I think it is safe to say that your channel is saving my career! I can not thank you enough for all the knowledge, organization and thought put in your work!
@@SAPwithIK i have a question with mrp area. the requirement qty of semi is used for producing FG is sloc 2007, however semi was produced in slic 2006. so i want result of md40: planned order of semi has default good receipt sloc is 2006. how can i set this senerio?
@men.nguyen please create two MRP areas with sloc 2007 and 2006. Assign these MRP areas to the corresponding material codes along with the prod sloc codes in MRP area views. MRP can be executed and the planned order will show the required results.
@@SAPwithIK yes i assigned SFG & FG with 2 MRP area 2006 &2007 and maintain prod sloc 2006 in mrp area 2006, set prod sloc 2007 in mrp area 2007. system behave: 2 planend order of FG at 2006 &2007 -> dependent requirement of SFG at 2 sloc 2006, 2007 -> after run MPS -> planned order of SFG was created with prod sloc 2006 & 2007. But what I want is that after run MPS , both 2 planned order of SFG was created with sloc 2006 only, not 2007.
Best channel on SAP PP!!, thank you so much for sharing.
I think it is safe to say that your channel is saving my career! I can not thank you enough for all the knowledge, organization and thought put in your work!
Thanks for the feedback
See video from IK - always like👍 👍
love your chancel so much ❤
Great contents! I will study all of them. Always Thanks a lot
Thank you Sir.
Your channel is a TREASURE!! Thank you so much. Do you have content on demand planning?
Yes, please check the channel playlist
please create full course ,it would be the best course ever
Sir what about CO-product, By-product and Scrap demo (pls pls). Also it will be good to see PRT demo or X-Steps video)
Can you please make one video on planning calendar based lot sizing process.
Can you please upload videos for IDOC processing and MES integration configuration with Logical system.
Sir, request to Please post videos on PPDS. Thank you
Hi sir, please take 1 training session on PP in details
Sir.. Please make a video on the work centres formulas please sir
This is already covered. Please check the playlist
Hi sir
Looking for KANBAN process in SAP PP
Sir please take lecture on work center formula key which means how to define formula key for work center.
Thanks for the suggestion. Sure will do.
Thanks sir. 🙏
Parameters like Electricity,steam,etc how to make formula.
@@nairnikhil92 electricity means power consumption so u can use formula parameters like power * operation qty/base qty /operation splits
@@nairnikhil92 u can use same formula for steam consumption bs power ke jagah pe steam formula parameter maintain karo
Pls make videos on intergdation pp with CO modules
Thanks for the feedback. Please check the playlist, this is already uploaded.
@@SAPwithIK i have a question with mrp area. the requirement qty of semi is used for producing FG is sloc 2007, however semi was produced in slic 2006. so i want result of md40: planned order of semi has default good receipt sloc is 2006. how can i set this senerio?
@men.nguyen please create two MRP areas with sloc 2007 and 2006. Assign these MRP areas to the corresponding material codes along with the prod sloc codes in MRP area views. MRP can be executed and the planned order will show the required results.
@@SAPwithIK yes i assigned SFG & FG with 2 MRP area 2006 &2007 and maintain prod sloc 2006 in mrp area 2006, set prod sloc 2007 in mrp area 2007. system behave: 2 planend order of FG at 2006 &2007 -> dependent requirement of SFG at 2 sloc 2006, 2007 -> after run MPS -> planned order of SFG was created with prod sloc 2006 & 2007. But what I want is that after run MPS , both 2 planned order of SFG was created with sloc 2006 only, not 2007.
Can you please email with screenshots to sapwithik@gmail.com
how confirmed dates are coming in production order ?
Based on the operation confirmation
Hi sir
Please help explain in detail on wm pp integration topic
Good one..sure will do
I’m end user Of SAP and working as a quality engineer. Is it compulsory SAP certification? i’m trying for SAP Pp
Not compulsory but good to have.
Now a days most company's are asking.
@@nairnikhil92 thanks.. i will do
Hello Sir
We are struggling in working.please plan for 1 session according to your time availability.
What are your challenges?
@@SAPwithIK I need training from basics to adavace level
@@SAPwithIK my friend is also interested for training from u
Hi sir, are you planning?