Rough, overgrown tracks on Mass Coastal Watuppa Branch - 6/2024

Поделиться
HTML-код
  • Опубликовано: 8 июн 2024
  • In this video we follow Mass Coastal train MC-4 down the Watuppa Branch in New Bedford and Dartmouth, MA. With the summer almost here the adjacent brush is now encroaching on the right of way and that is evident in this video. The line was acquired in December 2023 when MC purchased the Bay Colony Railroad . The track is rough from years of minimal maintenance by previous owners Penn Central, Conrail, and CSX who eventually handed off this part of the line to Bay Colony in the early 2000's. BCLR was able to fix up some of the track during their ownership but it was still far off from the level and straight track of the mainlines. MC has begun some trackwork on the line so stay tuned for future updates on their progress.
    New Bedford & North Dartmouth, MA
    6/2024
    Flickr:
    www.flickr.com/photos/1404502...
    Comments? Questions?
    Just leave a note in the comment section and I'll get back to you.
    ©2024 South Coast Rail Videos
  • РазвлеченияРазвлечения

Комментарии • 68

  • @1361057
    @1361057 Месяц назад +15

    Yep, definitely rough! Good job, once again capturing branch line service.

  • @armandoperez7967
    @armandoperez7967 Месяц назад +4

    You really could get seasick on this line! At least it is active and not abandoned.

  • @lynwoodreed9032
    @lynwoodreed9032 Месяц назад +18

    anybody seasick on this trip?

  • @stevebayorgeon9905
    @stevebayorgeon9905 Месяц назад +4

    Great video! I really enjoy the way you cover branchlines in your area. Really like some of the telephoto shots especially the night one. I also appreciate the graphics with location info. Keep up the good work.

  • @heathcliff8624
    @heathcliff8624 Месяц назад +6

    Some great footage.

  • @plymouthrock7282
    @plymouthrock7282 Месяц назад +5

    Another great catch of Mass Coastal

  • @scottfrezza3573
    @scottfrezza3573 Месяц назад +4

    And to think Conrail years ago ran on that track delivering beer to colonial beverage

  • @BSPIVEY100
    @BSPIVEY100 Месяц назад +3

    Just like watching the videos of the ND&W.

  • @erikmcc804
    @erikmcc804 Месяц назад +4

    An awesome catch, thanks. Is this Penn Central 2.0? Lol

  • @hemihead68
    @hemihead68 Месяц назад +1

    great work on all video editing / camera and audio

  • @GreatWhiteZep
    @GreatWhiteZep Месяц назад +5

    This used to be such a vibrant line at one point in time, now it's just fallen into disrepair

  • @My.Trackside.Edventures
    @My.Trackside.Edventures Месяц назад +1

    Rock & roll railroading!

  • @michaelfoster1453
    @michaelfoster1453 Месяц назад +2

    Wing and a Prayer Railroad. If we can't get to ya, nobody else will either. : )

  • @rrad8106
    @rrad8106 Месяц назад +4

    Wow! I got 50-year-old Lionel train track in better condition than that!
    I was wondering how DBS got their shipments! Nice to see active sidings! Wish they would rebuild the one out to Gold Medal Bakery on Bay Road.

  • @dkneuer
    @dkneuer Месяц назад +5

    Very expensive equipment going over this track is nuts.need to replace some ties too get more track stability. Looks like if they went faster,they would tip over from the rocking.

    • @alwhalen3488
      @alwhalen3488 Месяц назад +1

      It's really not as bad as it looks. The BCLR track supervisor there considered it 'ugly track, not bad track'. It does meet FRA Excepted track standards which in reality means that as long as it holds the guage it's ok to use at 10 MPH.

  • @cliffchance347
    @cliffchance347 Месяц назад +5

    Looks like 5MPH track to me 🫰🏼

    • @williamh.jarvis6795
      @williamh.jarvis6795 Месяц назад +2

      Surely, the track appears not much different from that of the Napoleon, Defiance and Western Railroad, in its beginnings of operations. Watch one of the earlier videos of them. (Yeah! I understand that telephotography of railroad tracks will highlight horrendous any track conditions.)
      Supposedly, that track is former Maumee Route trackage and was built across swampland. The ND&W is making headway as to getting their tracks upgraded, little by little, but, with some effort and incentive to thrive.

