Contact Engineer Ewere for your building projects 07064059342 Contact Agent Onos to buy properties here in Delta State 08136277612 For Enquiries, Business And Sponsorships Contact Mewerium@gmail.com
Brilliant and comprehensive breakdown. The video is really useful...because even though the cost of materials would change with time, the required quantities for a house this size would remain the same...so one can always make reference to this video and avoid the danger of being cheated via deliberate material overestimations by unscrupulous contractors....a practice which is all too common these days !
No labour costs and no transportation costs for the materials so not the actual total cost , but a good breakdown of the materials for a large 4 bedroom bungaow
High appreciate your conten. This is very helpful especially for people who are trying to build back home. There’s a lot of confusion with some unqualified builders there and market con saying a different thing and doing a different thing. thank you. I really appreciate you. It is very helpful. Remain safe and blessed.
Very informative. I will advise that you should start adding an estimate/educative guess of labour cost and other hidden cost such as water supply & logistics of materials to site so one can have a more complete mental picture of costing.
Good job my sister, please continue and more strength, more grace and divine breakthrough in your channel. You are helping us a lot, with your help I could be able to track people that's in charge of my building for my mother inlaw.
Skeletal Approximate cost , You're doing well, LABOUR, Transport , other cost cost implicating items not included, good one though, well done my Sister, QS BELOVED
Thanks for the estimated breakdown of costs, very useful, however in reality the rate of flunctuation of the Naira relative to the dollar will make a building project good ol rodeo! And, if you decide to buy everything in advance, I guess you'll have to factor in the security costs.
Tall note that when buying materials You may not use it finish So u might not be buying fresh materials But using what let and buying few to add to it There’s management in building hux
Well it would cost lesser if you use the wood from the dpc for the remaining parts. The wood doesn’t get spoilt easily so why buy it twice.. truth of the matter is as you buy materials for building you’ll figure out a way to manage.. if concrete isn’t finished from previous buy then you don’t need to buy so much the second time. Same goes for sand and wood and nails and rods. As you go you’ll manage the remainder.
Labour is the cheapest of all worries in construction - cheapest doesn't mean quack labour oooh, cheapest when compared to the cost of materials - as per my experience the labour charges required for this stage as per the video won't be more than 1.5 million including professional fees for Architects, Engr's, Mason, Carpentry etc.
A building is not complete without the wiring, plumbing and electrical fittings and installation. Your estimate excludes the cost of plastering too, which could be size able..
Decking is the stage after the ground floor, before the first floor. Its almost like the foundation that the first floor will sit on, while the parapet is a design at the edge of the roof before the final roofing
Contact Engineer Ewere for your building projects
07064059342
Contact Agent Onos to buy properties here in Delta State
08136277612
For Enquiries, Business And Sponsorships Contact
Mewerium@gmail.com
I hope your 13.7m is excluding workmanship???
@ehickioyaendurance2158 No, Workmanship is NOT included
128 comments. The channel we didn't know we needed.❤
Very intelligent lady with her profession. She is blessed. Dede watching from Barcelona Spain.
God bless you. May you own your own Construction Company and Estates worldwide.🙏
Amen 🙏 🙏 🙏 🙏
Thank you so much 🙏❤️
God Almighty bless you Real Good 🙏❤️
I love this thought on building project.
Thanks alot my dear sister, you have calculated excellently
Secret exposed finally🎉
Brilliant and comprehensive breakdown. The video is really useful...because even though the cost of materials would change with time, the required quantities for a house this size would remain the same...so one can always make reference to this video and avoid the danger of being cheated via deliberate material overestimations by unscrupulous contractors....a practice which is all too common these days !
EXACTLY 👌
No labour costs and no transportation costs for the materials so not the actual total cost , but a good breakdown of the materials for a large 4 bedroom bungaow
Those are not included in this video
But I will include them in subsequent videos
@@BuildWithMoe Dalu Nwanyi Oma!
Well done
Not easy @@BuildWithMoe
High appreciate your conten. This is very helpful especially for people who are trying to build back home. There’s a lot of confusion with some unqualified builders there and market con saying a different thing and doing a different thing. thank you. I really appreciate you. It is very helpful. Remain safe and blessed.
