ERMA FIRST BWTS Components Maintenance - TRO Replacement of PCB & Optics Assembly

Поделиться
HTML-код
  • Опубликовано: 10 сен 2024
  • The proper and effective operation and maintenance of your ERMA FIRST BWTS is in your hands. The most important thing after installing and operating a BWTS is knowing how to maintain it. This video will show you how to replace the PCB of the TRO & assemble the Optics step by step.
    For further inquiries please do not hesitate to contact us or visit www.ermafirst.com.
    Make sure to subscribe to our channel by clicking the subscribe button, so that you stay updated with our latest videos!

Комментарии • 3

  • @gmeri
    @gmeri Год назад

    Ballast water sampling in Viet Nam
    GMERI is a unit providing monitoring and analysis services for marine environment samples and waste from ships. We coordinate with national units such as the Institute of Marine Natural Resources and Environment (VAST) to carry out work related to the field of marine resources and the environment.

  • @WharilNapoles-ge9mb
    @WharilNapoles-ge9mb Год назад

    Sir ask lng po ayaw mg turn on n Kraft transformer ng ERMA BWTS nmen , my power nmn ang panel nya kahit anubg pindot ng turn on dintlga sya nag on. Ano po kaya reasons? Salamat po ..more power..😊

  • @aselagunasekera-pu9cm
    @aselagunasekera-pu9cm 4 месяца назад +1

    Your demonstrators hands are covering the action. Get rid of this irritating music which is a distraction and get the demonstrator to speak and slow down if you can. I am an ETO on ship fitted with your equipment