  • @happyhome41
    @happyhome41 Месяц назад +4

    I’m curious, do “they” send down a gage car ahead of time, to reduce the probability the engine will derail ?

  • @cliffchance347
    @cliffchance347 Месяц назад +5

    Bet that siding switch is frozen shut

  • @Mike-rx4in
    @Mike-rx4in 15 дней назад

    That is definitely a Hooterville!

  • @ericposey1986
    @ericposey1986 Месяц назад +2

    Maybe the new owners will fix the deferred maintenance line and get it up to track speed.

  • @crlaw75
    @crlaw75 Месяц назад

    Neat night shots.

  • @NormanJaquemotRebel
    @NormanJaquemotRebel Месяц назад +4

    It looked like a Maumee and western video. You guys want to become Mass Coastal and western?

  • @thepozfromoz5166
    @thepozfromoz5166 Месяц назад +2

    I believe some track replacement is needed on this stretch of line! If I was the conductor or engineer,I think probably would have to puke at some point! If the old Reed rd. crossing has signals,time to get them working!

    • @alwhalen3488
      @alwhalen3488 Месяц назад +1

      ALL of the crossing signals were working when Bay Colony left. No idea why MC has issues with them.

    • @thepozfromoz5166
      @thepozfromoz5166 Месяц назад

      @@alwhalen3488 yea that's weird! Always liked watching bay colony but atleast they're still running the line. Looking for more landish industrial park videos....I enjoy them too! 👍👍👍👍

  • @RobertPaniagua
    @RobertPaniagua Месяц назад +2

    Maybe they should fix the tracks and have this used for passenger service to North Dartmouth or even further west

  • @joshbenton4080
    @joshbenton4080 Месяц назад +2

    Wow, I'd say MC NEEDS to do a track rehabilitation project on those tracks! (Those freight engines and cars displayed the "rocking" that most train videos from the 1970's had shown) These tracks look almost as bad as the Milwaukee Road's tracks, just before they went bankrupt in 1977. Do these tracks on the Watuppa Branch still have the New Haven's 107 Pound rail? I know the crossings have heavier rail, as there's "compromise bars" joining the lighter rail to the heavier rails.

    • @alwhalen3488
      @alwhalen3488 Месяц назад +3

      New Haven 100 lb rail on most of the line. Some 107 in spots. Crossings have 132 or 136.

    • @joshbenton4080
      @joshbenton4080 Месяц назад +1

      @@alwhalen3488 Thanks Al, I thought the crossings had probably 115 Pound rail. (I didn't know there's "compromise bars" for 100 - 132 rail or 107 - 132) In my neck of the woods, the rail line has mainly 115 rail, with the oldest sections still with the B&O's 100 pound rail from the 1930's or early '40s. The most recently installed tracks are with 132 "Ribbon Rail".

  • @pstr_93
    @pstr_93 Месяц назад +2

    Hey sweet video! are there certain days this job runs? or an as-needed basis?

  • @normrosen9404
    @normrosen9404 Месяц назад

    The Bells have a catchy beat

  • @lloydsheck1268
    @lloydsheck1268 Месяц назад +1

    Time for new Rail

  • @BG-sl9lv
    @BG-sl9lv Месяц назад +5

    Weebles Express

  • @davidklauer3422
    @davidklauer3422 Месяц назад +6

    Miss the old south coast
    Wonder what they’re doing with the locomotives

    • @1361057
      @1361057 Месяц назад +2

      Huh??? Are they out of business?

  • @bethanybarrow4380
    @bethanybarrow4380 Месяц назад +3

    Will Shawmut Ave ever get gates?

    • @alwhalen3488
      @alwhalen3488 Месяц назад

      It just got upgraded to LED lights, a new cantilever and a second bell about a week before MC took over. Not a busy enough street or rail line to warrant gates.

