Размер видео: 1280 X 720853 X 480640 X 360
Показать панель управления
Автовоспроизведение
Автоповтор
with so many stop it is not getting its real speed.
Yes.. railway corridor between Mumbai and Ahmedabad of about 508 km (316 mi) is currently under construction with a designed maximum operational speed of 350 km/h (217 mph) and is expected to be operational fully by 2028-29.
with so many stop it is not getting its real speed.
Yes.. railway corridor between Mumbai and Ahmedabad of about 508 km (316 mi) is currently under construction with a designed maximum operational speed of 350 km/h (217 mph) and is expected to be operational fully by 2028-29.