Three bedrooms, two-bathroom residential dream home design for Clarendon JA.

Поделиться
HTML-код
  • Опубликовано: 8 ноя 2024

Комментарии • 28

  • @anthonyvaz2944
    @anthonyvaz2944 Год назад +1

    Thank you very much for the information

  • @fraagg3452
    @fraagg3452 7 месяцев назад +1

    Lovely, Drawing lots of lots, of blessings.

  • @fraagg3452
    @fraagg3452 7 месяцев назад +1

    Lovely, drawing lots of lots of blessings.

  • @narchalia
    @narchalia Год назад +1

    Great that you found my input helpful.

  • @lwjunior2
    @lwjunior2 Год назад +1

    Great content as per usual Chief!

  • @karenjenkins9838
    @karenjenkins9838 Год назад +1

    You go Karl

  • @narchalia
    @narchalia Год назад +1

    This is an excellent functional layout, but I agree with the suggestion of moving the washroom and replacing it with a powder room. I would change the entrance from the kitchen area for the powder room to opposite the door to the primary bedroom in that hallway. I would remove the curved steps at the front of the house and replace with rectangular steps, as this would be in keeping with the straight lines of the house. Generally a great concept.

    • @jkengineeringarchitecture.
      @jkengineeringarchitecture.  Год назад

      Yes I will make those Changes. Especially the idea of the steps from circular to square . I told you several times before that you are an Architect you always have good architectural ideas.

  • @BM-uv5sl
    @BM-uv5sl Год назад +1

    Blessings. Love the layout. I would put a powder room where the washroom space Is.
    Create a space on the back porch behind the kitchen along the back bedroom wall 🧱 for the washroom. Rectangular steps. Keep it straight lines.
    If you have guests over you don't want everyone using that one bathroom that already sharing
    two bedroom.
    Keep up the good work 👍.

    • @jkengineeringarchitecture.
      @jkengineeringarchitecture.  Год назад

      Thanks Byron I am definitely going to do that. You are the second person recommending that change. Maximum Respect Sir.

  • @andreharris2931
    @andreharris2931 Год назад +1

    Like the front elevation

  • @kamaumarcus337
    @kamaumarcus337 Год назад +1

    Another great proposal love the design however I would suggest where you have the wash room to put the powder room and part of the back porch to put the wash room instead just to keep the sheared bathroom private as it seems there is enough space and more functionable nuff respect

  • @MrNanah38
    @MrNanah38 6 месяцев назад +1

    love your videos , I have one question, you mention that this house will cost about 30 mill, what do you think it would cost me to build 3000 sQft with slab roof modern design two story?

    • @jkengineeringarchitecture.
      @jkengineeringarchitecture.  6 месяцев назад

      @ approximately $13,000/ Square Feet, 3000SQFT Would be $39 Mil, you call it $40MILL.

  • @d.p.3612
    @d.p.3612 Год назад +1

    Excellent video. I do enjoy your content. How long does it take the parish council to approve drawing for residential developments, particularly in Kingston?

    • @jkengineeringarchitecture.
      @jkengineeringarchitecture.  Год назад +1

      It varies, it can range anywhere between 6 to 12 weeks. Sometimes it could be longer.

    • @d.p.3612
      @d.p.3612 Год назад

      @@jkengineeringarchitecture. Thank you.

  • @jaunbonaysmith
    @jaunbonaysmith Год назад

    I ❤ the design
    Please explain I'm a bit confused... the 21 Mil will be the cost for the Drawing or to Build the house ??

    • @jkengineeringarchitecture.
      @jkengineeringarchitecture.  Год назад +1

      To construct the building. Not to do the building plan.

    • @jaunbonaysmith
      @jaunbonaysmith Год назад

      @@jkengineeringarchitecture. Ok thanks🙏

    • @jaunbonaysmith
      @jaunbonaysmith Год назад

      @@jkengineeringarchitecture. Funny enough nht selling their 1bedroom 1bath for 12 Mil 🙃

  • @pepe.washington
    @pepe.washington Год назад +1

    Whats the going rate per sqft to design a floor plan?

    • @jkengineeringarchitecture.
      @jkengineeringarchitecture.  Год назад

      It depends on the person who is doing the drawings. There are special rate , but some registered architect will charge a percentage of the building cost.

  • @romariothompson2894
    @romariothompson2894 Год назад

    what software you used to draw the 3d

  • @narchalia
    @narchalia Год назад

    Also the steps at the back porch should be rectamgular