Physical Server to Azure Migration using Azure Site Recovery

Поделиться
HTML-код
  • Опубликовано: 12 янв 2025

Комментарии • 24

  • @AravindaRao
    @AravindaRao 4 года назад +1

    Loved the way you demonstrated...no unnecessary talks right on the point and very well covered all points 👍👍👍

  • @inusahcodjoe
    @inusahcodjoe Год назад

    You have a great way of lecturing but i would like to suggest if you could include an intro diagrams

  • @ruthcaro6569
    @ruthcaro6569 4 года назад

    Thank you for this comprehensive tutorial video. It's easy to follow.

  • @UGUAGLIOOOONE
    @UGUAGLIOOOONE 4 года назад +1

    to modernize my system i got to migrate my cloud vm to onprem, cloud you do a video about that?

  • @cloudbinrepo
    @cloudbinrepo Год назад

    please make a video on azure site recovery for dr

  • @maheswaranshanmugavelu2715
    @maheswaranshanmugavelu2715 3 года назад

    Excelled high level demo .Thank you

  • @riazahmeddesai7278
    @riazahmeddesai7278 2 года назад

    I have questions regarding conf server.. you have downloaded regd key and congf setup of 2gb..so did you installed on the physical server that need to be migrated? Or on seperate server

  • @abdulwasayjunaid6778
    @abdulwasayjunaid6778 2 года назад

    Hi, I have SQL database running on my machine along with other applications so will it also be migrated to my new server with this method?

  • @swastikkanse3887
    @swastikkanse3887 3 года назад

    use highlighter for better understanding.

  • @Ramakrishnap-cx1df
    @Ramakrishnap-cx1df Год назад

    Can we migrate VM to different tenant using ASR

  • @jasonnolis5445
    @jasonnolis5445 3 года назад

    is 2008 / R2 server supported in this method? Thanks

  • @MuhammadWaqas-gr4gg
    @MuhammadWaqas-gr4gg 2 года назад

    Wonderful lecture Niyas. I have 2 questions:
    1. If we have multiple Physical Servers in On-premise setup then the Regd key and Congf setup will be installed on every server??
    2. This setup/lecture is use for both Migration and actual Failover , i mean for DR purpose as well????

  • @mohamedmydeen9893
    @mohamedmydeen9893 4 года назад

    Once the migration done, can we decom the process server which we installed in on permis ?

    • @itproguide
      @itproguide  4 года назад

      Yes, for migration you can decommission-on-premises process server.

  • @gourishmesta4063
    @gourishmesta4063 4 года назад

    complete migration means , that will remove the VM from OP ? only keep it on AZURE?

    • @itproguide
      @itproguide  4 года назад

      Complete migration means, Azure will consider you have completed the migration, and no more synch beterrn onprem and Azure

  • @chiefmotoma7612
    @chiefmotoma7612 3 года назад

    Hello sir is possible to Google classes from you let me know thanks

  • @cosmicdreams7739
    @cosmicdreams7739 4 года назад

    Wait...I thawt it was amareeka?

  • @noufalcdlm
    @noufalcdlm 4 года назад

    Nice