Размер видео: 1280 X 720853 X 480640 X 360
Показать панель управления
Автовоспроизведение
Автоповтор
The final image shows a panel of Earth Stone Marrakech with lime soap applied on the right, dead flat eco seal applied on the left, and an unsealed finish in the middle.
How did the end result end up with a lighter swath in the middle? It doesn't appear that any different application was done?
Well over priced materials, nice can though. Who would wait 2weeks for cure time before finish can be applied??
2 weeks is a short period actually. Most coatings are 30 ish day range for cure time.
The final image shows a panel of Earth Stone Marrakech with lime soap applied on the right, dead flat eco seal applied on the left, and an unsealed finish in the middle.
How did the end result end up with a lighter swath in the middle? It doesn't appear that any different application was done?
Well over priced materials, nice can though. Who would wait 2weeks for cure time before finish can be applied??
2 weeks is a short period actually. Most coatings are 30 ish day range for cure time.