सरकार इतना बढ़िया रोड बनाती है ताकि कारों और ट्रकों को आवाजाही में परेशानी ना हो, और कुछ बेवकूफ लोग हाइवे से लगी भूमि में प्लाटिंग करके घर बनाना चालू कर देते हैं। बहुत दुख होता है देख के।
Wow didn't knew about this highway, will be gamechanger as connectivity is poor in this region. Hope work also on in Jharkhand, do share progress report of JH too.
Please make sure to mention that Bilaspur-Raipur section is not access controlled at all. Leave expressway, that section is not even fit to be of normal national highway standards. Nice drone shots though
Brother wo Rest area ke sath service area bhi hai, Rest & Service area. Uske lie alag se contract nikalta hai I guess, Aur may be NHAI Control karti hogi usko. Not sure about it.
Personally Mughe ye road itna pasand nahi hai. Kyu ki drive qualify itni achi nahi hoti hai compared to bitumin road. But yes gadhe to itni jaldi nahi hote hai. Crack aane ke chances rehte hai.
Video k starting me hi maine jo Interchange k bare me baat kiya hu, Jaha se Korba wali Road cross ho rahi hai, Wahi se Exit leke Katghora k side ja sakte hain.
sir National Highway 130 [Simga - Ambikapur] jo simga se katghora tak 4 lane bn chuka hai aur katghora se Ambikapur tak jo recently 2 lane ban ke ready ho chuka hai iss 2 lane wale section ko gadkari ji ne 4 lane mein dubara banane ki manjuri de di hai uspe ek pura detailed video banaiye pls
Jharsuguda kyu aaega brother, wo to koi Route hi nahi hai Dhanbad ke lie. Existing highway may be ho sakta hai, But agar Expressway bana rahe hai to Mostly Straight sur shortest route pe banaya jata hai. Ye Bilaspur ke baad Korba, Pathalgaon, Kunkuri, Gumla Fir Ranchi & Dhanbad. Raigarh aur Jharsuguda to bahut dur hai in sabhi locations se.
Mil gaya, raigarh se dharmjaygarh se join krna hoga ye highway k liye. Abhi mujhe ek saal me 3-4 round jana hota hai. Mai Jharsuguda se simdega fir ranchi gola ho ke dhanbad pahuchta hu.
भैया रोड के हिसाब से टोल प्लाजा को ओर बड़ा बनाना चाहिए था,,,, सभी टोल को🤔?,, हमारे यहां मुंगेली से 8 KM Ke दूरी मे ही टोल बना हैं मुंगेली To बिलासपुर रोड NH130A दो लेन का रोड हैं,,, और टोल प्लाजा मे 8 लेन बना हैं,,,,, जब दो लेन मे 8 लेन का टोल हो सकता हैं तो 4 To 6 Lane में भी 12 या 16 लेन का होना चाहिए था 🤔🤔 आपका क्या कहना हैं ???
Baat to bilkul sahi hai aapki. Toll kam to hai. Main entry toll bhi bhut chota hai. Pata nahi kya soch k aisa banaye hai. Kabhi ek sath 15-20 gadi aa jae to jam to lagega hi.
सिर्फ 2 लेन इससे क्या होगा?एक लेन ट्रक वाले रिर्जव कर लेते हैं एक से स्पीड कितनी मेंटेन होगी। न ही भविष्य में लेन ऐड करने के लिए जमीन छोड़ी गई हैं बहुत गलत डिजाइन।
Apke baat bilkul sahi hai, desh ki halat aisi hai, Road mil raha hai ye badi baat hai. Issi me khush rahie. Aur yahi to time pe ban nahi pa raha hai. Aage kya Ummid kar sakte hain.
