Wow, another full episode and not complete. I am 98.673% sure the roller coaster will be complete after the pre-fabs are done. You sure will be well financed for the next project. You may have to balance that fact out with some sort of challenge in the next series. Otherwise your next series may be too easy. You are a pro after all. Great video. Thank you.
If you need to have more for the roller coaster. The train goes rou d the back of the vehicle shop so you could drive train there and unload what u need if you need
Your Silverrun series lives on to at least one more episode. Still enjoying it though, so no problem!
Wow, another full episode and not complete. I am 98.673% sure the roller coaster will be complete after the pre-fabs are done.
You sure will be well financed for the next project. You may have to balance that fact out with some sort of challenge in the next series. Otherwise your next series may be too easy. You are a pro after all. Great video. Thank you.
If you need to have more for the roller coaster. The train goes rou d the back of the vehicle shop so you could drive train there and unload what u need if you need
Check out the Man TGX Truck Pack's 6x4/4 for next time. Lift axle option provides two axile steering .
William
Ah, doesn't the train cost $1,000/hr?