ZBUKA Cakaric
ZBUKA Cakaric
  • Видео 18
  • Просмотров 106 528
DV Izvor Samobor
Izrada ETICS fasade na DV Izvor 2024 god, Samobor
Просмотров: 131

Видео

Obnova fasade Nadbiskupskih dvora
Просмотров 4092 месяца назад
Obnova fasade Nadbiskupskih dvora, Kaptol, 2024
Slip opeka/klinker fasada Baotić, Zagreb
Просмотров 2852 месяца назад
2024 god. izvedena slip opeka/klinker fasada sa 15cm kamene vune na Autodubravi Baotić u Zagrebu.
Hotel Isolano, Cres, Marriott
Просмотров 2102 месяца назад
Hotel Isolano, Cres, Autograph Collection by Marriott. Izvedena ETICS fasada 2024 god
Obnova fasade Tvornica duhana Zagreb
Просмотров 209Год назад
Obnova fasade Tvornica duhana Zagreb
Obnova ETICS fasade Agronomski fakultet Paviljon I/II/III
Просмотров 115Год назад
Obnova ETICS fasade Agronomski fakultet Paviljon I/II/III. Ugrađeno preko 5000 m2 kamene vune.
Obiteljska kuća Zagreb, ETICS i ventilirana fasada
Просмотров 211Год назад
Ventilirana HPL i ETICS fasada, Zagreb
Snimanje bespilotnom letjelicom Žbuka Čakarić
Просмотров 663 года назад
Nudimo usluge snimanje bespilotnom letjelicom www.zbuka.hr
Žbuka Čakarić promotivni video
Просмотров 5484 года назад
Žbuka obrt za graditeljstvo je osnovana 1996. god. Specijalizirani smo za energetske obnove, fasade i unutarnje radove. www.zbuka.hr Music: Nox Vahn & Marsh - Follow Me feat. Mimi Page
Žbuka Čakarić, projekt Vodnikova 6
Просмотров 1 тыс.4 года назад
Projekt Vodnikova 6 Investitor: Žbuka obrt za graditeljstvo Glavni izviđač: Žbuka obrt za graditeljstvo Arhitekt: Denis Ognjanovac Music: Ben Bohmer Purple Line
Stambeni objekt Podbrežje, Zagreb
Просмотров 1,5 тыс.6 лет назад
Stambeni objekt Podbrežje u Zagrebu, preko 4000 m2 kamene vune ugrađeno.
Centar Zvonimir Z4, Zagreb
Просмотров 7476 лет назад
Stambeno poslovni objekt Z4 na Branimirovoj, Zagreb.
Hotel Princess, Jastrebarsko
Просмотров 3,8 тыс.6 лет назад
Hotel Princess u Jastrebarskom, preko 3500 m2 kamene vune ugrađeno u 2 mjeseca.
Centar Zvonimir, Zagreb
Просмотров 4756 лет назад
Centar Zvonimir u Zagrebu, građen od 2007.god do 2017 god. Preko 20 000 m2 fasade kamene vune instalirano. Centar Zvonimir in Zagreb. Built from 2007 till 2017. Over 20 000 m2 of mineral wool facade installed.
Blower Door Test (english)
Просмотров 1076 лет назад
Short video showing Blower Door Test done in cooperation with Irbest from Latvia. www.irbest.eu - Blower Door Test www.zbuka.hr - Thermography
Blower Door Test (hrvatski)
Просмотров 3636 лет назад
Blower Door Test (hrvatski)
Mullion transom (stick) facade installation animation
Просмотров 92 тыс.7 лет назад
Mullion transom (stick) facade installation animation
Ventilated/rainscreen facade installation animation
Просмотров 4,1 тыс.7 лет назад
Ventilated/rainscreen facade installation animation

Комментарии

  • @mehdimizani
    @mehdimizani 4 месяца назад

    Great job

  • @FilipinoBall630
    @FilipinoBall630 3 года назад

    Mum

  • @tejashreebhagat2554
    @tejashreebhagat2554 4 года назад

    is this unit and mullion system???

  • @ernestomandujanoc.6184
    @ernestomandujanoc.6184 4 года назад

    Excelent Wonderfull Vídeo... I like it , and I Love Music for video, What Song is it ???

    • @audreylemon9537
      @audreylemon9537 8 месяцев назад

      Sunset People by Steen Thottrup feat. Katie McGregor

  • @millabakula426
    @millabakula426 4 года назад

    Pozdrav S Mog Kanala

  • @bayan6325
    @bayan6325 4 года назад

    Clear video on cladding parts

  • @ahmadmunim6572
    @ahmadmunim6572 5 лет назад

    What kind of software use for this animation

    • @zbukacakaric7189
      @zbukacakaric7189 4 года назад

      Fusion from Autodesk, powerful and user friendly software

  • @stephendonovan5056
    @stephendonovan5056 5 лет назад

    Apparently the mullion& transform connectection produces significant flnaking noise, I cna't see how from this video?

    • @zbukacakaric7189
      @zbukacakaric7189 4 года назад

      In most cases flanking noise is activated by foot step,that is, some dynamic behaviour and those vibrations are spreaded inside building structure (floor, wall, ceiling etc). Best way to dismiss it is to use "soft"/elastic, materials on elements connections/joints. Stick system uses the same principle of joint connection but has bigger problem with sound transmission (aluminum and glass have weak sound pressure resistance therefore nowadays most of the glass facades are made with triple glazing and laminated glass. In general, sound is a science of engineering on its own and there cant be one exact answer but multiple, depends on system, materials, cross section, location, soundproof requirements etc.

  • @jaime20001
    @jaime20001 6 лет назад

    Alguien sabe con que programa realizó tanto el modelo como la animación??

  • @MJTV-zm2xw
    @MJTV-zm2xw 6 лет назад

    This is a Schuco Curtain Wall system. I can see the profile section of the mullion, the T-Cleats, The end notch of the transom, the deflector block and the mounting brackets. The method as well is very Schuco.

  • @Lampham-ke8ny
    @Lampham-ke8ny 6 лет назад

    hi sir. I'm trying to find the differences between of the stick and semi curtain wall systems. could you please explain to me? thanks in advance

    • @zbukacakaric7189
      @zbukacakaric7189 6 лет назад

      I did thesis on facade installation optimization. The difference is that with curtain you install it from member to member and with semi unitised first mullions and then infill panels (in this case glass). This is quite often a misunderstanding what is semi unitised, unit and mullion or semi curtain wall system. At the end they are all the same and it depends from every expert how he/she will name it and cross section (or installation method) is made. This is a quote from my thesis, you can find it on research gate, Ivan Cakaric , "Sometimes called panel, panelised system, hybrid system or mullion and panel they are not implemented in the façade typology and therefore fewer information about this system could have be found. Unit and mullion name is classified by AAMA Aluminium Curtainwall Design Guide Manual.Unit and mullion has a gridwork similar to stick system and prefabricated framed panels installed between. It is a system between stick system and unitized. It was popular in the 70s but is rarely used today (Canada Mortgage and Housing Corporation, 2004). Its main advantage is to span two floors. For the North American market, mostly structural sealant is used for unit attachment. In this system, there will not be any aluminium member visible from outside."

    • @zbukacakaric7189
      @zbukacakaric7189 6 лет назад

      DOI 10.13140/RG.2.2.34868.96642