इस डबल इंजन सरकार के पास हमारे बसना विधानसभा और सारईपाली विधानसभा के लिए कोई प्रोजेक्ट है या नई ना हमारे छेत्र को रेलवे मिला ना हायवे मिला जबकि यहाँ सांसद बीजेपी की है विधायक बीजेपी की है
गुगल से जानकारी ले के भोले भाले जनता को मुर्ख बनाना बंद करो किस आधार पे बोल रहे हो लीलागर नदी रायगढ़ जिले में बहती है जहां जाते हो पढे लिखे लोग से पुछ लिया करो ये कौन सा जिला है
सरकार इतना बढ़िया रोड बनाती है ताकि कारों और ट्रकों को आवाजाही में परेशानी ना हो, और कुछ बेवकूफ लोग हाइवे से लगी भूमि में प्लाटिंग करके घर बनाना चालू कर देते हैं। बहुत दुख होता है देख के।
Wonderful you are our star form southern and eastern areas development of expressways
Thank You ☺️ For the kind words.
वीडियो अच्छी और जानकारी से भरपूर
🤩🤩 Thank You
nice drone shot and update keep it up!!! 😄
Glad you liked it! 😄
Excellent covering by Drone
Thanks
Thank You ☺️
Nice coverage once again Mr. Life on wheels. Keep it up. 👍
Thank You ☺️
Very appreciative work...
Glad you liked it 😊
Bahut samay pashachat dekhen ko mila ❤❤ thanks bhai
Welcome 🤗 Brother
बहुत ही सुन्दर और सटीक जानकारी दी है भैया उरगा से आगे का भी अपडेट करें प्लीज़
Thank you dear, Puri koshish karunga jaldi update de Saku..
बहुत सुन्दर, ऐसा लगा कि आप खुद ड्रोन पर बैठकर ही कमेंट्री कर रहे हैं, बहुत अच्छा प्रयास, निर्माणाधीन कार्य के बारे में बताने के लिए. ❤
Thank You ☺️ So much dear
Sir ji urga to pathalgaon ka video kab aayega bhut din ho gye
@ January me aaega brother for sure ♥️
Excellent 👏
Thank You ☺️
Splendid video Laden with information !
Glad you liked it! 😊
बहुत सुन्दर प्रस्तुति ❤
देखने के लिए धन्यवाद
Wow didn't knew about this highway, will be gamechanger as connectivity is poor in this region. Hope work also on in Jharkhand, do share progress report of JH too.
Yes, this project is going to be a huge boost for this region. Will be visiting the Jharkhand portion soon.
What a super job ❤❤❤
Nice information 🎉🎉🎉
Thank You ☺️ Dear
Excellent as always....
Thank You 🤩
Superb sir ❤❤
Thank You ☺️ Dear
बहुत बढ़िया सर जी❤🎉
Thank you dear..
Thanks for information
Welcome 🤗
Superbbb Video ...great work❤
thank you so much dear
Thanks bhaiya ham sab ki request par video banane ke liye and bahut hi badhiya video ❤
Welcome brother..
Nice 🎉🎉🎉
Thank You ☺️
Nice 👍 bhai aap Jay video ka intezar rehata hai❤❤
Thank You Dear 😊
भैया झारखंड में दिखाइए यह रोड का अपडेट
Jarur koshish karenge brother 😊
👌👌
Thank you ..
भगवान भरोसे। बहुत धीरे काम हो रहा है।
Bhaiya urga se dharamjaygarh tak ka update dijiye😊
Koshish jaari hai brother. Jaldi visit karunga
❤️LOVE YOU ALL RUclips FAMILY❤️🥰🥰 Keep Support
Great coverage 👍
Pls cover full road update upto dhanbad
Sure brother, will try to cover the whole stretch soon 😊
Great work by camera ❤
Thank You ☺️
You are doing awesome work ❤❤. Great editing and animation ❤.
Thank You ☺️ Dear
Please update from urga to pathalgoan. If possible upto dhanbad
Surely I will try my best..
Nice drone shots...please update about jharkhand part too..❤❤❤❤
Surely I will try to visit Jharkhand ASAP.
👌👌👌👌👏👏👏
sir , kafi badhiya laga, Drone kon sa use kiye hai
Thank you dear, Dii Air3 Use kiya hu.
Kharagpur Vishakhapatnam expressway ka kya scene hai?
