Hi Sir, S7-1200 PLC CPU1214C has 06 Nos. HSC for Single Phase, Counting Operation. If I need 10 nos, How to add the Additional 04 Nos? What Module or Signal Board I should use?
This HSC(high speed counter) read pulses right? does that mean the 1200 cpu receives fast pulses as input when hsc is enabled? thanks in advance...... I'm just checkinn because I'm about to program a pulse reader for a bill acceptor (APEX5000) on a pulse mode.
Hi there, In a ladder diagram. It already have two high speed counters. What does it mean by DIR, PERIOD, NEW_PERIOD, NEW_DIR, NEW_CV, NEW_RV, BUSY AND STATUS?
Thanks for your help, I manageded to get my counter going with interupts used to reset it at precise intervals
Nice explanation sir, Thank you
Thank you very much for the Video! Now i know how to link the Hardwarecounter to the Programm.
Great video, thanks you for your instruction!
thank you engineer ali .. u r awesome
It is wonderfull sharing ,thanks al ot
Hi sir thank you for the video ,
very very good eng Ali Al-Mukhtar
Thank you for this upload
Hi Sir,
S7-1200 PLC CPU1214C has 06 Nos. HSC for Single Phase, Counting Operation.
If I need 10 nos, How to add the Additional 04 Nos? What Module or Signal Board I should use?
good , thank Ali
I still don t understand m100.0 how it works ? In a copy of your program this memory not activate at all !
Hello Ali,
Do you know how to convert the HSC counts into speed?
This HSC(high speed counter) read pulses right? does that mean the 1200 cpu receives fast pulses as input when hsc is enabled? thanks in advance...... I'm just checkinn because I'm about to program a pulse reader for a bill acceptor (APEX5000) on a pulse mode.
Hello how can I calculate the speed of a motor by using this ? Does Timer_ET is counting the time between each cycle ?
Which Digital Inputs are used as counter? I mean if I use 6 digital input port what will be the address?
is it possible to share length cutter project OR some information about The Programming of this project
does my plc S7 200 required high speed input ports for connecting the encoder?
Hi there,
In a ladder diagram. It already have two high speed counters. What does it mean by DIR, PERIOD, NEW_PERIOD, NEW_DIR, NEW_CV, NEW_RV, BUSY AND STATUS?
The easy answer is Check the manual, because that is what I will do to answer your question