Luas Cross City - Red Line Tie In - Marlborough St / Abbey St junction

Поделиться
HTML-код
  • Опубликовано: 22 дек 2024

Комментарии • 8

  • @timexironman100m
    @timexironman100m 5 лет назад +3

    Amazing the amount of prep and construction that went into that one point on the line..apart from the presence of wet cement drying the whole time laspe shows it never rained once which is kinda odd for dublin let alone the country...where ee get lots of rsin...greaf video.

  • @johngill
    @johngill 7 лет назад +3

    Brilliant, great work by everybody involved

  • @stephencorbally.9394
    @stephencorbally.9394 7 лет назад +1

    That was something else. Love it. Wow!!😨

  • @elainesanfey
    @elainesanfey 8 лет назад +2

    Fascinating...and only a little horrifying! ;)

  • @johnnytyrrell7060
    @johnnytyrrell7060 6 лет назад +1

    I worked on the two other line's and the port tunnel pumping the concrete wish I had of worked on this job aswell its the only job I have not worked on I did the bridges on the M50 too

  • @kalpeshwani8520
    @kalpeshwani8520 3 года назад

    Heavy-duty circular conduit will be better at basement with tappings..⚙️🌀 horizontal... +& 🌊 vertical drain , utility ,tram .
    Heavy duty removable slabs for upper surface...
    Simple for use simple for repair & replacements

  • @vagodroch6980
    @vagodroch6980 5 лет назад

    В России это бы делали 3 года и стоило бы это в 5 раз дороже!

  • @yoshiwaka9843
    @yoshiwaka9843 4 года назад

    日本とはだいぶ違うね、レールの交換はどうやるの?