Pacific Foundation
Pacific Foundation
  • Видео 15
  • Просмотров 10 690

Видео

Oregon 217 Bridge Replacement | Drilled Shafts & Rebar Cage Setting | Pacific Foundation
Просмотров 1447 часов назад
As part of ODOT's OR217 project the Hall Boulevard bridge received a full replacement. The overall project will address long-standing congestion on OR 217 between Beaverton-Hillsdale Highway and OR 99W due to too many closely spaced interchanges: 10 interchanges in just over seven miles! #bridgeconstruction #odot #geotechnicalengineering #drilling #construction #constructionequipment
Fishing Dock Construction - Haapa Park | Micropiles | Pacific Foundation
Просмотров 8814 дней назад
The Haapa Park ADA Fishing Dock project includes the installation of micropiles by Pacific Foundation as part of the dock's construction. These micropiles will provide the necessary support for the new ADA-compliant fishing platform, ensuring its stability and longevity along the southern bank of the North Fork Lewis River. The project is set to be completed by November 2024, with Pacific Found...
Pacific Foundation | Manzanita City Hall | CDSM Soil Mixing | Geotechnical Construction
Просмотров 9813 месяца назад
The City of Manzanita, Oregon reached a critical juncture in their emergency preparedness planning. The City Hall and the Police Station was in an outdated structure that would not withstand a "megathrust" from a Cascadia Subduction Zone Fault. Since the building also serves as an emergency response center, the city acquired a new parcel and began the process of engineering a foundation that wo...
Pacific Freight & Heavy Hauling | Aspen 13 Axle Lowboy | Construction Equipment Transport
Просмотров 1973 месяца назад
The Pacific Freight & Heavy Hauling team set out on an early morning mission to pick up a 66-ton Bauer Equipment BG40 V in Lake Oswego, Oregon.
River S Bridge Replacement 10' Drilled Shafts | Pacific Foundation | Geotechnical Construction
Просмотров 1,8 тыс.4 месяца назад
This project replaced a century-old, single-lane wooden bridge crossing Lake River in the Ridgefield Wildlife Refuge. Pacific Foundation's scope of work on the River S Bridge project included the installation of 120-inch diameter drilled shafts from a barge, leveraging our Bauer BG 55 to achieve depths of up to 132 feet.
Pacific Foundation | Julia West House | CFA Shafts | Deep Foundation Construction
Просмотров 1904 месяца назад
Pacific Foundation | Julia West House | CFA Shafts | Deep Foundation Construction
Pacific Foundation | Willamette Drive Geoblock & Soil Nail Wall | Geotechnical Construction
Просмотров 1384 месяца назад
The City of West Linn began development of the state-of-the-art Athey Creek Middle School Campus in 2021. With the campus now completed, the city turned their attention to improving traffic flow and roadway safety on Willamette Falls Drive. For this project, the existing roadway, slope of the embankment, and the nearby wetlands of the Tualatin River needed to be carefully considered before solu...
Residential Well Drilling w/ a GEFCO 30K Drill Rig | Pacific Geotechnical Well Drilling
Просмотров 5755 месяцев назад
Did you know Pacific Foundation also has a well drilling company? Pacific Geotechnical is the premier well driller in Southwest Washington. With experienced crews and a world class fleet, they can access hard to reach locations on rural sites such as this one in Washougal, Washington.
U.S. 97: OR 58-California Border Bridge Retrofits | Pacific Foundation
Просмотров 1,2 тыс.5 месяцев назад
The US97 OR58 California Border project is a strategic initiative by the Oregon Department of Transportation (ODOT) aimed at enhancing the seismic resiliency of US Highway 97, particularly in the Klamath Falls area. This project is in response to the significant seismic threat posed by the Cascadia subduction zone, which scientists predict could unleash a 9.0 magnitude earthquake, devastating t...
Pacific Foundation | Oregon State Capitol Upgrades | Engineered Shoring Towers + Foundations | CAMS3
Просмотров 1,3 тыс.6 месяцев назад
The Oregon Capitol Accessibility, Maintenance & Safety Projects, better known as CAMS, is an ambitious seismic upgrade project aimed at fortifying the historic Capitol building from a seismic event while also delivering extensive upgrades throughout the Capitol. On this project, Pacific Foundation and our sister company Pacific Structural Solutions were tasked with the engineering, construction...
Pacific Foundation - Deep Cement Mixing on Sand Island | Hawaii Drilling & Soil Stabilization
Просмотров 2,8 тыс.Год назад
Pacific Foundation utilized deep cement mixing at the sand Island WWTP in Honolulu to provide a water tight excavation over 20 feet below the water table in very challenging soils.
Pacific Foundation | CDSM Bottom Seal Project | Honolulu, HI
Просмотров 4762 года назад
Pacific Foundation creating a cement mixed bottom seal at HKV in Waikiki through CDSM and Jet Grouting using Bauer BG28 and BG12. The project also includes 120' CFA piles using the first of its kind Bauer MC128 / Birminghammer lead system with Bauer KDK, which will be installed by Kelikai, our JV partner.
Pacific Foundation | Pearl District PDX - Hillsboro | Geotechnical Construction
Просмотров 7133 года назад
Join Pacific Foundation as they tackle multiple large-scale geotechnical construction projects throughout the Portland, Oregon area. Working with challenging ground conditions in downtown Portland, one crew focuses on deep drilled shafts and full-length cages extending to depths of more than 100'. Meanwhile to the East, another crew takes on a massive Rigid Inclusion project for a confidential ...
Pacific Foundation Driven Pile & Ground Improvement
Просмотров 1263 года назад
Andersen Construction reached out to us with an idea to build a building, on the water, next to the Fremont Bridge. The project had high column loads and initially, we started looking at drilled shafts and providing budgets for that solution. But in Portland, the latest seismic code changes meant deeper reinforcement cages into the column, which drove up the cost significantly. For this project...

Комментарии

  • @ЛейлаИсаева-р1ч
    @ЛейлаИсаева-р1ч День назад

    Martin Patricia Davis Sharon Davis Matthew

  • @sutrisnotrisno5512
    @sutrisnotrisno5512 17 дней назад

    I am site supervisor jubdest

  • @sutrisnotrisno5512
    @sutrisnotrisno5512 17 дней назад

    Good job mr

  • @ccjensen4670
    @ccjensen4670 3 месяца назад

    Last rig I owned was a 30K..new owner had to replace it with a new one to meet CA smog laws. I learned on cable tools in 1972 at 26 years old. My partner started in 1922.. My crew is running the new one. Loved the work..hard as it was! Gary Jensen..dba Nutting and Jensen Drilling Harold Nutting started in 1922. Northern CA is our domain...

    • @pacificfoundation
      @pacificfoundation 3 месяца назад

      That's an amazing history and legacy Gary! Our 30K has been a real workhorse with the casing hammer, be safe out there this summer!

  • @cupwalker24.7
    @cupwalker24.7 5 месяцев назад

    Nice 💪 That's the worst when you lose your casing seal and the casing starts spinning in the hole . Especially if it's spin casing and you spin all your steel apart down hole .

    • @pacificfoundation
      @pacificfoundation 3 месяца назад

      Thanks @cupwalker! It is a really bad day when the casing starts to spin 👎 Luckily we haven't had it happen (knock on wood) with the new rig but have definitely been there before!

  • @mikemartinez2857
    @mikemartinez2857 6 месяцев назад

    Yup them PF guys put in lots of Hours.

    • @pacificfoundation
      @pacificfoundation 5 месяцев назад

      This has been a massive project for sure, but the light is at the end of the tunnel (basement)!