Solving Problems Involving COMPOSITE BEAMS! (Steel Design)

Поделиться
HTML-код
  • Опубликовано: 11 дек 2024
  • PROBLEM BRIEF:
    To construct the deck of a bridge over a deep ravine, steel beams spaced at certain meters on centers and simply supported on a span of given meters are used to support the construction loads which include temporary formwork and construction live loads. At this stage, only the steel beam carries the loads. After the slab has hardened, sufficient shear connectors welded to the beam flanges provide full composite action of the steel beam with a thick cast-in-place concrete slab. How do we solve for MAXIMUM BENDING STRESS in the beam, MAXIMUM TENSILE STRESS in the beam, and MAXIMUM COMPRESSIVE STRESS in the concrete slab?
    Enroll in GERTC’s ONLINE REVIEW! Details here:
    • DETAILS about GERTC ON...
    ----------------------------------------------
    Enroll in GERTC Review Lite: / @gillesaniaengineering...
    Learn about GERTC Review Lite here: • GERTC Review Lite! Rev...
    FOLLOW US ON FACEBOOK!
    Gillesania Engineering Videos on Facebook: / gillesaniaengineeringv...
    GERTC Review Center: / gillesaniareviewcenter
    OFFICIAL ENGINEERING REVIEW BOOKS SHOP
    Official Website: www.gertcrev.c...
    Facebook: / ditgillesaniabooks

Комментарии • 19