Terrace Brickbat Waterproofing | Terrace waterproofing part 2
HTML-код
- Опубликовано: 7 фев 2025
- Learn the comprehensive methodology for terrace brickbat waterproofing, compliant with Indian Standard (IS) codes. Protect your terrace from water damage with this step-by-step guide.
Step 1: Surface Preparation
Cleaning and preparation for the cementitous layer ( cement : sand ) 1:4 we can also add a waterproofing compound with mortar of ratio 200ml for 1 bag cement.
Reference: IS 16492:2016
Step 2: Lay Brickbat Layer
Lay the brickbat on the mortar prepared in the first step with a gap of 15 to 20 mm according to the level marked and provided.
Reference: IS 16557:2016
Step 3: Apply Cement Mortar
This will fill all the gaps of bricks, this will be done after 2 to 3 days of doing brickbat work so brickbat doesn't observe water of mortar that can create cracks.
Step 4: Finish with Cement Plaster
This will be the finish layer of brickbat waterproofing work for the terrace.
Reference: IS 15477:2004
#TerraceWaterproofing
#WaterproofingTips
#HomeMaintenance
#LeakProofing
#ConstructionTips
#BuildingRepair
#WaterproofingSolutions
#TerraceProtection
#HomeImprovement
#DIYWaterproofing
#WaterproofingTutorial
#ConstructionGuide
#BuildingTips
#HomeRepair
#WaterproofingExpert