VALIDATION OF PURIFIED WATER SYSTEM

Поделиться
HTML-код
  • Опубликовано: 24 янв 2025

Комментарии • 36

  • @anand-spiritualquotent5292
    @anand-spiritualquotent5292 5 месяцев назад

    Very good video.. Lot's of learning.. Thanks

  • @pothalasiva1041
    @pothalasiva1041 11 месяцев назад

    Good explanation sir.. thank you sharing Sir..

  • @kunalmistry5856
    @kunalmistry5856 4 года назад +3

    Thank you so much sir for designing such a informative video, it's very useful

  • @prakashpatil846
    @prakashpatil846 Год назад

    Nice presentation in short

  • @minathsolankar
    @minathsolankar 3 года назад

    Thank you very nice information

  • @titonsahashuvo
    @titonsahashuvo 2 года назад

    Wow, it's really great!

  • @k50159
    @k50159 Год назад +1

    Thanks so much

  • @yogeshdoke2483
    @yogeshdoke2483 2 года назад

    nice to understand

  • @bharatbhushansaini2673
    @bharatbhushansaini2673 4 года назад

    Good knowlegble vedio sir

  • @arunkashyap8301
    @arunkashyap8301 4 года назад

    Good work sir

  • @tanujsharma4207
    @tanujsharma4207 4 года назад

    Such a needfull video thankuh Sir

  • @amitkumarshukla3234
    @amitkumarshukla3234 3 года назад

    Nice presentation

  • @AyurPuran
    @AyurPuran 3 года назад

    Dear in phase 2 we can not use water for manufacturing , we can use for only washing purpose ..... revert pls am I right or not ?

    • @easyqualitylearning6790
      @easyqualitylearning6790  3 года назад

      Yes in phase II we can use water for manufacturing as well as washing

    • @AyurPuran
      @AyurPuran 3 года назад

      @@easyqualitylearning6790 ok thanks

  • @arundeep4124
    @arundeep4124 4 года назад

    Good work sir.. it can be more detailed

  • @bhagyalaravikumar7166
    @bhagyalaravikumar7166 3 года назад +1

    Nice sir but in some time u r explanation not clear other wise nice information and very good information and knowledge.

  • @mansouralajeemi9101
    @mansouralajeemi9101 2 года назад

    THANK YOU SO MUCH

  • @angeliei
    @angeliei 4 года назад +1

    Thank you sir
    What if a pharmaceutical industry has stopped working for a period of time? a revalidation of the PW system must be done?

    • @easyqualitylearning6790
      @easyqualitylearning6790  4 года назад +1

      Stoppage need to be evaluated, if all utilities are also stopped including recirculation pump of water system then sanitisation of system and concurrent validation can be done. It will also depend on the shut down duration. Risk assessment will help in this.

    • @easyqualitylearning6790
      @easyqualitylearning6790  4 года назад +1

      If recirculation pump is on then revalidation may not be required, but pump is also closed then concurrent validation can be considered.

    • @angeliei
      @angeliei 4 года назад

      It relies on recirculation pump, then.
      Thank you sir.
      Please, make a video on risk assesment in pharma if you can

    • @easyqualitylearning6790
      @easyqualitylearning6790  4 года назад

      @@angeliei I will try may be after some time

    • @easyqualitylearning6790
      @easyqualitylearning6790  4 года назад

      If content is useful then share with others also

  • @vaibhavshetkar3797
    @vaibhavshetkar3797 2 года назад

    How to make specifications for soft water, ro 1, ro 2, edi while doing performance qualification??

  • @mohdbaseem46
    @mohdbaseem46 10 месяцев назад

    sir we are going to extend our user point of wfi as well as the loop line system , So I was asking that the revalidation activity will start from Phase-1 or Phase 2 ???
    Please give the answer of my question 🙏🏼

    • @easyqualitylearning6790
      @easyqualitylearning6790  10 месяцев назад

      First you need to do requalification of physical parameters and once it is ok then it will start from phase I. Risk assessment is must in this.

  • @shokenderkumar2738
    @shokenderkumar2738 3 года назад

    Sir thankbu so .much

  • @Vikayadavbpharmhhhh
    @Vikayadavbpharmhhhh 4 года назад

    what document required for replace electro deionizer system in purified water system

    • @easyqualitylearning6790
      @easyqualitylearning6790  4 года назад

      Mr. Vishal, I hope you are talking about the EDI unit replacement as a part of breakdown. You need to do the risk assessment of the water system after change in which you will need technical specs. Of old and new EDI module. If the make and model as well technical specs.are same then it reduces your task if it is different it will trigger requalification of the system.

    • @Vikayadavbpharmhhhh
      @Vikayadavbpharmhhhh 4 года назад

      If technical spec of EDI unit is same, then risk assessment is sufficient or any other documents required for EDI replace.

    • @easyqualitylearning6790
      @easyqualitylearning6790  4 года назад +1

      In risk assessment evaluate risk and probably you may have to do analysis of out put after EDI and results need to be compared with earlier results.

  • @mohitkumar-hh2vy
    @mohitkumar-hh2vy 3 года назад

    Vegod sir

  • @CreativeCorner25
    @CreativeCorner25 4 года назад +1

    Sir plz make video on latest WHO and USP guidelines for purified water and system.. parameters online offline linits..like toc conductivity. Frequency of replacement.. flow rate, pressure, temperature,