Video Mock Test 3 for JE PWAY IN HINDI & ENGLISH IN RAILWAY| 50 Q| TRACK ENGINEER

Поделиться
HTML-код
  • Опубликовано: 11 сен 2024
  • Track Engineer |Video Mock Test 3 for JE PWAY IN HINDI & ENGLISH IN RAILWAY| 50 Q| Er. Trivendra Kumar
    Mock tests are like practice runs for your big exam or test, and they can be a major factor in your success. Here's why:
    Identify Strengths and Weaknesses: Mock tests expose areas where you excel and those that need more work. This helps you focus your studying and target your weak spots.
    Exam Simulation: Mock tests mimic the real exam format, including question style, time constraints, and test structure. This familiarity reduces anxiety and prepares you for the pressure of the actual exam.
    Time Management Skills: Mock tests help you develop effective time management skills. You'll learn to pace yourself and allocate time efficiently to complete all sections within the given timeframe.
    #mocktest
    #mocktestjepway
    #mocktestertrivendrakumar
    tunnel,engineering,guard rail,derailment guard,check rail,construction,guardrail in tunnel,derailmentgaurd in tunnel,irpwm,ldce,lgs,lgs70,ldce30,track,railway track,question bank,question bank 2024,guard rail in bridge,train tunnel,construction of the windsor detroit tunnel,battle of campden tunnel,railway bridge and tunnel engineering,how train turns on curved rail,bridge department in railway track,underground tunnels,tunnel concreting,tunnel construction

Комментарии • 21

  • @RAMPRASAD-jl9js
    @RAMPRASAD-jl9js 4 месяца назад +2

    Aapka video bhut tip top lagta hai sir ji thora every question ka details me jate to or achchha lagta THINKS

  • @Rish.abh.007
    @Rish.abh.007 Месяц назад

    बहुत अच्छा ज्ञानवर्धक वीडियो

  • @sanyogprajapati5400
    @sanyogprajapati5400 4 месяца назад

    Sir aapka video bahut hi helpful hai question sir Hindi me rahe to best hai

  • @TajBabu-vk8dr
    @TajBabu-vk8dr 3 месяца назад

    Best video thanks

  • @PujaKumari-xp4mu
    @PujaKumari-xp4mu 3 месяца назад

    Very good

  • @sanyogprajapati5400
    @sanyogprajapati5400 4 месяца назад

    Continue sir 🙏🙏

  • @dr.bairwanr1245
    @dr.bairwanr1245 2 месяца назад +1

    जेई / एसएसई (पी वे) एवं ट्रेक मेंटेनर्स से इच्छुक जेई में पदोन्नति के लिए "न्यू रेलपथ गाइड" हिन्दी पुस्तक, लेखक डॉ एन आर बैरवा अवश्य ही पढ़े । अपने ज्ञान वृद्धि के साथ साथ रिफ्रेशर/प्रमोशन या सेलेक्सन (जीडीसी/एलडीसी) की राह बहुत आसान हो जाएगी ।
    धन्यवाद्

  • @tamannabegum2251
    @tamannabegum2251 4 месяца назад

    Thanks sir ji best video

  • @balajimd482
    @balajimd482 4 месяца назад

    Very Very good Sir 👍

  • @govindprasadkushwaha2744
    @govindprasadkushwaha2744 4 месяца назад

    For ARME short duration whistle is required.
    4 long means ART required main line is jammed.

  • @arvindmalik9206
    @arvindmalik9206 3 месяца назад

    Sir aap ne art and arme se related question time second me nahi ye minutes me hoga

  • @jitendrakumar-lw3hj
    @jitendrakumar-lw3hj 4 месяца назад

    Q. Maximum wear on rajdhani root 8 mm at cms crossing

    • @trackengineer
      @trackengineer  4 месяца назад +2

      Maximum permissible vertical wear on wing rails or nose of crossing shall be 10 mm.
      However, on Rajdhani/ Shatabdi routes, as a good maintenance practice, crossing and the wing rails should be planned for reconditioning/resurfacing by welding on reaching the following wear limits:
      (i) Built up/Welded Crossing - 6 mm
      (ii) CMS crossings - 8 mm

    • @jokesislife6254
      @jokesislife6254 4 месяца назад

      Yaha nose of crossing pucha hai means CMS crossing to 8 mm hoga

  • @shubhamrai2904
    @shubhamrai2904 4 месяца назад

    Sir
    Q_Reading of rain gauge in PWI office at which time.
    Ans plz

  • @SANJAYGupta-wv4wm
    @SANJAYGupta-wv4wm 2 месяца назад

    Question no.10 ka sahi answer one in 4 month hoga
    Please 🙏 see c/S no.19 dt.29.05.2024