Amen🙏
Thank you 🙏
Am very glad you found the videos Helpful 🙏❤️
Thanks for the video, pls make more video on 5bed rooms duplex
Ok, noted ✍️ ✅️
waoo great job
Thank you 🙏
Thanks for showing🙏🙏❤️
You're welcome ❤️
Am glad you found the video Helpful
Brilliant! Very useful and informative.
Thank
Am glad you found it Helpful
God Bless you for this
Amen 🙏
Thank you,
Am glad you found the video Helpful
Why she don't have more subscribers? Thank you so much for taking away my fear
You're welcome ❤️
Am glad you found this video Helpful 🙏
I wish I can save this video very impressive
Very informative. I will advise that you should start adding an estimate/educative guess of labour cost and other hidden cost such as water supply & logistics of materials to site so one can have a more complete mental picture of costing.
@@patrickanekwe Ok, noted ✍️ ✅️
Good job my sister, please continue and more strength, more grace and divine breakthrough in your channel. You are helping us a lot, with your help I could be able to track people that's in charge of my building for my mother inlaw.
Amen 🙏
Am glad you find this video Helpful
Thanks for your accurate estimate❤
You're welcome ❤️
Allways continue that way. Your explanation is very clear, simple, und understandable thanks ❤
Thank you 🙏
Am glad you found the videos Helpful
Yes, very good.
Nice
I will follow up because of this 🎉
Thank You for this informative video. Your video has encouraged me to start building 2025.
You're welcome
Am glad you find my videos
I’m an architect I create designs too and manage … the prices may vary based on location and design type
Well said..🎉
But the technical word for concrete facial is parapet not parafet...thanks
You're so smart. Thank you so much!
Thank you 🙏
Am glad you found my videos Helpful
Cool concept
Thank you so much. Your video is very informative.
@@leonardoxavia3797 You're welcome
Am glad you found the videos Helpful
You just got a new subcriber thanks so much this is valid ❤
Thank you 🙏
Please, make an update to include the roofing, ceiling, doors, windows and plastering. Thanks for this quick guide!
Noted ✍️✅️
I will
9ice one baby you're good at ur job
Thank you
Thanks sis
Thanks you so much i really love your video and your analysis. Keep it up
Thank you 🙏
Am glad you Enjoyed watching
Nice
Thank you 🥰
Thanks for the breakdown, this really makes a lot of sense and can help to plan a building in phases
You're welcome ❤️
Am glad you found the videos Helpful
Good work
Thank you
God bless you ma
🎉🎉🎉
Amen 🙏 🙏 🙏
Thank you
So wonderful 🎉
Nice one, it’s so helpful 🔌🔌🔌
You got a follower ❤ I'm building soon 😊
Thank you 🙏
CONGRATULATIONS 🎊 ❤️
You did great moe 👏
Thank you 🙏
Your video was very much helpful and detailed. Thank you.
Cheers.
You're welcome
Am glad you found the videos Helpful
Beautiful 🎉 Job
Thank you 🙏
She did so well. Be reminded that this estimate excluded the cost of labour.
Thanks well done my dear I love your program.
Am glad you find my videos Helpful 🙏❤️
You tried keep it up 🎉
Thank you 🙏
Like your content. Carry on
Thank you 🙏
I love your video it explains everything
Thanks girllll. Good job!
Thank you 🙏 ❤️
Very impactful video ❤
@emmanuelkaosisochukwu7079 thank you
Am glad you found the video Helpful 🙏
thank you for this video ma
@@factomy You're welcome 😊
Skeletal Approximate cost , You're doing well, LABOUR, Transport , other cost cost implicating items not included, good one though, well done my Sister, QS BELOVED
Yes 👌
Thank you 🙏
🎉🎉🎉
Thank you for making this video is very helpful
You're welcome ❤️
Am glad you found the videos Helpful
Thanks
You're welcome
Thanks you my sister God bless
Amen 🙏 🙏 🙏
Good Girl
Welldone. Excellenct
Thank you 🙏
Am glad you found this video Helpful 👌
Best content
@@CodeSnap54 Thank you so much 🙏 👏
Well done 👍
This is really informative, very thorough.
Thank you 🙏
Am glad you found the video Helpful 🙏
Tnx sis
You're welcome
Thanks for this.