Isme abhi bahut time lagne wala hai. Company bhi final nahi hua hai kaun sa area kaun banaega. Route bhi confirm nahi hua hai. Lamba Process hai.
Please make sure to mention that Bilaspur-Raipur section is not access controlled at all. Leave expressway, that section is not even fit to be of normal national highway standards.
Nice drone shots though
Yeah that’s true. I will mention in next update. Thanx 🤩
Are you from chhattisgarh
@ I stay in Chhattisgarh 😁
@@LifeOnWheelsBSP I was asking to the person who made the comment
@@Akhlesoni Ohhhh
Rest area. Me petrol pump ⛽ kaise khol sakte hai
Brother wo Rest area ke sath service area bhi hai, Rest & Service area. Uske lie alag se contract nikalta hai I guess, Aur may be NHAI Control karti hogi usko. Not sure about it.
Two wheelers and bikes are not allowed in this expressway. I have talked with contractors .
Thanx for the information ℹ️
सर अगले वीडियो पत्थलगांव लाइए प्लीज 🙏🙏🙏🙏
Confirm to nahi bol sakta hu brother. But video aaega jaldi I promise
@LifeOnWheelsBSP Ha
@LifeOnWheelsBSP ok
Sir urga pathalgaon ka bhi video banaiye
Jarur jaldi banaenge
Thumbnail oustanding hai 🎉🎉
Thank You Dear 😘
Dhanbad side progress dikhaye
यह भारतमाला प्रोजेक्ट बिलासपुर शहर के लालखदान से धनबाद तक बनायी जा रही है. . . ना कि रायपुर से।
Jharkhand section ka v dikhaye
Koshsih Jari hai, Jaldi visit karunga Jharkhand section bhi.
Pathalgaon kunkuri ka 1 mahine m company decide hone wla tha jankari dijiega
Jarur koshish karenge..
Bahut time se apki video dekh rha hu.👌 Aap kaha se hai?
Bihar se hu dear
By when can we expect this expressway to be completed? What's the total distance between raipur to Ranchi.
Tell more about entry and exit points.
Because people are anxious about it.
I will try to explain about it as much as possible
सर आप पथलगाव से आगे किस ओर रोड जा रही इस पर रोड की वीडियो update कीजये न....
Jarur jaldi karenge.
bitumen ya concrete road hai ?
Concrete Road hai.
डोंगरगढ़ कवर्धा कटघोरा मुंगेली बिलासपुर,,,रेल लाइन दिखाओ न भईया जी ❤️❤️❤️❤️
urga pathalgaon section ka video plz
Sure we will cover soon 😄
bhai ek baat batao ye roads ki quality maintain rehti hai ki ye bhi baarsih ke baad kharab ho jate hai?
Personally Mughe ye road itna pasand nahi hai. Kyu ki drive qualify itni achi nahi hoti hai compared to bitumin road. But yes gadhe to itni jaldi nahi hote hai. Crack aane ke chances rehte hai.
kabhi jharkhand taraf waley hissey ko bhi dikhaiye
Bilkul dikhaenge dear.
Nhai ko side wali land ko mid mai rakhna tha otherwise near future mai expend karenge toh problem hpgi
Another expressway from kharagpur to vizag is soon going to start
@@chandanmishra8211 is it true?
@@ashishhembram21yes Google it
Yeah, I heard about it. Hope it will start soon 😄
It's expected to start construction in 2027 ...😂so it's long wait
@ Absolutely 💯.
Sir dharamjaigarh bhi laiiye
urga dharamjaigarh ka bnaiye
Jarur December me try karenge
Urga patthalgaon section me padta hai mera gaon CHACHIYA
dawan nadi se aage patthalgaon side me
Mere gaon ko ye road do hisso me devide kr de rha hai
Bhaiya urga se katghora ke liye kha se highway jayegi kuch btao
Video k starting me hi maine jo Interchange k bare me baat kiya hu, Jaha se Korba wali Road cross ho rahi hai, Wahi se Exit leke Katghora k side ja sakte hain.
