Close well Gas Migration. How to control BHP during migration.

Поделиться
HTML-код
  • Опубликовано: 25 ноя 2024

Комментарии • 23

  • @beverlybastian5741
    @beverlybastian5741 2 года назад +1

    Good video & explanation keep up the good work. Hope to see some more videos & explanation in the future.

  • @jadm2257
    @jadm2257 3 года назад +1

    Good explanation.sir

  • @s_tv2312
    @s_tv2312 3 года назад

    Beautifully explained

  • @JessieRutherford-y5i
    @JessieRutherford-y5i Год назад +1

    I am a new control instructor and your videos are awesome they help me so much do u have a video on the working window difference between formation psi and fracture psi

    • @AjayVermaErigworld
      @AjayVermaErigworld  Год назад

      Thanks for appreciating my work but im sorry this time I don’t have such video but i will record this topic as its in my list.

  • @ismailgarba1212
    @ismailgarba1212 2 года назад

    Thank you so much sir and weldone.
    But what about when drilling is done...during production, and there is a bubble at the middle of a drilled hole and then its closed at the top.
    What happens to the bubble and pressure readings.

  • @andrixhernandez1323
    @andrixhernandez1323 3 месяца назад

    My dear sir, I wachted trainning vídeo with wait and weight method where the co- man told to driller keeping constant the casing pressure while I get ready the kill sheet! Regarding your explanation then that was a mistake? Because you are explaining we. Have to keep the sidpp!

  • @priyankaverma1942
    @priyankaverma1942 4 года назад

    👍👍

  • @baraiyabhumin130
    @baraiyabhumin130 4 года назад +1

    hello sir,
    suppose we have taken a kick higher then the calculated kick tolerance value, then how we can kill the well?
    because if we use simple drillers method and wait and weight method then the formation below the casing shoe will get fracture before kick enters into the cased hole.

    • @AjayVermaErigworld
      @AjayVermaErigworld  4 года назад +2

      Baraiya Bhumin hi
      In that case we had to do bull heading method its also called non circulating method. In this method we bull head the formation fluid back to formation by pumping from surface.

    • @baraiyabhumin130
      @baraiyabhumin130 4 года назад

      @@AjayVermaErigworld thanks for quick response sir, what if during bull heading we fracture the formation....
      actually i read in a manual that they use low chock pressure method but i don't know about that so please if you can explain it briefly.

    • @zeeshankhan-mb1jg
      @zeeshankhan-mb1jg 3 года назад

      When May You Consider Using the Bullheading Well Control Method?
      When the kick size is very big so you may not be able to control the excessive volume coming to the surface.
      When you need to reduce surface pressure in order to start further well control operations.
      When there is a possibility to exceed surface pressure and volume gas on the surface if the conventional methods (drillers’ method, wait and weight and volumetric) are performed.
      When there is no pipe in the hole while taking influx.
      The influx contains high level of H2S which can cause safety of personnel on the rig.
      When there is no feasible way to strip back to the bottom in order to kill in the flux below.

    • @AjayVermaErigworld
      @AjayVermaErigworld  3 года назад

      Then low choke pr killing method can be applied. Or bullheading can be done if conditions allowed

  • @kamleshshukla1566
    @kamleshshukla1566 3 года назад +1

    Sir please explane about BHP

    • @AjayVermaErigworld
      @AjayVermaErigworld  3 года назад +1

      Pls chk my videos i have BHP video both for static and circulation Bhp

    • @AjayVermaErigworld
      @AjayVermaErigworld  3 года назад +1

      Pls chk this link
      ruclips.net/video/qNpamXRg9es/видео.html

  • @nouyepwilliam5638
    @nouyepwilliam5638 2 года назад

    Dear sir please our do get influx wet thanks .. cyrille from Cameroon west Africa

  • @felipebenjaminpachecovalde4421
    @felipebenjaminpachecovalde4421 2 года назад

    why 2.15 ppg?

  • @yadavdharmendra1819
    @yadavdharmendra1819 8 месяцев назад

    Why 2.15 ppg?

    • @orangiseng6639
      @orangiseng6639 2 месяца назад

      he explained in response someone's else question below...