
      @CivilConstruction  2 года назад

      If are a student then it will be given in exam otherwise Labour Ka schedule bana hota hai CPWD ya PWD department ka ..u can refer that also