You're welcome 😊
Am glad you found the video Helpful 🙏
I love this video keep it up please ❤
Thank you
Am glad you found the video Helpful 🙏 ❤️
from the first 1minute I was hooked--- great content and information❤
Thank you 🙏
I glad you found the Helpful
Don't also forget that, some materials can be re-use; like boards, woods and nails.
Thanks dear
You're welcome 😊
Well done sis 👍👍
@godisgreat2391 thank you 🙏
Nice greetings from germany 🇩🇪
@ehimwenmajames347 thank you
I just subscribe to your channel now
Thank you 🙏
Your videos are very helpful , i appreciate the content you make 🇯🇲🇳🇬🤝🏾
Am glad you found the videos Helpful 👏
God bless you
Amen 🙏
Thank you 👏
You’re excellent 🎉❤
Thank you ❤️
@@BuildWithMoe your welcome 🤗, just do the roofing cost for the 4 bed room
@@Kim_Chris300 Noted ✍️
I will
@@Kim_Chris300 Noted ✍️
I will
God bless you jare
@@davidoladimeji8479Lols,
Amen 🙏
I love your analysis, you did a great 😃👍 job ma'am. So amazing 😍🤩
Thank you 🙏
Am glad you found the video Helpful 🙏
Indepth details
Thought leadership well served kudos ma'am keep it up... Ur content is informative
Thank you 🙏
Thank you
You're welcome
Good but you should have done calculations for zinc also to complete the roofing estimate
That is coming soon 👌
Thank you very much ❤❤
You're welcome
Am glad you found the video Helpful 🙏
You are so good
Thank you 🙏
Useful information, well done and thanks.
Thank you 🙏
Am glad you found the video Helpful 🙏
Thanks for the estimated breakdown of costs, very useful, however in reality the rate of flunctuation of the Naira relative to the dollar will make a building project good ol rodeo! And, if you decide to buy everything in advance, I guess you'll have to factor in the security costs.
It's called Concrete Fascia not fiscal. Weldone
Tall note that when buying materials
You may not use it finish
So u might not be buying fresh materials
But using what let and buying few to add to it
There’s management in building hux
👌
Good Job!!
Thank you 🙏
So amazing 😍 omor the money to build newd connection oo😅😅😅poor man rest😅
God go always provide 👌
Can you post the plan design of 3 bed flat
Please contact Engineer Ewere
07064059342
Please contact Engineer Ewere
07064059342
Thanks. All your videos are very impactful. It will be awesome if you can provide cost for 4 bedroom duplex
Am glad you find them helpful 🙌
Ok, noted ✍️
How can I get this building plan@@BuildWithMoe
@@raphsvlog3759 Please contact this number
08136277612
Well it would cost lesser if you use the wood from the dpc for the remaining parts. The wood doesn’t get spoilt easily so why buy it twice.. truth of the matter is as you buy materials for building you’ll figure out a way to manage.. if concrete isn’t finished from previous buy then you don’t need to buy so much the second time. Same goes for sand and wood and nails and rods. As you go you’ll manage the remainder.
True 👌
It sounds cheap in dollars but to save it is not easy.
True 👌
🎉
Skeleton of the building without roofing sheet. Indeed to finishing you should be expecting 25m
Good content, but you didn't include rough labour cost. Watching from UK. Thank you.
Thank you 🙏
I will include that in subsequent videos
Labour is the cheapest of all worries in construction - cheapest doesn't mean quack labour oooh, cheapest when compared to the cost of materials - as per my experience the labour charges required for this stage as per the video won't be more than 1.5 million including professional fees for Architects, Engr's, Mason, Carpentry etc.
Talking of board in the foundation to DPC board was mention can't the same board be use for the lintel ot cut some cost of materials
It can, if the builders handle them well 👌
Fair price 🤔
Wow
You forget the filling of the dpc
That is the latarite
A building is not complete without the wiring, plumbing and electrical fittings and installation. Your estimate excludes the cost of plastering too, which could be size able..
@@fridaybenard8806 So sorry about that 🙏
I will include all of those in subsequent videos👌
Is the parapet same as what is generally referred to as decking.
Decking is the stage after the ground floor, before the first floor. Its almost like the foundation that the first floor will sit on, while the parapet is a design at the edge of the roof before the final roofing
What happened to the woods used for the foundation?
@@amechifrankathan368 If the workers handle them well, then you can re-use them