I think there's a mistake in minute 6:45, in the "search book" activity, because you have 2 flows and you can't have the activity initiated unless it receives the tokens from the 2 flows, but it can't have the 2 tokens because they're sequential. I think a merge is needed there. Besides of that, thanks for the video!
Thanks for explaining it briefly. I hope I've come up with the idea of describing the activity diagram as already described and thank you very much sir
I think we need different scenarios for different activities so that you can be more precise and add more details. It would be really hard to present a whole system in a single diagram. An activity diagram is a behavioral diagram and you cant really have all of the behaviors happening at the same time.
@@saimirfan902 Hi brother, you are right. I finally made one referencing the diagram in the below link. We just have to use connectors and separate different scenarios. This is for anyone who is still looking for the answer. www.uml-diagrams.org/online-shopping-uml-activity-diagram-example.html?context=activity-examples
hi, sorry but i have 2 question 1-if i use a fork i have to close it with a join, i can't finish without close? 2-i can collegate a join with a previous fork? (for example in your diagram 3:26 i collegate the arrow after join to previous fork) i have a strange situation on my diagram
I am working on an activity diagram. However, I'm not sure how to make the actions happen concurrently, run parallel to each other (AND) and how to represent either action to happen (OR). When I looked at some examples, I was quite confused when the joint and folk symbols are used in both of these cases. Can anyone help me, please?
Thank you watching my video and nice comment. I will try my best to upload soon another video as per your expectation. Don't forget to like, share, and subscribe my channel.
Join node joins combines two concurrent activities to the next activity. While merge node joins two concurrent activities that were derived from some decision to the next activity
Great thanks from Indonesia. Very good video.. concise and clear.. love it..
Really 😮
Thank you for watching and for the comment.
I think there's a mistake in minute 6:45, in the "search book" activity, because you have 2 flows and you can't have the activity initiated unless it receives the tokens from the 2 flows, but it can't have the 2 tokens because they're sequential. I think a merge is needed there. Besides of that, thanks for the video!
All the places where "join" is used should be replaced by "merge".
Great work. I needed a refresh and this was perfect.
Thank you
I ma From Ethiopia, and i would like to say thanks, you are my teacher of Diagram1
You are most welcome and don't forget to like, share, and subscribe the channel.
hi im too tanks
Thank you sir!!!
you explained it very well and east to understand
Thanks for watching and for the best comment.
Thanks for explaining it briefly. I hope I've come up with the idea of describing the activity diagram as already described and thank you very much sir
Thanks for the comment. Welcome.
Thank you for this very useful video!
Thank you so much friend!
i studied uml part from you . thank you. simple and concise. explanations great.
Thanks for watching and for the positive comment!
Like the way you teach. Thank you!
Glad to hear that! Thank you so much
Thanks from Poland
Thank you from Nepal :)
It's very help full...Thank you!..
Glad to hear that
I have my OOM exam today and this will help me, thanks. 😄
Thank you for the vid!
Thanks a lot Sir. 😃
Thanks for comment. Pls don't forget to like and share the video and subscribe too :)
@@Master2Teach Already done.
you explained a complex topic in the simplest way possible. thanks
Great comment. Thank you
The best ❤️
Really good video.
Describe everything, leave nothing.
Thanks.
Glad you liked it!
Should we represent the whole system in a single diagram or can take scenarios ?
Exactly, Literally, no one on the internet explained that!
I think we need different scenarios for different activities so that you can be more precise and add more details. It would be really hard to present a whole system in a single diagram. An activity diagram is a behavioral diagram and you cant really have all of the behaviors happening at the same time.
@@saimirfan902 Hi brother, you are right. I finally made one referencing the diagram in the below link. We just have to use connectors and separate different scenarios. This is for anyone who is still looking for the answer.
www.uml-diagrams.org/online-shopping-uml-activity-diagram-example.html?context=activity-examples
@@Its_Pritam_ Great Help bro!
Nicely explained!
Thanks for watching and for the positive comment!
THANK YOU for this one
Thank you for the best comment.
Perfect thank you so ❤
good video nice thanku sir xixi
Thanks alot very informative
Thank you for watching and comment. Please share with other as well.
