Marrakech Application Demonstration

Поделиться
HTML-код
  • Опубликовано: 15 ноя 2024

Комментарии • 4

  • @pureoriginalpaint2668
    @pureoriginalpaint2668  9 лет назад

    The final image shows a panel of Earth Stone Marrakech with lime soap applied on the right, dead flat eco seal applied on the left, and an unsealed finish in the middle.

  • @artsytartsy3235
    @artsytartsy3235 9 лет назад

    How did the end result end up with a lighter swath in the middle? It doesn't appear that any different application was done?

  • @englishdecorator
    @englishdecorator 5 лет назад

    Well over priced materials, nice can though. Who would wait 2weeks for cure time before finish can be applied??

    • @bonnivilleblackcherry9745
      @bonnivilleblackcherry9745 2 года назад

      2 weeks is a short period actually. Most coatings are 30 ish day range for cure time.