Six Flags Great America Wrath Of Rakshasa Construction Update #5

Поделиться
HTML-код
  • Опубликовано: 24 ноя 2024

Комментарии • 21

  • @fireicemetal
    @fireicemetal 2 месяца назад

    Those are pipes for the piers they will be drilling in the coming weeks. Drilling is often the first and foremost step when putting in a rollercoaster (steel one that is) they'll be drilling soon 70-80ft deep hammering in the corrugated pipe, rigging the rebar down in the hole and pouring. I know for max force they had about 10-12 concrete trucks onsite ready to start pouring, not sure if this will require more or less concrete. For sure now scattered throughout the park considering the new layout, can't wait to see it progress!!

  • @NRGFLOGaming
    @NRGFLOGaming 2 месяца назад +6

    Great video!!! I think I know what those round metal tubes are.
    They are forms to hold in the cement for the footers.
    They will be placed into the deep holes dug into the ground for the footers and rebar will be welded inside of these round forms before the cement is poured into each footer. They help the footers keep their round shape in the end. If you look closely at other B&M footers on our other B&M coasters you can see these metal casings around the cement.
    The construction area is really opening up and it looks a little bigger with all the trees that have been removed!!!
    I can't wait to see more from you!!!
    Keep it up!!!!
    NRG-FLO Gaming - a.k.a. (TwistedSTEEL666)
    ;)

    • @marcussorenson3380
      @marcussorenson3380 2 месяца назад +1

      if i'm not mistaken xflight has those medal tubes for it's cement footers right?

    • @NRGFLOGaming
      @NRGFLOGaming 2 месяца назад

      @@marcussorenson3380 Yes

    • @fireicemetal
      @fireicemetal 2 месяца назад +1

      You got it almost right but not quite!
      They are pipes for the piers they will be drilling in the coming weeks. Drilling is often the first and foremost step when putting in a rollercoaster (steel one that is) they'll be drilling soon 70-80ft deep hammering or drilling in the corrugated pipe, rigging the rebar down in the hole and pouring. I know for max force they had about 10-12 concrete trucks onsite ready to start pouring, not sure if this will require more or less concrete. For sure now scattered throughout the park considering the new layout, can't wait to see it progress!!

  • @zgihi
    @zgihi 2 месяца назад +4

    As a certified FAA drone operator, it is 100% legal to fly over someone's property as long as you are not impeding on their operations. Since you are doing the flying while they are closed, you can fly anywhere in the park as long as you are not launching the drone on their property.

    • @phillymcv1237
      @phillymcv1237 2 месяца назад

      as someone who doesn't want drones on their property, don't be surprised if it doesn't come back lol

    • @zgihi
      @zgihi 2 месяца назад

      @@phillymcv1237 Thats very true. I don't support the FAA regulation for this and believe in stand your ground. But people have gotten in major trouble for taking down drowns flying over their property.

  • @srellessemaj
    @srellessemaj 2 месяца назад +2

    Thanks for the update!

  • @TheClimb-JK
    @TheClimb-JK 2 месяца назад +1

    This park needs more exceptional roller coasters. Right now it has exactly 0

  • @richardwatts9073
    @richardwatts9073 2 месяца назад

    We went Saturday and the demon is officially closed for the season and the cars are put away

  • @damnitbobby1470
    @damnitbobby1470 Месяц назад

    Yesterday they posted pictures of concrete footer caissons

  • @kaylinosprey3306
    @kaylinosprey3306 2 месяца назад

    Looks like those parts in the employee lot are molds for when they pour the support footers.

  • @djs2356
    @djs2356 2 месяца назад +1

    very nice!!!!!!!!!!!

  • @mikemett1038
    @mikemett1038 2 месяца назад +1

    Leaving a👍

  • @greendayyylmao3427
    @greendayyylmao3427 2 месяца назад +1

    the transition at 3:45 had me questioning reality for a second

    • @chicagocoasterguy
      @chicagocoasterguy  2 месяца назад

      @@greendayyylmao3427 LOL
      I was in 4k mode at first and in order to zoom in further I had to stop recording and switch out of 4k and dropped the transition in there

  • @anythingmusicrelated8723
    @anythingmusicrelated8723 2 месяца назад +1

    Still seems hard to believe this site is big enough, just doesn’t look like that much land

    • @gastankbassgtb3894
      @gastankbassgtb3894 2 месяца назад

      Maybe I missed it, but it could cross the service road and use the go kart land. That would give it plenty of space. The go carts are such a waste of space anyway.

    • @chicagocoasterguy
      @chicagocoasterguy  2 месяца назад +1

      I agree 100%! This is going to be so crazy seeing a 189ft tall coaster in this spot basically right over where we will be walking.

    • @chicagocoasterguy
      @chicagocoasterguy  2 месяца назад

      @@gastankbassgtb3894 It's not using the Go Kart's plot and will not cross the service road. Most of the coaster will be in the old Buccaneer plot. This will be a very different dive coaster than we have seen before will the small plot they had to work with. I see this very similar to when Raging Bull was installed. There wasn't room for an out and back so they made the worlds to this days till only Hyper Twister Coaster. Wrath will be similar to that as it will be confined to such a small space it will be weaving in and out of itself it appears.