Clash Detection, BIM Coordination, Navisworks vs Solibri with Ignacy Lozinski | BIM Pure Live

Поделиться
HTML-код
  • Опубликовано: 28 ноя 2024

Комментарии • 6

  • @pramodnani8312
    @pramodnani8312 2 месяца назад +1

    Wow.. ❤this is want I'm waiting for 😊

  • @DAngeleski
    @DAngeleski 2 месяца назад +1

    This workflows seems too secure and good, but....do we have the time and resources to implement this methods? Especially for simple projects. Or we are just selling good methods, that we are not sire if we will use for another project?

  • @DAngeleski
    @DAngeleski 2 месяца назад

    What if you have architectural decision to move the walls and every MEP stuff needs to be moved for tomorrow?

  • @DAngeleski
    @DAngeleski 2 месяца назад

    Why coordination is the most outsourced work?

  • @thumDerr
    @thumDerr 27 дней назад

    Funny how the search set example shows how bad Revit is in exporting ifc, like mapping the Revit Category to the Pset_ProductRequirements, which is totally unrelated, but Revit has a baked in behaviour that it will match almost anything just based on parameter / property name equality

  • @katarzyna6123
    @katarzyna6123 2 месяца назад

    Hello! I am using Navisworks on daily basics. But it is not working well with BCF Manager in Revit. This is my workflow:
    1) running the report in navisworks,
    2) upload collisions as an issue to bimcollab throughout BCFManager
    3) Downloading issues throug BCF in Revit BUT it does not redirect us to collisions in the model
    can it be set somehow? I tried by exporting viewpoints instead of clash but then I am not able to update issue with next report
    I have been trying to work it out for two days but with no succes! Hope someone will help me deal with it : )