MBUDZI INTERCHANGE JANUARY UPDATE. BRIDGES 1,2 AND 3. HARARE ZIMBABWE

Поделиться
HTML-код
  • Опубликовано: 20 янв 2023

Комментарии • 86

  • @gracemarunya9113
    @gracemarunya9113 Год назад +10

    Zimbabwe has the best engineers I trust their work..I have my uncle who is an engineer based in SA is was invited to be part of this team ..this is impressive..👌

  • @jujun6465
    @jujun6465 Год назад +16

    Thanks CCC, your ideas are now being used. I remember some people saying negative comments about your plans about spaghetti roads etc. bravo to the young man.

  • @daughterofzion7634
    @daughterofzion7634 Год назад +6

    Vanotivenga tivengei hedu isu tichingovaka nyika yedu, brick by brick, in ED’ s voice and accent hanku.
    Weldone and thanks 4 the update my Blessed sisi❤

  • @majestic4124
    @majestic4124 Год назад +4

    Zvinodadisa izvi pasi newe vandalism, thank you for the update 👏👏

  • @MrAllumelg
    @MrAllumelg Год назад +6

    Drone footage can give more clarity. But great work thus far. Not sure if this progress will meet the 18months target though. Lets keep moving. 👏👏

  • @daughterofzion7634
    @daughterofzion7634 Год назад +5

    Vision 2030 tirikuzviona hamungotauri akuru asi you walk the talk, zvichandituma kuti ndijoine kuti 2030 Menge muchiripo😂😂ini i am just forced ooooh. Zvakanaka zvaitwa ini hanku chipo changu kurumbidza irrespective of whatever. Move Dzimbadzemabwe move. Restoration in motion. It shall be well with you my beloved country. The kauntiri of milk and honey😂 in Malema’s voice and accent.

  • @playgirl7305
    @playgirl7305 Год назад +14

    Under bridge 2 you could put hydro electric generators in those river rapids and light up the whole complex and feeding roads. For kilometres before drivers arrive at the interchange.

    • @samn6842
      @samn6842 Год назад

      True just a small generator will do the job

    • @samn6842
      @samn6842 Год назад

      True just a small generator will do the job

    • @Thatguywoya747
      @Thatguywoya747 Год назад

      This is a good idea but there is need to invest more in security of those generator if ever they get to be put otherwise thevies will party.

    • @playgirl7305
      @playgirl7305 Год назад +1

      @@Thatguywoya747 you are right, and some silly thieves will probably only just try to cut the electricity copper lines, in order to sell the copper on the black market. But with a high electric voltage in the lines, and on top of that standing in water , it is not a good idea. All participants in the water would go meet and greet their Vadzimu /Ancestors instantly.

    • @Thatguywoya747
      @Thatguywoya747 Год назад

      @@playgirl7305 Government has to look into security

  • @tarisaimhikurochapanduka
    @tarisaimhikurochapanduka Год назад +1

    Great works there we have the best engineers in Zimbabwe I believe in you guyz

  • @palmindigo1995
    @palmindigo1995 Год назад +9

    Zvinhu zvacho zvisati zvapera zvakutoita kunge zvedara or like they r repairing.

  • @rutendomarufu2929
    @rutendomarufu2929 Год назад +4

    Thank you for sharing this.

  • @phineasmasori3540
    @phineasmasori3540 Год назад +2

    Thank you for your update

  • @mhopi9744
    @mhopi9744 Год назад +3

    Impressive work 👏👏 Zimbabwe 🇿🇼 is beautiful

  • @ntombizodwancube3365
    @ntombizodwancube3365 Год назад +2

    Murikutoshama muri I kuti this time akazama Chokwadi after 43 years vanhu imwi hamusi serious. Ngaapinde mukomana

  • @washingtonmadishi6317
    @washingtonmadishi6317 Год назад +2

    Nice work

  • @dhereckmherekumombe1945
    @dhereckmherekumombe1945 Год назад +1

    Vamwe togara tiripo live pakugadzirwa apo truth be told mari yakataurwa nezvikuvakwa marara chaiwo the progress is very substandard

  • @geniushomwetv9793
    @geniushomwetv9793 Месяц назад

    ❤ let's appreciate the government work

  • @kundaimuchemwa7252
    @kundaimuchemwa7252 Год назад +4

    Ndizvo zvavanodai vachiita makoreose aya nekuti ibasa re government kugadzira nyika hazvisi zvekubvatati tinofanira kumuvhotera izvozve plus the guy is 87 years old. This year ava kupinda mu 88 saka tingarambe tichitungamirwa nemunhu achembera kudaro here .