Bro bokaro jharkhand taraf kab se kaam start hoga please bataiye
Sry brother iske bare me abhi jankari nahi hai mere pass. Kuch information milega to share karunga.
sir National Highway 130 [Simga - Ambikapur] jo simga se katghora tak 4 lane bn chuka hai aur katghora se Ambikapur tak jo recently 2 lane ban ke ready ho chuka hai iss 2 lane wale section ko gadkari ji ne 4 lane mein dubara banane ki manjuri de di hai uspe ek pura detailed video banaiye pls
Jarur
What about dharamjaigarh?😊
I will try go figure out soon
Dhamtari railway k ky ho rah h
Pta karenge kal
Dil petrol kaha dalvayege sir😢
Rest & Service area me banega Petrol Pump ⛽
Raipur to hyderabad express way ka update?
Abhi to koi update nahi hai brother
इसमें ढाबा एलाऊ रहेगा या नहीं ।
Mushkil hai. Restaurant banega wo bhi selected location pe.
Access control expressway h 90% nhi
Ye concrete expressway hai kya?
Yup 😊 Concrete hi hai
Urga to Dharamjaigarh ka ky progress hai bhaiya
Koshish karunga jaldi update de saku Urga se aage ka.
Konasi company kam kar rahi hai
@ Kisme. Bilaspur Urga - GR INFRA, Urga-Pathalgaon - DBL
Road bne ya na bne toll to ready hi rhega. Fir gov bolegi k road hmne bnaya
WE NEED MINIMUM 1LAKH KM MULTIMODAL MULTILATRAL EXPRESS WAY IN NEXT 5 YEAR IF WE WANT TO BE SUPER POWER UP TO 2047
Jharkhand ka project dikhaye sir
Jarur brother 😊
Support
Music link send karo Bhaiya...
Kaun sa Music ka link chahiye brother, Multiple music use kiya hai maine.
Sorry but raipur se ranchi tak ban gaya hai kya road?
Nahi abhi to nahi bana hai. Raipur to Bilaspur bana hai, Uske aage abhi kaam chal hi raha hai. Koi bhi area complete nahi hua hai.
@LifeOnWheelsBSP acha thanku sir wese ap quality content dal te hai
@ Thank You ☺️ Dear
Raigarh se ja rahe ho dhanbad toh entry kaha se krna hoga is highway pe ?
Raigadh to nahi aa raha hai iske alignment me.
@@LifeOnWheelsBSP Jharsuguda bhi nhi aayega kya ?
Jharsuguda kyu aaega brother, wo to koi Route hi nahi hai Dhanbad ke lie. Existing highway may be ho sakta hai, But agar Expressway bana rahe hai to Mostly Straight sur shortest route pe banaya jata hai. Ye Bilaspur ke baad Korba, Pathalgaon, Kunkuri, Gumla Fir Ranchi & Dhanbad. Raigarh aur Jharsuguda to bahut dur hai in sabhi locations se.
Mil gaya, raigarh se dharmjaygarh se join krna hoga ye highway k liye.
Abhi mujhe ek saal me 3-4 round jana hota hai.
Mai Jharsuguda se simdega fir ranchi gola ho ke dhanbad pahuchta hu.
@ Ohhhh. Ye highway ban jaega to badhiya ho jaega apke lie.
bus stop me enter kaise krenge
Bada Sawal Hai
@LifeOnWheelsBSP peeche stairs laga dete
@ Kuch na kuch to jugad hoga uska.
Yaha Highways me jamin koi sell kar raha hai kya
भैया रोड के हिसाब से टोल प्लाजा को ओर बड़ा बनाना चाहिए था,,,, सभी टोल को🤔?,, हमारे यहां मुंगेली से 8 KM Ke दूरी मे ही टोल बना हैं मुंगेली To बिलासपुर रोड NH130A दो लेन का रोड हैं,,, और टोल प्लाजा मे 8 लेन बना हैं,,,,, जब दो लेन मे 8 लेन का टोल हो सकता हैं तो 4 To 6 Lane में भी 12 या 16 लेन का होना चाहिए था 🤔🤔 आपका क्या कहना हैं ???