Thank You for the easy learn video
Glad it was helpful! Please don't forget to share the video.
Thank you soo much. Well understood.
Thanks, it helps.
Super explaining...thank you so much...hopping more videoes
Sure 👍
Thank you for the info it is very helpful
Thank you Very much, well understood.
Great it helps.
Good explanation for beginners.
Thanks for watching.
precise.. great...
Thanks for watching and for the positive comment!
Great video to learn !!!!!!!!!!
Thank you 🤗 Pls don't forget to like, share, and subscribe.
thank you so much😇
Superbly explained the activity diagram with an example.
Thank you for watching and best comment.
thank you so much! Nice refresh video with great examples!
Glad it was helpful!
Parabéns achei excelente a explicação!!!
obrigada Thank you so much.
Very nice, Sir. Thankyou!
Welcome
A great little refresher course!
thanks for the video!
Thank you for watching and comment. Hope it help.
Well explained
Thank you.
很好的视频,使我的软件工程旋转
It's help, Thanks.
Glad to hear that
hi, sorry but i have 2 question
1-if i use a fork i have to close it with a join, i can't finish without close?
2-i can collegate a join with a previous fork? (for example in your diagram 3:26 i collegate the arrow after join to previous fork) i have a strange situation on my diagram
Awesome tutorial
Thank you for watching and comment. Hope it help.
very well explained
really good video sir.. thanku
Thnx bro🙏🙏🙏🙏🙏🙏
Thank you !
You're welcome!
Great tutorial
Great!! thanks for watching. Please don't forget to like, share, and subscribe.
Thanks for your video 😍😍
So nice of you. Please don't forget to share.
Great Video
Thankyou for your best explanation. I have got a idea how to draw a an activity diagrame.anyway thankyou sir.
You are most welcome. Don't forget to like, share, and subscribe the channel
Your English sounds funny and cute 😜 Thanks for the video
I hope you enjoyed it, learn something,
Thank you so much
You're most welcome
amazing man thanks
Happy to help
I am working on an activity diagram. However, I'm not sure how to make the actions happen concurrently, run parallel to each other (AND) and how to represent either action to happen (OR). When I looked at some examples, I was quite confused when the joint and folk symbols are used in both of these cases. Can anyone help me, please?
nice circol bro
Thank u 🌹
You’re welcome 😊
Thanks a lot sir wish my professor could teach me well 😢
Is this using Java execution Traces
Awesome sir.
Thanks a ton. Keep watching do Learning.
Awesome Sir
Thank you. Keep watching .
Which tool u use for all this notations please help ?
Thank you..
Thank you.
Can u please do the activity sequence and class diagram for the project Church Management System
Sure, if possible please send me all details. master2teach@gmail.com
how to draw activity diagram for ml models
3:29
very good video but i was expecting that if you use partition in library example
Thank you watching my video and nice comment. I will try my best to upload soon another video as per your expectation. Don't forget to like, share, and subscribe my channel.
I need a activity diagram on topic bank management system plz..sir
And awesome sir🙏
Will upload soon. Thank you so much for watching.
@@Master2Teach ok
❤️👍🙏
Nepali rexa bro good good la
Thank you so much Dai
Nice Video xP
Thanks 😅
What's the difference between join node and merge node?
Join node joins combines two concurrent activities to the next activity. While merge node joins two concurrent activities that were derived from some decision to the next activity
💥
Its wold be better if u left the music🌸
Bro Nepal kun thau bata ho?
can you do activity and sequence diagram for fall detection system
very urgent for me
Thank you for watching video. Please send all details in master2teach@gmail.com.
nice
Thanks
Are you from nepal😆?
:) Yes, I'm. Thank you for watching and comment.
I have a question
It's feels like you are gujarati...😅
Hehe Thanks for comment. Im from Nepal.
Upbeat - straightforward and clear, I like that!
epic ingilys is vary goood uh hai
Thank you very much. Pls don't forget to share with other friend.
hello i need help please Sir
#GameStudio5
my guy
Nepali accent xa ta
Sliit kekw Sliit kekw Sliit kekw
Before 7
印度人 我的超人
isss start
Great!! Thank you for the comment.
Thank you!!
nice
Thanks for watching and for the positive comment!