  • @proactiveafrica323
    @proactiveafrica323 Год назад +1

    Brick by brick, thank you for update madam. the only thing i dont i like in the season we are in is elections, our elections creates tensions and disrupt progress mood.

  • @tinotendamuguti5919
    @tinotendamuguti5919 Год назад +4

    Ed chinenge chiine ma points this time gegege chibaba ichi

  • @CareEquip
    @CareEquip Год назад +4

    The company should make sure that they create a safe working environment for its workers and all stakeholders. The work area should be fenced off those coming on site should be inducted. There should be an information center with pictures of the to be completed structure.

    • @sithabelamandlawenkosiwodu6298
      @sithabelamandlawenkosiwodu6298 Год назад

      It's just a road.

    • @CareEquip
      @CareEquip Год назад +1

      @@sithabelamandlawenkosiwodu6298 unfortunately safety does not take a holiday and can never be under estimated. In fact construction is responsible for some of the most incident and accidents.

  • @mikemukanyima5853
    @mikemukanyima5853 Год назад +5

    Why are people walking all over the construction site..Shouldn't it be off limit.They should put a perimeter fence.

    • @tanashiloh
      @tanashiloh Год назад

      Wanted to say the same thing. The whole site should be inaccessible to the public..safety 1st means guarding against anyone without proper safety gear from walking up and down construction sites

    • @hoto31
      @hoto31 Год назад

      I Zim yatisiyanei nekune dzimwe nyika manje manje uchatozoona pane kamwe karoad ipapo ikaramba yakadaro kana kutozoona pakuitwa base remjolo

  • @Potondiwe
    @Potondiwe Год назад +2

    Nice 👍

  • @liamwilliam6650
    @liamwilliam6650 Год назад

    My Zim sunshine 🌄

  • @trmangena2463
    @trmangena2463 Год назад

    This looks fantastic ,to the haters l say even when you build a house it looks like you are using old bricks until you finish then it can show

  • @oswellmuranda4721
    @oswellmuranda4721 Год назад +3

    Plz next time an update should be much better than what is inside of this vedio.... Zvagai vanogona kutsanangura kwete kungonongedza mudenga zvandaona

  • @magdaline6383
    @magdaline6383 Год назад +6

    It looks thin Is it going to hold the traffic?

  • @user-tq5te6rd4k
    @user-tq5te6rd4k Месяц назад

    Let me keep my comment ndingatsomwe hangu yoooo pane nyaya basa riripo apo ko kuzoti but ratopera manje ummm

  • @ashleymargolis1867
    @ashleymargolis1867 Месяц назад

    When,are you coming back?

  • @N.M.M1998
    @N.M.M1998 Год назад +3

    Bridge 2 iro hmmmm handiritembi anyway nice work

    • @MillonEnt
      @MillonEnt Год назад

      it is not 90 % like she is saying

    • @michaelnyabanga7956
      @michaelnyabanga7956 Год назад

      Unopenga 😂😂😂 hauna form 4 apa hau thembi zvinhu zvirikuitwa nema engineer

    • @N.M.M1998
      @N.M.M1998 Год назад

      @@michaelnyabanga7956 😂😂😂as if you know my results. Kuita engineer doesn't mean that wakugona zvese, they also make mistakes. Anyway I'm sure ndakadzidza kukupfuura

  • @cfarp7160
    @cfarp7160 Год назад +3

    Thickness yemaslabs ayo bho here amana, maheavy trucks anopfuura here apo

    • @michaelnyabanga7956
      @michaelnyabanga7956 Год назад

      These are engineers building ma civil ma architectural etc saka be at peace wangu

