Case Study - Optimising Precast Manufacturing

Поделиться
HTML-код
  • Опубликовано: 30 июн 2024
  • Have you ever wondered how many precast concrete segments are required to create Victoria’s North East Link tunnels? Hint: it’s a lot.
    What about where they come from and how they are manufactured? Hint: they’re manufactured locally at the largest precast facility in the southern hemisphere.
    If you’ve asked yourself either of these questions, then you’ll want to watch this! If you haven’t, we think you will too.
    APS Industrial are proud to have worked alongside Deacam Engineering to support LS Precast in the delivery of over 43,000 precast concrete segments used to build the 6.5km North East Link tunnels.
    The project underscores how local collaboration and capability have the power to deliver world-class outcomes.
  • НаукаНаука

Комментарии • 1

  • @grubb9859
    @grubb9859 22 дня назад +1

    Wow, it's incredible to see cutting-edge technology being implemented to boost efficiency in Australian manufacturing! The collaboration between APS, Deacam, and LS Precast, powered by Siemens automation, is truly impressive. This project showcases how innovation in regional facilities can significantly contribute to major infrastructure developments. Great to see Australian ingenuity at work!