Amazing the amount of prep and construction that went into that one point on the line..apart from the presence of wet cement drying the whole time laspe shows it never rained once which is kinda odd for dublin let alone the country...where ee get lots of rsin...greaf video.
I worked on the two other line's and the port tunnel pumping the concrete wish I had of worked on this job aswell its the only job I have not worked on I did the bridges on the M50 too
Heavy-duty circular conduit will be better at basement with tappings..⚙️🌀 horizontal... +& 🌊 vertical drain , utility ,tram . Heavy duty removable slabs for upper surface... Simple for use simple for repair & replacements
Amazing the amount of prep and construction that went into that one point on the line..apart from the presence of wet cement drying the whole time laspe shows it never rained once which is kinda odd for dublin let alone the country...where ee get lots of rsin...greaf video.
Brilliant, great work by everybody involved
That was something else. Love it. Wow!!😨
Fascinating...and only a little horrifying! ;)
I worked on the two other line's and the port tunnel pumping the concrete wish I had of worked on this job aswell its the only job I have not worked on I did the bridges on the M50 too
Heavy-duty circular conduit will be better at basement with tappings..⚙️🌀 horizontal... +& 🌊 vertical drain , utility ,tram .
Heavy duty removable slabs for upper surface...
Simple for use simple for repair & replacements
В России это бы делали 3 года и стоило бы это в 5 раз дороже!
日本とはだいぶ違うね、レールの交換はどうやるの?