  • @deethecoder4335
    @deethecoder4335 Год назад

    Kindly include drone footage next time … good work

  • @PeterChigombe-kl6ug
    @PeterChigombe-kl6ug 2 месяца назад

    Nguva ndiyo irikureba hazvisi kupera why zvinoda maprojects aya anoda kupihwa macompanies ekunze ane capacity uye vanovaka zvakanaka

  • @nmdread
    @nmdread Год назад +2

    Zanu PF mouthpiece

  • @richardchange6278
    @richardchange6278 Год назад +2

    Slowly but sure well done

  • @tapiwamaweni4329
    @tapiwamaweni4329 Год назад +1

    Just a quick one on bridge 2 why did they leave that big open space

    • @michaelnyabanga7956
      @michaelnyabanga7956 Год назад

      Finally someone anobvunza zvinhu zvinotonga zvine basa 😂😂😂😂

    • @tapiwamaweni4329
      @tapiwamaweni4329 Год назад

      @@michaelnyabanga7956 hauna kupawonawo here mota ikabuda muroad inono pinda pane that’s space, kuita tuma strip twe road

  • @washingtonmadishi6317
    @washingtonmadishi6317 Год назад +2

    Please show us drone images

  • @thekelvins3456
    @thekelvins3456 Год назад

    huhhh ndezvana kamba izvi since when

  • @mwanawemuporofita5610
    @mwanawemuporofita5610 Год назад

    So how many bridges in total will be there?

  • @clevertmuzondo7125
    @clevertmuzondo7125 Год назад

    We also wany drone footages for a better view of the progress

  • @jonathanmbedzi9790
    @jonathanmbedzi9790 Год назад

    Missing developments in Mbudzi Interchange.

  • @rogerchanda
    @rogerchanda Год назад

    Buza ngesintu

  • @georgezibuye1062
    @georgezibuye1062 Год назад +2

    I can see the purpose.

  • @MrRastafari01
    @MrRastafari01 Год назад +1

    I will be honest, these bridges look unsafe. I am pulling for Zimbabwe to make it happen but you need an ARCH BRIDGE for safety. It is a 200+ year old technic. Let’s wake up people, no short cuts trying to steal money. Build real things.

  • @cakeangel304
    @cakeangel304 Год назад

    tip of the iceberg. i agree there is much positive impact brought by the construction of this bridge but on the other hand this is another way of diversifying tax payers finances into the big figures pockets which are already full. Its taking time to complete this little project and the projected figures mmm are too much.

  • @victorchiponda1134
    @victorchiponda1134 Год назад

    The truth is that ,,the project is really amazing but ,,,the runners are too slow the way they are operating is really slow If they kept on operating with this pessy we can even enter in 2030 without being completed

  • @benmorata9237
    @benmorata9237 Год назад

    Ummmm tha😂t 90% complete bridge looks tiny and old fashioned. I don’t think it’s strong enough.

  • @MikeMichaels..
    @MikeMichaels.. Год назад +1

    Bridge 2 it's poorly built especially the top part.... look at the edges of the bridge ....

  • @eslinmatema7104
    @eslinmatema7104 Год назад +3

    Aaah this tym chakazama ED

  • @mosesmuriri594
    @mosesmuriri594 Год назад

    Why is it those kids are passing in out without safety boots 👢

  • @hoto31
    @hoto31 Год назад

    nesimbi dzatinadzo chibridge icho chakasara mazuvaano hakuchaitwa izvo

  • @talentshumba8875
    @talentshumba8875 Год назад +3

    Ed pfeee

  • @zodwancube3874
    @zodwancube3874 Год назад +4

    Who is gonna fix those roads in Mathabeleland cause everything they are fixing in Mashonaland

  • @tapiwatamayi985
    @tapiwatamayi985 Год назад

    What's so special about a bridge they are necessary and should have been built long ago why it's taking 18months yet other countries can do an interchange in 8weeks shows how behind we are it's nearly two years of bad traffic I use the road and it's a nightmare you can't commerce and trade on slow down for two years its unacceptable 18months seriously 😳