OpenBVE R211 on the B Line

Поделиться
HTML-код
  • Опубликовано: 21 авг 2024

Комментарии • 3

  • @HighlightDarkness
    @HighlightDarkness 2 года назад +2

    Make sure that gladiator dosent make this one lag as much

  • @BronXLimited
    @BronXLimited 2 года назад +1

    R211 testing on Concourse wont happen anytime soon due to constuction on concourse and theres a Pipeline that fell above 205 and the station was flooded this morning.

  • @josejeremyortiz9635
    @josejeremyortiz9635 2 года назад +1

    Can you do a full ride with the r211 on. B or d line