Roofing Queens hotel in Leeds (urbex)

Поделиться
HTML-код
  • Опубликовано: 4 янв 2025

Комментарии • 14

  • @SummerADDE_Elevators
    @SummerADDE_Elevators 8 лет назад +2

    that elevator is under modernisation. and during modernisation, it is controlled by a temporary "Elevator installation" controller that makes it go up and down so the engineers can trash old stuff and set up the new stuff. The cartop controller and Cable box can be in it's way in the beginning. Also, connecting the rooftop is one of the last things to do, as it will remove the "Installation phase" from the elevator controller, thinking that the elvator has been finnished and is ready to go in service!

  • @keith800
    @keith800 8 лет назад

    Nice find ,and one to go back to when its finished.

  • @tl5298
    @tl5298 8 лет назад

    good video ben who installed the cheap lift?

  • @crazydogeROBLOXBuildingandGame
    @crazydogeROBLOXBuildingandGame 8 лет назад +1

    the lift at the end of the video is that being build because it has no car top controlls

  • @crazydogeROBLOXBuildingandGame
    @crazydogeROBLOXBuildingandGame 8 лет назад +1

    is it crap lester controlls

  • @realtalk4975
    @realtalk4975 8 лет назад +1

    Do more lift tours

  • @haz05-06
    @haz05-06 8 лет назад

    Who else was messing with a Gen2 logic cabinet while watching this?

  • @JD-pu4mq
    @JD-pu4mq 8 лет назад

    hey

  • @LiftsInGermany
    @LiftsInGermany 8 лет назад

    WTF Kollmorgen controllers in England?!?!?!?!?!

  • @theiachannel2759
    @theiachannel2759 8 лет назад

    me like