  • @cmphighpower
    @cmphighpower Месяц назад +1

    50 years of deferred maintenance

  • @seamusoreilly804
    @seamusoreilly804 Месяц назад +3

    Wanna’ see rough? Watch some of the videos of Indian trains. It’s a miracle they can stay on the tracks.

    • @25mfd
      @25mfd Месяц назад +2

      EXACTLY... and for what it's worth, the track seen here certainly could use work but it's not that bad... like you said, there IS worse out there... WAY worse

  • @NormanJaquemotRebel
    @NormanJaquemotRebel Месяц назад +2

    Not fixed yet? Gee, I thought Spencer Gwendolin was gone...

  • @bigbilly7865
    @bigbilly7865 Месяц назад +3

    🚂🚂🚂🚂🚂🚂🚂🚂🚂🚂

  • @waynelkohrjr.8557
    @waynelkohrjr.8557 Месяц назад +1

    What keeps that engine on the track's.

  • @fhowland
    @fhowland Месяц назад +2

    Why two locos?

  • @islandnightowl
    @islandnightowl Месяц назад +1

    Newbie question. Why are the rail/tracks so bowed and twisted please?

  • @petercole8798
    @petercole8798 Месяц назад

    When is the new Fall River New Bedford Line Starting Up. Is This Rail Line Part Of It.

    • @WesternNewYorkRailfan420
      @WesternNewYorkRailfan420 Месяц назад +1

      No, this portion is freight only, believe it’s set to begin operation next year

  • @wrjidema
    @wrjidema Месяц назад

    How many customers at the Watuppa branch?

  • @hemihead68
    @hemihead68 Месяц назад +1

    bouncy bouncy

  • @svenmartin840
    @svenmartin840 Месяц назад

    I hope one day they get the funds from the federal government to improve the the trackage and the railbed

  • @peterharvey1762
    @peterharvey1762 Месяц назад +1

    Is this America or rural Asia ? Those lines are way out of gauge

  • @MiguelNavarreteCruz
    @MiguelNavarreteCruz Месяц назад +1

    Que bonitos árboles donde pueden comer frutas los maquinistas

  • @haroldreardon1407
    @haroldreardon1407 20 дней назад

    Its simple. When you are delivering 10- 20 cars a week ( guessing ) your railroad can NOT be a 70 mph high speed carrier. You can still work at 10 mph.

  • @ulrichfrank4270
    @ulrichfrank4270 Месяц назад +1

    Cannot understand how something like this can get a license to operate.

  • @ryansaylor6043
    @ryansaylor6043 Месяц назад +3

    How do those tracks get to be in such a state of disrepair? Whose job is it to maintain them. Can't believe this is the 21st century and we have railroads looking like they were laid in the civil war era.

    • @dannyhonn973
      @dannyhonn973 Месяц назад +2

      Depends. Railroad if owned by them. If leasing from state, they might have to pay for it. Could be railroad would have to get FRA loans to upgrade track, pay it back

  • @waynelkohrjr.8557
    @waynelkohrjr.8557 Месяц назад +1

    Why don't they fix their railroads I think the ties need replaced.

  • @etevejames4264
    @etevejames4264 Месяц назад +2

    its 2024 . why dont they fix the track. its dangerous even at 5 miles per hour

  • @RaulGonzalez-jg8ks
    @RaulGonzalez-jg8ks Месяц назад

    Dan pena ajena con esas vías.

  • @paulrogers4443
    @paulrogers4443 Месяц назад +1

    Playing pretty fast and loose on such badly maintained track! Accident looking to happen!

  • @patricknoveski6409
    @patricknoveski6409 Месяц назад +1

    Isnt that against the law.? Any law?😅

  • @billyhowell1677
    @billyhowell1677 Месяц назад +4

    Man that's sketchy as hell.

  • @wowcoolrex1040
    @wowcoolrex1040 Месяц назад +1

    the railway looks like s**t