Baat to bilkul sahi hai aapki. Toll kam to hai. Main entry toll bhi bhut chota hai. Pata nahi kya soch k aisa banaye hai. Kabhi ek sath 15-20 gadi aa jae to jam to lagega hi.
लीलागर नदी रायगढ़ जिले में flow नहीं करती मित्र
Ji baad me pata chala mujhe, Thank you for the information.
रोड तो बन गया लेकिन जिन गरीब आदमियों की जमीन इन highway मे निकला है वो दर दर भटक रहे मुआवज़े के लिए उनका क्या .???
गडकरी जी ने 20000 करोड़ रुपए कि मंजूरी दी है इसका भी maps के माध्यम से समझाते हुए video बनाया जा सकता है Sir
Bilkul sahi kaha apne. Koshish karta hu
@@LifeOnWheelsBSPbhilai 03 and kushi par ka fly over ka kuch update hai
@ Agar aap un bridge ki baat jar rahe hai jo news me aaya tha ki banega to iska koi update nahi aaya hai. Pata nahi kab banega wo.
@@LifeOnWheelsBSP yes
कॉन्क्रीट के रोड के ऊपर डामरीकरण करना चाहिए जिससे रोड में गाड़ी स्मूथ चलता है और रोड सुंदर भी दिखता है । ये सीसी रोड बेकार लगता है।
Baat to aapki sahi hai, lakin abb jo hai yahi hai. Kya kar sakte hain.
CC Road life is more than BT Road Friend
Dhramjaygarh to pathalgaon
Coming Soon;.
Jharkhand ka update dekho
Koshish karenge jaldi visit kar saku.
70 km me 3 tol plaza
सिर्फ 2 लेन इससे क्या होगा?एक लेन ट्रक वाले रिर्जव कर लेते हैं एक से स्पीड कितनी मेंटेन होगी।
न ही भविष्य में लेन ऐड करने के लिए जमीन छोड़ी गई हैं
बहुत गलत डिजाइन।
Apke baat bilkul sahi hai, desh ki halat aisi hai, Road mil raha hai ye badi baat hai. Issi me khush rahie. Aur yahi to time pe ban nahi pa raha hai. Aage kya Ummid kar sakte hain.
Lilagar ki information Galt hai ye korba ke pahado se nikl ke mahanadi me sivrinarayan ke pehele Janjgir jila me hi milti hai 😮😮😮😮😮
Thanx for the information ℹ️. Wikipedia me information galat hai. Sry for the mistakes
इस डबल इंजन सरकार के पास हमारे बसना विधानसभा और सारईपाली विधानसभा के लिए कोई प्रोजेक्ट है या नई ना हमारे छेत्र को रेलवे मिला ना हायवे मिला जबकि यहाँ सांसद बीजेपी की है विधायक बीजेपी की है
Pahle ambikapur bilaspur ka road to ban jaye 6saal se ban raha hai
Usse pehle ye ban jaega.
गुगल से जानकारी ले के भोले भाले जनता को मुर्ख बनाना बंद करो
किस आधार पे बोल रहे हो लीलागर नदी रायगढ़ जिले में बहती है
जहां जाते हो पढे लिखे लोग से पुछ लिया करो ये कौन सा जिला है
Ji thankyou for the suggestion. BTW ye jankari wikipedia pe available hai.
विकीपीडिया की जानकारी आधी सही होती है आधी गलत
@ Ji Sahi kaha apne. Koi baat nahi dhyan rakhenge next time.
Har 50 km par toll tex rahega 😂
Ha woto hai
उरगा से पत्थलगांव का वीडियो बनाइये
Kuch log vikas me bada dalne ka kam krte h...road nhi bnane doge to develop kese hoga bhai
Itne lambe video bhi koi kaam ka nahi..itna lamba video bana to pura pata chalna chahiye kaha se kaha ban raha
mai dhanbad se hi.... Rapur bahut bekar city hai.... un developed
@@deshi-videos bhai Chhattisgarh se bahut piche h Jharkhand
Google search kr lo ek bar
😂😂😂😂